Loading...
HomeMy WebLinkAboutConstruction Drawings_Part6 \GENS m = N R R ABBREVIATIONS GRADING NOTESo ¢� , 16970 CL CENTERLINE 1. CONTRACTOR SHALL OBTAIN ALL NECESSARY EROSION AND SEDIMENT CONTROL AND EPA NPDES PERMITS PRIOR TO EX EXISTING GROUND STARTING WORK. 7-12-24 FFE FINISHED FLOOR ELEVATIONFG FINISHED 5' SIDEWALK FL FLOW LINE GRADE 2 GEOTECHNICAL REPORT ��CLEARING AND GRUBBI NG SHALL CONFORM TO ISPWC SECTION 201 AND THE RECOMMENDATIONS OF THE PROJECT Qj� E M�G�P`ZP PAD ELEVATED 4" ABOVE BACK OF GRVL EDGE OF GRAVEL co I SIDEWALK (MEASURED AT CENTER OF LOT) I HP HIGH POINT 3. EXCAVATION AND EMBANKMENT SHALL CONFORM TO ISPWC SECTION 202 WITH CLASS B COMPACTION AND FOLLOW v INV INVERT THE RECOMMENDATIONS OF THE GEOTECHNICAL REPORT. J 0 25 50 100 150 ME MATCH EXISTING RIM RIM ELEVATION 'n 4. NO GRADING IS PERMITTED ON ADJACENT PROPERTY. MATCH INTO EXISTING GRADE 2' FROM PROPERTY BOUNDARY. w Y \ \ \ \ TRC TOP BACK OF ROLLED CURB NO DRAINAGE SHALL BE ALLOWED TO PASS FROM THE PROJECT SITE ONTO ADJACENT PROPERTY. //.\//.�//.�//.\//.�//.� %//%//%//%//%//%//%//%/%//%//%//%//%//%//%//%//%//%//%//% /.�//.\//.�//,�//,�//.�//.�//.� NC TOP BACK OF VERTICAL CURB 1 SCALE: 1" = 50' \�\\�\\r TOA TOP OF ASPHALT 5. ANY UNCONTROLLED FILL ENCOUNTERED BENEATH PROPOSED BUILDING PADS AND DRIVE AISLES SHALL BE J A/ w a TOC TOP OF CONCRETE EXCAVATED TO SUFFICIENT DEPTHS TO EXPOSE COMPETENT NATIVE SOILS, REPLACED, AND RECOMPACTED. �W oZ E 15.00' 15.00' \ y o w ��\\r�\ �� 8. PRIOR TO PLACEMENT OF ANY GENERAL FILL, THE SITE SUBGRADE SHALL BE PREPPED IN ACCORDANCE WITH THE > D 0) GEOTECHNICAL REPORT. THE PREPPED SUBGRADE SHALL BE OBSERVED AND APPROVED BY THE PROJECT — a L 't vLL_ C) 00 GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF FILL MATERIALS. f 1 � 00 TYPICAL LOT GRADING DETAIL 1 9. FILL PLACED TO DEVELOP BUILDING PADS SHALL MEET THE REQUIREMENTS FOR GENERAL FILL. GENERAL FILL USED LI X p0-1'� O SCALE: NOT TO SCALE C3.0 FOR SITE GRADING MAY BE OBTAINED FROM ON-SITE EXCAVATIONS OR APPROVED BORROW SOURCES. GENERAL FILL p rn I MATERIAL SHALL HAVE A MAXIMUM PARTICLE SIZE LESS THAN 6 INCHES AND SHALL BE FREE OF EXCESS MOISTURE, cn N m w "' ` ORGANIC MATTER AND DEBRIS. REFER TO THE GEOTECHNICAL REPORT FOR ADDITIONAL REQUIREMENTS. a - o co E 10. ALL AREAS OF CONSTRUCTION SHALL BE STRIPPED. STRIPPING SHALL CONSIST OF REMOVING THE TOPSOIL HUMUS. u N II ��\\����G� STRIPPED MATERIALS SHALL BE PLACED OR STOCKPILED BY THE CONTRACTOR ON THE SITE AS SHOWN ON THE ra PLANS AND PER INSTRUCTION BY THE OWNER/DEVELOPER, OR HAULED OFF SITE TO AN APPROVED LOCATION. 11. THE CONTRACTOR SHALL CLEAN ALL SPILLED DIRT GRAVEL OR OTHER FOREIGN MATERIALS CAUSED BY THE CONSTRUCTION OPERATIONS FROM ALL STREETS AND ROADS AT THE CONCLUSION OF EACH DAY OR OPERATION. , N \\��\� ��� tih� \ 6� $ \\�+ CLEANING SHALL BE BY GRADER AND FRONT-END LOADER, SUPPLEMENTED BY POWER BRUSHING AND HAND LABOR 6w .9tK UNLESS OTHERWISE APPROVED BY THE CITY. THE CONTRACTOR SHALL FOLLOW CITY AND DEQ EROSION CONTROL \ \ h6ti ? \\\i �l h0•-�� \ �`' PROCEDURES. w I I \�� tih �h,G °0 12. AS SOON AS PRACTICAL AFTER COMPLETION OF ALL PAVING, THE CONTRACTOR SHALL REMOVE ALL DIRT, MUD, ROCK N N 2 W �� \ \ F ti �• GRAVEL AND OTHER FOREIGN MATERIALS FROM THE PAVED SURFACE AND STORM DRAINAGE SYSTEM. o 0 I / \\ \\��\ \ h h \ \ 0 13. CONTRACTOR SHALL RETAIN AN INDEPENDENT TESTING LABORATORY FOR FIELD QUALITY CONTROL OF ALL BACKFILL o o I I N, 2 �� FUTURE , `'� 0 AND ASPHALT. FIELD QUALITY CONTROL SHALL BE IN ACCORDANCE WITH ISPWC SECTION 204.3.4 AND SECTION (o � I I I SEEPAGE BED ' �� \ hh� °� F+ o o a wl I Lo �, I�' ����\�\ \��\ \\ ti h`1 0 + 810.3.13. COPIES OF ALL TEST RESULTS SHALL BE PROVIDED TO THE CITY OF BOISE FOR REVIEW. w I I I I N N FG� I '� \��\ s h + ��a 14. ALL UNSUITABLE MATERIAL SUCH AS SOILS, TRASH, AND VEGETATION SHALL BECOME THE PROPERTY OF THE _ \�\as CONTRACTOR AND PROPERLY DISPOSED OF OFF SITE. w \ I I I I \ �a\as�s°� \ N hh`� o� �+ z cl �„I �" I I I sso sss\ ma`s \s \ \ N / ti hti' + g '� I \ ° s sZ '\� N h ti F, 15. THE CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL SOILS REPORT PREPARED BY ATLAS TECHNICAL w 50 I I I \\ ° \\ \ `� �' \ \�\�\ \\ \ 40 hh �� F� CONSULTANTS LLC DATED JUNE 10, 2024, PROJECT NO. B240786g. o I ° ° o \\\ �\ \ \ h hh' + I Q 6 �O °� `� \ \ °'��� �hhh �h`' �+ I 16. ABANDONED BUILDINGS, TEST PITS OR WATERWAYS LOCATED WITHIN CURRENT OR FUTURE RIGHT-OF-WAY SHALL BE p w RE-EXCAVATED TO NATIVE SOIL AND BACKFILLED WITH STRUCTURAL FILL PER ISPWC SPECIFICATIONS. PROVIDE SOILS Q o DATA TO VERIFY NATIVE MATERIAL MEETS THE REQUIREMENTS FOR ENGINEERED FILL PER ISPWC SPECIFICATIONS AND cy N Z cI) ti F 2s �� \ ti\ n\ hh �h F ti N `1 A COPY OF THE COMPACTION TESTS. I aLhh h'��� �c s'd�, \\ \ rLhh �,h'� ��a FG / ryhh F+ o z o o h hh ,o FG > tV �+ , z I I I ti 2552 w / h ` hh + 255 p �+ o n a '6& FG o` 1+ c� Q (IV N �,I � w ho /�+ Z 'D `'�� + Ld III O LL h•D h`/ NOTE: DO NOT BACKFILL MARVIN I II I IIII o S TILEDLATERAL UNTIL DITCH I z I AND APPROVED BY NMID I I I I oI ohhLu 0 I o I m - II I �h I \ \ \ m Q 6 I h ` 150 / �h1 FG ti\ hhh� �o�O �� II i I I DESIGNED: C. GRAHAM hh' G \ \ \\ �ti 2s I / hh h° FG ti hrO' 6 + u I tih O� F�' 2ss I t I t I F \ ,FUTURE t\\ \ \ �G1 �c S?�i• o I ` \ \ \\ ti �hh�`' �.\� �C� /' N �Lh h,�ro'` �`'�.� �� o li I I I I DRAWN: L. HAASE W Q I '� O �' \1 ti \ ! 0 1 _ j i N - I I hh�� c ?s01 I �hh�,. SEEPAGE BED ( �hhry.\ \ \�\ I o I — — — — 2Ss3\— \ \ \ \ \ �hh hoh FG G �hh6 6�� I II 11 I I I CHECKED: C. GRAHAM w I ti \\ c\ - — tih h� hh II IIIII I I Z�� I / III I I II I II II h �hhhh h�� hhoti o. 2552" _ �, ss2?emsI, I I _tih FhG�'y h` \ �\I\2\\s s\\\\\\\�\\\h�h h�h oGtiy_�h,�\\;s�\\s\\c\���.?s\�\s�s\\s\\\a�\s s\\���\�,�<c\�C.?s\sss ss��??\ ,II �\ To° IIII tih h���tiC,,'�6— — — — — — titihh`�'C���, \2°s\C sA-�SS,R�°I �I I 255° \�� \\,�c 2-s�ss r�;, �s �- `�hh h h yl�. tih�GG j'` �hG�• F �� �tih h�O tihh e ti r�6 �6 h• 6 II IN�I II II I I I II I II I II I I APPROVED: C. GRAH AM\ FG9 O ° s 4�1'� .% I\ 2554 PREPARED FOR: \ o + O m F FUTURE G20 LLC LLJP BOX 593 2554 o SEEPAGE BED ,� h o I I _LI 1 1 EAGLE ID 83616 I I I hti. ss, 6� ri II I 2 -A's z / 2553 s Q p, 2554 I II II�h N w n I I 2553Q c \ 10 a 4); Y \\\ ti Ir �� m V F,G �� nh �h I I shy I� I F o O I I/ h o. °� °° \'��, s� I \\� \ \ oo\ T ss I F o -� as F 2ss I I I I A� FG o N w I ,� S ti \ \ \ h g�• F aa+ s� a 1 hh I s ti cf) I 1 I �hhy. i I � �: � \ , 2ss \\\ ���, Fc\ \ FG 2s ryhh h°o � As C, so GRADE I I I h 0 G 6' G� I BREAK q', I \ �,I, s� I I Fo h ti F > I w I 6�ti I ,yhh hhh \ 8• I �\ h10- \�\ >\ \ hhti ° ��,; I Z9 2ss ti hhh' ,w FG ti I tihh FG , I 1 f o `� \ tih A26, I a ti tihhh h6� FG • / I I I I VIP. o I I I �° tih �'°sss I I FG 2ss I FG�\\� \ \ ��, 2s I ss hh �� FG I III o I I I hh' 2s• yti h� ° �,� I I hb \\� � h`° '�° sl I o a c a`Ps hhh o`O FG I I I I Z V) O tih - 2ss3— I I hh hh s hh�.\��\���/)); \ h,,�h s•I F 2ss s as ti ho. o I I I I ss p I ti ti ti- \V// ti I I ��5 �'° 3�e, 'o. c� s� a �h oti F o� ° sss. I I I Z z a I I M I co h`°� I I �`' FG 2s I T�FF�' : \ FG a �hh 6ph I I I I �hh I I I Z Q o I N I N tih o� FG 2ss I hho tK a_ I I . ° R I I �hh _ _ _ �hh A• I �hh� \ h`'�• °s" I II �G sss 2sss . a I I I I F y �, sss �I III I ♦I I h`' I ti 1 i I 3 s o ° a l l Q w I �, 2 G ° 2s• / rn. �' ss a I I I I h`° 2557 ��,_W I � J w i I I 6�b I by sss F�� 2sss I FG \��Fv\ FG 2ss 25 02 zss� / �� s�� a I �h I z I I '� �ti ° ? 2553 s l I I g c/) I I w I I I / `Lhho1> FG 2s I I tihhh \ `Lhh�- _ 2554 �hhy. 2554 \ \�` hh� \ �e 9R I� � �cG G 2 �' s� G�I I k°' c2sS6, Z I I w oh ° s� I 1 1 \ I ° '8' h. o F sss a. I I I ho' '�' ce l l z z I N I h5. sss I V'oe- G FUTURE FG 2s I F FG �E 2s \ - - - - - — - - - ti_h hh ho Ga �, I ti � I c0 Wg { I `' 0 SEEPAGE BED hg'� �c sss,I I— 0� eo, .� S �L— — tih I I F2 I° ? h F FUTURE oI - -II / � 2554 I �h �h �h _ _ tiSEEPAGE BEDI I I I— — — — — _ �hh \ �6� \ III I hh6 �, I I / �° e� �,2ss I ocn - - - - - - - - F�' , ��' , ' '— — hh e� F�' I ti I �C 1 x I hh ° �s I o6 06 _ \ E� N ? I N III / tih �' 01 - - - - - - - - - - - - - h°`' h°` \ V w I I I I - -hh1�h - - 2554 — — / tih - - - - -2553 �^ - - - - - - __ \ tih �. I I I I Lhh6'L I \0 1(0 _ I I_ I /I AEG G 2sss I O ® — — — —�6 // - - - - - - - - - - - -N tihh�� hhh60 I �G� 2sss, NI jl II Q Q Y I I — -2557.61' EGF EG - I �Im FG _ o_ ti� ryh _\� , \ I hh6 �,' p I I I I TOW 2���2 h IDS / _ _ 554 — — F G FG hh 2556 III I � I 25� / 4 U) FUTURE I I — — — 255 — — — N SEEPAGE BED 2ss3 ti FG hho T��; \ G, \ I ham'° �c sss IIIII V I 11 �� FG r/r 2ss 12ss 2ss 2s 2s 2s 2s 2s 2s 2� A; ° s ° SR ° sA �° SR �° sR �° �� o w I I 2557.91' 26gt�• 1 BO, 92, . I 2s, I `�6,• `�9• be B _�6• — — — — _ _ �' �G ?s I �I v o I 4 TOW 2 �2 2c 2555 N 2556 No ' _ <LO N 2sss �c hhh I G 2556 III N9j, \`1 �G I ��'� ' sss I I CSW PROJECT NO. 19005 MATCHLINE SEE SHEET C3.1 DRAWING DATE 07/12/2024 O C300