Loading...
HomeMy WebLinkAboutSundance Subdivision No. 5 FP-06-042 BEFORE THE MERIDIAN CITY COUNCIL C/C September 26, 2006 IN THE MATTER OF THE ) APPLICATION OF DAVE EVANS ) CONSTRUCTION FOR FINAL ) PLA T APPROVAL OF 12 ) COMMERCIAL BUILDING LOTS ) ON 3.77 ACRES IN AN L-O ZONE ) LOCATED ON THE NORTHEAST ) CORNER OF WEST USTICK ROAD ) AND NORTH MERIDIAN ROAD IN ) A RESUBDIVISION OF LOTS 21, ) 22, 25, AND 26 OF SUNDANCE ) SUBDIVISION NO. 3 LOCATED IN ) THE SW ~ OF T. 4N., R.1E., ) SECTION 31 CASE NO. FP-06-042 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council for Final Plat approval pursuant to Unified Development Code 11-6B-3 on September 26, 2006, and the Council finding that the Administrative Review is complete from Kristy Vigil, Assistant City Planner for the Planning and Zoning Department, and Michael Cole, Development Services Coordinator for the Public Works Department, dated: Hearing Date: September 26, 2006, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of "PLAT SHOWING SUNDANCE SUBDIVISION NO.5 A RESUBDIVISION OF LOTS 21, 22, 25, AND 26 OF SUNDANCE SUBDIVISION ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUNDANCE SUBDIVISION NO.5 I (FP-06-042) Page 1 of 4 NO.3 LOCATED IN THE SW ~ OF T. 4N., R. IE., SECTION 31, BOISE MERIDIAN, MERIDIAN, ADA COUNTY, IDAHO 2006, HANDWRITTEN DATE: 07/13/06, SHEET 1 OF 3, TOOTHMAN-ORTON ENGINEERING COMP ANY", DAVE EVANS CONSTRUCTION, Developer, is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council from Kristy Vigil, Assistant City Planner for the Planning and Zoning Department and Michael Cole, Development Services Coordinator for the Public Works Department, dated: Hearing Date: September 26, 2006, listing 14 SITE SPECIFIC REQUIREMENTS/FINAL PLAT and 11 GENERAL REQUIREMENTS, a true and correct copy of which is attached hereto marked Exhibit "A", and consisting of 4 pages, and by this reference incorporated herein, and the response letter from Travis Burrows with Dave Evans Construction and Tim Mokwa with Toothman-Orton Engineering, a true and correct copy of which is attached hereto marked Exhibit "B" and consisting of 1 page, and by this reference incorporated herein. 2. The final plat upon which there is contained the Certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: 1. The Plat dimensions are approved by the City Engineer; and 2. The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site improvements. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUNDANCE SUBDIVISION NO.5 / (FP-06-042) Page 2 of 4 NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight (28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian, pursuant to Idaho Code S 67-6521. An affected person being a person who has an interest in real property which may be adversely affected by this decision may, within twenty-eight (28) days after the date of this decision and order, seek a judicial review as provided by Chapter 52, Title 67, Idaho Code. By action ofthe City Council at its regular meeting held on the .:>to1'- day of Se.p+em~Y" ,2006. ATTEST: SEAL -:- -,: .,. Cb. ....#._ ~ (') \..""f.ttr 1S1" . .f? g ..-;..... #If ~ .$' ///... Q..... UvV i) \\'~' .../....-'\J{}fltI. ,. \\' III \ \ \ 11111111111\\\ ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUNDANCE SUBDIVISION NO.5 / (FP-06-042) Page 3 of 4 Copy served upon: V Applicant .../ Planning Department V Public Works Department v/ City Attorney BY:~>t 0lm ~~H 0 1\...' City Clerk's Office Dated:~Cr ld -OlP ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR SUNDANCE SUBDIVISION NO.5 / (FP-06-042) Page 4 of 4 CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT STAFF REPORT: ~rldi~ .~ '; \ )< J.D. \HO J ~'*'(' "". ~.~ r:r Kristy Vigil, Assistant City Planner '{JI , ".~r",,---OIf.Y. ",,'i- '. ~ Michael Cole, Development Services Coordinator fY\ C Hearing Date: September 26, 2006 Transmittal Date: September 14,2006 TO: Mayor and City Council FROM: SUBJECT: Sundance Subdivision NO.5 Request for Final Plat Approval of Sundance Subdivision No.5 Consisting of 12 Commercial Building Lots on 3.77 Acres in an L-O Zone by Dave Evans Construction (File# FP-06-042). We have reviewed this submittal and offer the following comments and conditions of the applicant. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Council: APPLICATION SUMMARY & LOCATION The applicant, Dave Evans Construction, has applied for final plat approval of 12 commercial building lots on 3.77 acres of land for Sundance Subdivision No.5. The zoning designation for the proposed subdivision is L-O. This site will be composed of 19% of Landscaping, 27% of Building, and 44% of pavement. Sundance Subdivision No.5 is located at the northeast comer of Ustick Road and Meridian Road, in Section 31, T4N, RIB. This property has been previously platted during Sundance Subdivision No.3. This site includes Lots 21, 22, 25 and 26, Block 7, Sundance Subdivision No.3 The City Council approved the preliminary plat for Sundance No.5 on July 17, 2006 and the submitted fmal plat substantially complies with the approved preliminary plat. Staff recommends approval of Sundance Subdivision No.5 with the comments and conditions stated in this report. SITE SPECIFIC CONDITIONS 1. Applicant is to meet all terms of the approved preliminary plat (PP-06-014), conditional use permit (CUP.06-011), rezone (RZ-06-001), vacation (V AC-06.004) and development agreement (Inst. No. 106133465). 2. The applicant has indicated that the pressurized irrigation system in this development is to be an extension of the system in Sundance Subdivision. The applicant shall prove that the system can handle the extra needs of the additional lots within this subdivision, and submit written approval from the owner/operator ofthe system. 3. The City of Meridian requires that pressurized irrigation systems be supplied by a year-round source of water. If a single-point connection to the potable water system is used, the developer shall be responsible for the payment of assessments for the irrigable common areas prior to signature on the final plat by the Meridian City Engineer. Exhibit "A" FP-06-042 Sundance Subdivision NO.5 FP.doc PAGEl CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT 4. The applicant shall provide a 20-foot easement for all public water/sewer mains outside of public right of way (include all water services and hydrants). 5. Prior to signature on the final plat by the City Engineer submit a copy of the recorded cross~ access and maintenance agreement, and include the instrument number on the face of the plat. 6. Label the portion of Lots 2 and 6, where they extend into the landscape street buffers, as no vehicular access. 7. All fencing installed on the site must be in compliance with UDC 11-3A-6 and 11-3A-7. Temporary construction fencing to contain debris shall be installed at the subdivision boundary where permanent fencing does not exist. Perimeter fencing shall be installed prior to release of building permits for this subdivision. 8. Sanitary sewer and water service to this site is being proposed via extensions of existing mains installed in Sundance No.3. Applicant will be responsible to construct the sewer and water mains to and through this proposed development. Subdivision designer to coordinate main sizing and routing with the Public Works Department. Applicant shall execute City of Meridian standard forms of easements, for any mains that are required to provide service. 9. Any existing domestic wells and/or septic systems within this project will have to be removed from their domestic service per City Ordinance Section 9-1-4 and 9-4-8. Wells may be used for non-domestic purposes such as landscape irrigation. 10. Revise the following plat notes on the face of the plat prepared by Toothman-Orton and dated 7/13/06: 5.) Revise to read, "Direct lot access to Ustick Road and Meridian Road is prohibited except those specifically shown on this plat. Direct access to U stick Road may be prohibited in the future, if ACHD deems it necessary." *.) Add note, "Maintenance of any irrigation or drainage pipe or ditch crossing a lot is the responsibility of the lot owner unless such responsibility is assumed by an irrigation/drainage district. " *.) Add note, "Bottom of building footings shall be a minimum of 12 inches above the established normal high groundwater elevation. *.) Add note, "This subdivision is subject to the terms of a Development Agreement recorded as instrument No. 106133465, records of Ada County, Idaho. 11. The landscape plan, prepared by Toothman-Ortman and dated 7/13/06, shall be revised as follows: a. Show the existing landscaping on the plan. Submit three copies of the revised landscape plan to the Planning Department prior to signature on the final plat by the City Engineer. 12. Submit a copy of the Ada County Street Name Committee's "Final" letter for the street names and lot & block numbering. Make all corrections necessary to comply. 13. All areas approved as open space shall be free of wet ponds or other such nuisances. All stormwater detention facilities incorporated into the approved open space are subject to UDC 11- 3B-ll and shall be fully vegetated with grass and trees. Sand, gravel or other non-vegetated Exhibit "A" FP-06-042 Sundance Subdivision No.5 FP.doc PAGE 2 CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT surface materials shall not be used in open space lots, except as permitted under UDC ll-3B- 11. Where the applicant has submitted a preliminary landscape plan and where staff has reviewed such plan, the landscaping shall be consistent with the preliminary plan with modifications as proposed by staff. If the stormwater detention facility cannot be incorporated into the approved open space and still meet the standards of UDC 11-3B-ll, then the applicant shall relocate the facility. This may require losing a developable lot or developable area. It is the responsibility of the developer to comply with ACHD, City of Meridian and all other regulatory requirements at the time of fmal construction. 14. Staff s failure to cite specific ordinance provisions or conditions of the preliminary plat does not relieve the Applicant of responsibility for compliance. GENERAL REQUIREMENTS 1. Per UDC 11-3A-6 all irrigation ditches, laterals or canals, exclusive of natural waterways, that intersect, cross or lie within the area being subdivided shall be covered. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association (ditch owners), with written approval or non-approval submitted to the Public Works Department prior to plan approval. If lateral users association approval can not be obtained, alternate plans will be reviewed and approved by the City Engineer. 2. A letter of credit or cash surety in the amount of 110% shall be required for all uncompleted fencing, landscaping, amenities, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the fmal plat. 3. All development improvements, including but not limited to water, sewer, fencing, micro-paths, pressurized irrigation and landscaping shall be installed and approved prior to obtaining certificates of occupancy. 4. A written certificate of completion shall be prepared by the landscape architect, landscape designer or qualified nurseryman responsible for the landscape plan upon completion of the landscape installation. The Certificate of Completion shall verify that all landscape improvements, including plant materials and sprinkler installation, are in substantial compliance with the approved landscape plan. 5. Applicant shall be required to pay Public Works development plan review, and construction inspection fees, as determined during the plan review process, prior to signature on the final plat. 6. Compaction test results must be submitted to the Meridian Building Department for all building pads receiving engineered backfill, where footing would sit atop fill material. 7. Applicant shall be responsible for application and compliance with any Section 404 Permitting that may be required by the Army Corps of Engineers. 8. Applicant shall be responsible for application and compliance with and NPDES Permitting that may be required by the Environmental Protection Agency. 9. All development features shall comply with the Americans with Disabilities Act and the Fair Housing Act. 10. Any tree over 4" in caliper that is removed from the property shall be replaced by installing additional trees, being the equivalent number of caliper inches of trees that were removed. Exhibit "A" FP-06-042 Sundance Subdivision No.5 FP.doc PAGE 3 CITY OF MERIDIAN PLANNING AND PUBLIC WORKS DEPARTMENTS STAFF REPORT Required landscaping trees will not be considered as replacement trees for those trees that have to be removed. 11. Approval of the preliminary plat shall become null and void if the applicant fails to record the [mal plat within two years of the approval of the preliminary plat per UDC 11-6B-7 A. In the event that the development of the preliminary plat is made in successive phases in an orderly and reasonable manner, and conforms substantially to the approved preliminary plat, such segments, if submitted within successive intervals of eighteen months, may be considered for final approval without resubmission for preliminary plat approval per UDC 11-6B-7B. STAFF RECOMMENDATION Staff recommends avvroval of the final plat for Sundance Subdivision No.5 (FP-06-042) with the above stated comments and conditions. Exhibit "A" FP-06-042 Sundance Subdivision No.5 FP.doc PAGE 4 Sundance No.5 FP staff report Page I of2 Krlsty Vigil From: Travisb [Travisb@devansconstructlon.com) Sent: Monday, September 25.20068:50 AM To: Kristy Vigil; Mokwa, TIm Cc: Davee SUbject: RE: Sundance NO.5 FP staff report Kristy , I have also reviewed the staff report and do not have any comments or objections, either. Thanks, Travis Burrows 853-1203 n---Original Message----- From: Mokwa, Tim [mailto:TMokwa@toengrco.com] Sent; Friday, september 22,20061:24 PM To: vigilk@meridianclty.org Cc: Travisbi Davee Subject: FW: Sundance NO.5 FP staff report Kli sty - 1 have read through the attached staff report and have no comments or obj ections to [he conditions of approvaL 1 am also forwarding the StafT Report to my client (Dave Evans Construction) and requesting that they review the conditions and provide any commenls they might have to you, in writing, prior to the September 26th Council meeting, Thanks, li nl \ Illl, \'J 'i ;11..... !lil..;~L":i~.'.,' i'" ,:"llil..k"I'lll,l! ....-II~~li)\.".'\..'I...'-.llL-]1! \\\11L 1~1'h.ll;l': i'li}l\...\,:IL"'! :111\\ 1'-; l:ill'l\1.kl.l '~]J[.\ \'('11["--,:' j,\ ll)~' Illl~-!I:;~,\J jI.,.....:l]lil...'i\1 \11\ \ I: j !I.."! q....:...' ,', "':\I~i'I~'''';''1I> i'l!'1I11d'itL'd ;111,1 ~lll:~ \ i-,'];ll.I\\I\ \\ III h...~llil i!ll\I,I...,\",\:!lll\\:i 1.1 l!tl,' !':dk'~1 ~"\!~'11l id' lll\: 1:1\\ Ii \.~~! 1r..::';l'J\\..." :L:, n:L.-.,;.....Jt~\_.Ii\ trj1~1\;lh.-' !\h.":l~:""" ,\\.',,11"11\ Jl 11l:111\\ii;i)I.,.";.'- ; ]1:\)1\,1.,,11 From: Kristy Vigil [mailto:vigilk@meridiancity.org] Sent: Friday, september 22,2006 1:10 PM To: Mokwa, Tim Cc: Tara Green; Sharon Smith; Machelle Hill Subject: Sundance No.5 FP staff report HI Tim. Attached is a copy of the final pial staff report for Sundance Subdivision No.5. Please submit 8 written response to the staff report to me prior to the Council meeting on September 26. 2006. 9/25/2006 Exhibil "]J"