HomeMy WebLinkAboutChange Order 1 and 2 with Lea Electric for PRV Radio and Power Installation
CHANGE ORDER NO.2
DATE OF ISSUANCE
7"741"
{ .
EFFECTIVE DATE
OWNER Citv of Meridian
CONTRACTOR: Lea Electric. LLC.
CONTRACT: PRV Radio and Power Installation. Phase 2
Description: This change order consists of the following work:
· Removal of original cable connectors and installation of new cable connectors at three PRV locations. This work
was not anticipated because it was not known that the connectors were too big to fit in the 1-inch conduit.
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 53.381.00
Net Increase (Decrease) from previous Change Orders
No.L to -.L
$ 1519.00
Contract Price prior to this Change Order:
$ 54.900.00
Net increase (decrease) of this Change Order:
$ 1.335.00
Contract Price with all approved Change Orders:
$ 56.235
RECOMMENDED
~
Kyle Radek. PE Staff Engineer
~~~
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion:
Ready for final payment:
(days or dates)
Net change from previous Change Orders No. _ to
No. -
Substantial Completion:
Ready for final payment:
(days)
Contract Times prior to this Change Order:
Substantial Completion:
Ready for final payment:
(days or dates)
Net increase (decrease) this Change Order:
Substantial Completion:
Ready for final payment:
(days)
Contract Times with all approved Change Orders:
Substantial Completion:
Ready for final payment:
(days or dates)
\ \ \I /I
APPROVED ATTEST
T"';;'~ illiam G. BO/g. Jr. C'
Sit it If, h Iv It l-o(L.L, Pre J/e( ~,.;r ::
Date: 9-26-p6 Date:
Date:
EJCDC 1910-8-8 (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the
Construction Specifications Institute.
CHANGE ORDER NO.1
DATE OF ISSUANCE
NO.1
EFFECTIVE DATE
~~~~
. f
OWNER Citv of Meridian
CONTRACTOR: Lea Electric. LLC.
CONTRACT: PRV Radio and Power Installation. Phase 2
Description: This change order consists of the following work:
· Upgrade antenna cables at three locations to larger cable. Contractor discovered after project was awarded that
specified cable would not function properly at lengths required at these locations.
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 53.381.00
Net Increase (Decrease) from previous Change Orders
No. -1L to -1L
$ 0.00
Contract Price prior to this Change Order:
$ 53.381.00
Net increase (decrease) of this Change Order:
$ 1.519.00
Contract Price with all approved Change Orders:
$ 54.900.00
RECOMMENDED
~gineer
Date: .%be;
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion:
Ready for final payment:
(days or dates)
Net change from previous Change Orders No. _ to
No. -
Substantial Completion:
Ready for final payment:
(days)
Contract Times prior to this Change Order:
Substantial Completion:
Ready for final payment:
(days or dates)
Net increase (decrease) this Change Order:
Substantial Completion:
Ready for final payment:
(days)
Contract Times with all approved Change Orders:
Substantial Completion:
Ready for final payment:
(days or dates)
Date: 9- -/96
~~~ J, c:;i:, ~
/11
II
I....
1'...
~
'\
~)),
''::0
9....iz - P, 8't'(!lJ'. L
-.: .lb;..li.. _
::: ,tJ:'::
~ ~ ~ ~
~ ~ '/.0:::
~ ""'fA '~r 1\1.... . "",I ~.~>
// 'I.{.., ~ 'i>).:r .;:-
....... "7 ~
/" (v-., ... ...J .;:-
/,1'/ .~l-\" ,\'\
/111 \\\\
/1111111111\\\'
EJCDC 1910-8-8 (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the
Construction Specifications Institute.