HomeMy WebLinkAbout1993-12-14
MERIDIAN PLANNING & ZONING DECEMBER 14, 1993
The regular meeting of the Meridian Planning & Zoning Commission was
called to order by Chairman Jim Johnson:
Members Present: Charles Rountree, Tim Hepper, Jim Shearer, Moe
Alidjani:
Others Present: Will Berg, Wayne Crookston, Wayne Forrey, Gary Smith,
Clifford D. Babbitt, Frank W. Stoppello, John S. Shipley,
J. G. McDermot, Lydia Aguire, Raleigh Hawe, Ira Van Elg, Dave Roylance,
Marty Goldsmith:
MINUTES OF PREVIOUS MEETING HELD NOVEMBER 9, 1993:
Johnson: You all have copies of the minutes and have read them are
there any additions, corrections or deletions? We have a motion and
a second to approve the minutes, there is a minor correction necessary
on page nineteen, second paragraph, additions should be conditions
under my comments there. That is the only thing of any substance that
needs to be corrected. All in favor of approving the minutes with
that one correction? Opposed?
MOTION CARRIED: All Yea
ITEM #1: PRELIMINARY PLAT (REVISED) WITH CONDITIONS STIPULATED BY
FINDINGS OF FACT AND CONCLUSIONS OF LAW AND CITY ENGINEER FOR VALERI
HEIGHTS BY VICKI WELKER:
Johnson: It is my understanding we did not receive the revised
Preliminary Plat so we can't act on this. Is that correct for the
record? Any comments, questions?
Rountree: Do you need another motion to table? Mr. chairman I make
a motion we table that item until the next scheduled meeting.
Shearer: Second
Johnson: Moved and seconded that we table item #1 until our next
regularly scheduled meeting which will be in January, all in favor?
Opposed?
MOTION CARRIED: All Yea
ITEM #2: FINDINGS OF FACT AND CONCLUSIONS OF LAW FOR REZONE REQUEST
BY DORADO DEVELOPMENT AND MIKE SCISCOE:
Johnson: What is your pleasure?
Rountree: Well we had some need for discussion, we don't have the
Findings of Fact at this time.
Johnson: That's right.
Meridian Planning & Zoning
December 14, 1993
Page 2
Rountree: The concerns I had with this particular item are identified
in the minutes, but the establishment of the precedence of potential
of strip development starting to go out Meridian Road with this CG
zoning at that location. Two commercial establishments and an unknown
use of residency with this zoning could very well go to a commercial
use as well. It is inconsistent with our current plan I believe and
definitely not consistent with our proposed Comp Plan. If you want
Mr. Forrey to speak to some of those issues.
Johnson: Before we get to Mr. Forrey, does anyone else have any
comments?
Shearer: Every project that we have and we have a public hearing on
we get the negative side of everything, everybody is against all these
projects. This particular project is in a mixed use zone which I would
say a commercial project fits in good mixed use zone. The property
completing surrounding it or almost completely surrounding the proposed
property is owned by the same owner so if there is any lowering of
land values it will be the same owner that will suffer those. I think
that maybe government intervention is a little bit to heavy in this.
I hope that these people want to do something with their land, and
I think its their land and as long as its not damaging someone else
I think that we should grant it and that is my feeling. And as far
as strip zoning, everyone of these projects that we have put together
is going to have to stand on its own merit because we approved this
one is no sign that we will approve something else. This is zoned
a mixed use, or set up in the Comp Plan as a mixed use.
Johnson: Thank you Mr. Shearer. Anyone else have any comments, Mr.
Hepper?
Hepper: Well I'm a little bit concerned about the CG also. I think
the purpose the Planning and Zoning is to establish good planning.
I'm not 100% sure that this falls into that category. I don't have
any problems with their proposed use of a bookstore, I think that is
fairly non-obtrusive, they are not going to be causing any problems,
but is does set a precedent out in the area for CG. I'm worried about
the CG, I'd like to.
Shearer: That is mixed use, CG
Hepper: Yes, but it also allows some fairly heavy commercial, so I'd
like to maybe hear some other opinions on it.
Johnson: Moe
Meridian Planning & Zoning
December 14, 1993
Page 3
Alidjani: I do have a problem with the CG zoning also. I believe
Mr. Shearer indicated the individual owns all the land but that is
true today and tomorrow and 5 years from now, but that might not be
true 10-15 years from now and the conflict of that problem is going
to exist at a different ownership some time in the future. So I will
be against the CG zoning.
Johnson: Okay, am I reading this that you feel this needs more study
more input? Would you like to have some comments from our Planning
Director at this point? Do you have anything you'd like to add to
this Wayne?
Forrey: Thank you Mr. Chairman, members of the Commission. During
the Comprehensive Plan public hearings this was one area where citizen
input asked the Commission to expand the mixed use designation. I
think Mr. Raleigh Hawe brought that to the public testimony, that he
felt it would be appropriate to extend that farther north than just
right behind Albertson's. So the Comprehensive Plan does include this
area in the mixed use land development designation. Perhaps the CN,
commercial neighborhood zone, would be more appropriate. I think the
commercial neighborhood would still allow the bookstore and what the
owner is intending to do with the property, but if it ever sold it
would place some limitations and remove maybe the negative connotation
of commercial general. Maybe CN would be, if the applicant is willing,
and there is also the possibility of limited office, in some cases
some retail establishments can be operated in the limited office with
little more restrictions but it does give some flexibility. So maybe
the issue here is CG maybe the neighborhood type commercial would fit
better with the mixed use plan designation in the Comp Plan. That
is about the only I can offer Mr. Chairman.
Johnson: Okay, thank you very much. Does anyone have any questions
of Mr. Forrey on this issue? Mr. Crookston
Crookston: The concern that maybe leading this situation is I think
the proposed Comprehensive Plan designates this area as a mixed use
area but the proposed plan is proposed it is not active at this juncture.
The current Comprehensive Plan doesn't indicate that this area is
to be a mixed use are. The other concern that I heard when I discussed
this matter with the commission was having the entire property zoned
CG when the use is proposed were a bookstore which make it into the
CG but the Sciscoe's were going to use or proposed to use a house as
a residence and that was not in line with the CG zoning and if the
City ultimately zoned it CG the house can be used as a house for a
day or 5 years and then can be
Meridian Planning & Zoning
December 14, 1993
Page 4
converted to any other use, any other commercial use. I'm not sure
that the CG zoning itself is appropriate to place a residence into
that zoning because our Ordinances now are not a step, not inclusive
of everything below it in that zone. Just because commercial is allowed
does not mean that residential is allowed in that zone. That was just
the comments that I heard in discussing the matter of the Findings
of Fact.
Shearer: Would a CN allow that?
Crookston: No
Johnson: Wayne, briefly, would address the reason you did not prepare
Findings of Fact and Conclusions of law then.
Crookston: The reason was there was a feeling that this particular
application and the entire area needed to be discussed further to see
if that what the commission wanted to do not only with this application
but in that area since there was some feeling that this tended or would
tend to lead to strip commercial down Meridian Road and there is also
the requirement in the proposed plan about the landscaping necessary
along Meridian Road or into any entrances into the City.
Johnson: When you say the feeling you are talking about the feeling
of the commissioners? Okay, for the record. I appreciate that, thank
you. I would suggest that the call on this is probably to table this
for further study at this point, unless someone else has another
suggestion.
Rountree: Would that entail the City Planner to evaluate the potential
CG, CN and maybe Limited Office use.
Johnson: It could include anything in there you want it to include.
Rountree: Are we talking about that in terms of a study or are you
wanting us to sit down and look at it? Do you want a motion?
Johnson: I want a motion that makes you happy, whatever makes you
happy. I think we don't have any common ground, we don't have a lot
of common ground here other than things that are negative. Probably
the best thing we should do at this time is to look at it further and
involve Wayne Forrey.
Rountree: Mr. Chairman, I make a motion that we direct the City Planner
to evaluate the requested zoning change further with
Meridian Planning & Zoning
December 14, 1993
Page 5
respect to the CG, CN or office space zoning categories and provide
the commission with an evaluation of the potential effects how they
relate to the existing Comp Plan and potential problems that might
result with the future Comp Plan and present a recommendation to the
commission next meeting.
Johnson: That was a motion.
Hepper: Second
Johnson: We have a motion on the floor and a second, so stated all
in favor of that motion then? Opposed?
MOTION CARRIED: All Yea
Johnson: Wayne would you be willing to provide us with a short written
document on those items that Mr. Rountree wanted addressed, thank you.
ITEM #3: PUBLIC HEARING: REQUEST FOR A CONDITIONAL USE PERMIT WITH
A PRELIMINARY PLAT FOR KING STREET STATION SUBDIVISION BY D.J.
INVESTMENTS AND BRIGGS ENGINEERING:
Johnson: This is a public hearing, I'll now open the public hearing
is there a representative from the applicant that would like to come
forward, or the applicant himself and address the commission. You
need to be sworn by the City attorney please.
Ira Van Elg, 2408 Squire Drive, Boise, was sworn by the Attorney.
Van Elg: Thank you, I'm here to represent D.J. Investments on behalf
of King Street Station. This is a unique application for Meridian.
You probably can't see this picture, many of you may have seen it
as you were coming up to your chairs. We do have a rendering of the
proposed subdivision. This subdivision involves the development of
an Old Town Section of Meridian zoned OT, which encourages a variety
mix of uses including medium to high density residential development.
This application has a proposal that contains 20 townhouse type units,
they come in clusters of 4. There have been since we met and submitted
the application we have met with the Highway District and drawn up
some modifications to the plan to accommodate the Highway District
requirements. As you can see one of the requirements from the Highway
District was that William Street not be connected to Meridian Road,
so we have tried to accommodate that. We have connected Williams Street
to the project as a secondary access. The improved service will be
24 feet wide there. The other requirement or request that the Highway
District had was that we taper and widen Meridian Road to allow for
Meridian Planning & Zoning
December 14, 1993
Page 6
additional right of way acquisition. Starting at block 3 of that,
near the center of the development there. That has been tapered to
a 45 foot wide from centerline to the property line at King street,
right there at the corner. As far as any other requests we'd certainly
comply with the requirements of the Ada County Highway District as
far as the installation of curb/gutter/sidewalk as required,
improvements along King Street and dedication of any right of way.
I might address one particular point of interest on this application,
that is that because of the nature of this townhouse type development,
these lots are intended to be sold as individual lots which would
increase the tax base as compared to an apartment complex type
development, but because they are being sold as individual lots there
is a sideyard setback requirement that has to be met and we have
submitted a variance application and it should be heard by the Council
and it should tag this application when it reaches the Council.
Meridian's Ordinances really doesn't address such development, its
a unique nature. I believe it will be an asset to the community and
certainly does provide a mix use and a variety of housing that Meridian
doesn't have at this point, especially where it is encouraged in the
Old Town area. In response of some of the conditions of approval by
Mr. Smith, the City Engineer, item #8, I believe you have those in
your staff packages, addresses the irrigation along the east side of
Meridian Road. We understand his concern and that ditch will be piped.
As far as lighting along the interior parking areas, that will also
be addressed. One other item that you might note ont he site plan
is that there is a couple of parking spaces on your original site plans,
you'll notice that where Williams Street now comes through there were
I believe 3 parking spaces there but because we've connected Williams
Street to the development now as a secondary access those 3 parking
spaces were eliminated. We therefore, to comply with the parking
requirements 40 parking spaces we had to increase that center bay of
parking along that access drive way. And we gained one additional
parking space, we do meet the parking requirements. The only that
we would ask is that you accept the, there are 2 additional compact
spaces that should be addressed and accepted in this process. That
basically concludes my comments, I'm certainly open to any questions
that you might have at this point.
Johnson: Okay, thank you. I'm sure we will have some. Any questions
of the representative at this point?
Shearer: Yes, I was wondering if he had seen the comments from Nancy
Taylor.
Van Elg: I haven't.
Meridian Planning & Zoning
December 14, 1993
Page 7
Johnson: Nancy Taylor is filling in for Wayne Forrey on this because
Wayne has a conflict on this. He owns property near that area. Is
there anything in there you want to ask him about, do you want to give
him a copy? I know you had a reason for asking that.
Shearer: Well, I think maybe he should have a look through there and
see if there is anything in there that concerns him and should be ironed
out at this time.
Van Elg: Could I just have time to sit down and maybe you could proceed
while I review this?
Johnson: Yes, we will call you back. This is a public hearing anyone
else from the public like to come forward and address the commission
on this application? Everyone is here for a different reason, okay
your time is up.
Unknown: I have a letter here from the notice of the hearing and I'd
like for someone to read that to see how it describes that property.
Johnson: The description here. Okay, apparently Mr. Berg is aware
of the error in here, do you want to explain that for the record.
Berg: I don't know what the error is.
Johnson: Well, we can clarify that right now I think. The number
of units is that what you are concerned about?
Unknown: Well, yes.
Johnson: Because it is confusing right, it says 5 four-plexes and
then it says 25 single-family dwelling lots, is that the conflict that
you are concerned about? Do you want to address that?
Van Elg: There are 20 dwelling lots in the application, the remaining
lots would all be held in common area. Undivided common interest.
Johnson: So, this should have read 20 lots, rather than 25. I hope
that answers your question so we got a D for that. Anything there
that you would like to comment on?
Van Elg: I don't have any particular concerns.
Shearer: I didn't have any particular concerns with that its just
that it hit my box after 4:00 this afternoon, so I figured he hadn't
seen it.
Meridian Planning & Zoning
December 14, 1993
Page 8
Johnson: Thank you
Van Elg: Would you like this back?
Shearer: No, you can keep it.
Johnson: Is there anyone else from the public that would like to come
forward on this?
Rountree: I had a question about the conversation with ACHD about
the taper on lot, well I show lot 1 block 1 to King Street 245 Feet
from 40 feet from centerline, I know we have a representative from
ACHD today. I'll pose this question, did they indicate a problem from
the intersection of Meridian Road and Franklin with the 40 foot from
centerline right of way that they would be restricted to in this area
if they ever had to do any intersection improvements?
Van Elg: Perhaps Mr. Sale could address that.
Johnson: Yes, Larry we need to get you sworn and have you speak into
the microphone please.
Larry Sale, ACHD 318 E 37th, Boise, was sworn by the Attorney
Sale: Mr. chairman, Mr. Rountree, frankly we would prefer to have
45 feet of right of way for the future improvements of Meridian road
because it is identified as an arterial in your plan which is a change
of designation of what we have been working with in the past. However,
there is a fairly substantial building located immediately south of
this project the wall of which is situated 40 feet from the center
line on Meridian Road as near as we can scale from the drawing. Based
on that building and our expectation that it may be easier to go west
if we need more than 80 feet of right of way it may be easier to go
west with the road section than to acquire part of that building in
the future. We decided continue the 40 feet acquisition from Franklin
all the way north to the next street which is King Street with that
rationalization. Does that answer your question?
Johnson: Thank you Mr. Sale. Do you have any other questions?
Hepper: Nancy Taylor, work with City #3 there, it says why does the
plan not include covered parking or RV parking. Would you like to
address that question.
Van Elg: They are town home lots, the lot is very limited by several
things. It is limited by the access to Meridian Road
Meridian Planning & Zoning
December 14, 1993
Page 9
and ACHD not wanting access to Meridian Road, its limited by the overhead
power lines that run through there and a prescriptive easement that
is associated with that power line. If we are going to get the units
in we're simply not going to be able to fit in the covered parking
and meet all the setback requirements for these units. I don't believe
that in units of this, that RV parking may be that big of an issue
and I certainly believe that parking on Meridian Road or King Street
will be that big of a problem. I certainly wouldn't want to park my
RV there on Meridian Road or King Street.
Hepper: Since we don't have any elevations or floor plans or anything
like that, is this rendering that you have there is that an actual
rendering or is that just something similar.
Van Elg: No, that is an actual rendering. We do have some other
renderings, some sketches if you would like to look at those and floor
plans I do have those in my file.
Hepper: Yes, I would like to know basically what it is you are
proposing. I'm more concerned with the elevations than the actual
floor plan.
Van Elg: As you can see the elevations are very similar, oh the
floorplans.
Hepper: No, I'm more concerned with the elevations.
Van Elg: There is the front and rear elevation of each structure,
you can see they are very similar. These are individual lots, the
City Ordinance requires a 2 car garage per single family home, are
these to be sold as a single family residence, is he going to need
a variance?
Johnson: Yes, our Ordinance calls for 2 car garages minimum on single
family, so that is what these are, that is what those have to be, ask
Wayne that would require a variance wouldn't it?
Crookston: Yes.
Johnson: That would be at the Council level if they so desire.
Hepper: How about some landscaping, would you like to address that?
Van Elg: There is landscaping that is going to be proposed along King
Street. And there will be landscaping where that piping
Meridian Planning & Zoning
December 14, 1993
Page 10
occurs along Meridian Road. The remaining acreage around the
individual pads will all be held in common ownership by and landscaped
by the homeowners association. That will all be established in the
covenants it will be presented to Mr. crookston for his review.
Hepper: Is there going to be any berms or fencing?
Van Elg: At this point I don't know that there gardens planned for
it.
Hepper: Is there any fencing?
Van Elg: Is there any fencing around there?
Unknown: There will be fencing on the east side and possible some
fencing on the west side.
Van Elg: So that can be official there will be fencing on the east
side and on the west side, excuse me possibly on the west side.
Johnson: Does anyone have any further questions?
Alidjani: I have one, nobody brought it up, I want to know if you
are aware of the Idaho Power and US West asked for 10 foot easement?
Van Elg: We were under the impression that they were requiring a 15
foot prescriptive easement. And we can comply with that.
Johnson: Okay, thank you very much for your presentation. The public
hearing is still open is someone has changed their mind. If not then
I will close the public hearing, seeing no one hearing nothing. What
is your pleasure gentlemen? Findings of Fact? Our typist is having
a problem, so please try to use the mikes as much as possible, some
of it is not being picked up on tape.
Rountree: Mr. Chairman I make a motion that we have Findings of Fact
and Conclusions of Law prepared on the application for a Conditional
Use Permit.
Hepper: Second
Johnson: It has been moved and seconded that we have the City Attorney
prepare the Findings of Fact and Conclusions of Law all in favor?
Opposed?
MOTION CARRIED: All Yea
Meridian Planning & Zoning
December 14, 1993
Page 11
ITEM #4: PUBLIC HEARING: REQUEST FOR ANNEXATION AND ZONING WITH A
PRELIMINARY PLAT FOR SAGEHEN ESTATES SUBDIVISION BY GOLDSMITH CHARTER
AND ROYLANCE AND ASSOCIATES:
Johnson: This is a public hearing, I will now open the public hearing
is there a representative of the applicant who would like to come forward
and address the commission? You need to be sworn.
Dave Roylance, 4619 Emerald, Boise, was sworn by the Attorney.
Roylance: Mr. Chairman, Commission members, I'm Dave Roylance, a Civil
Engineer representing the applicant. This is a residential
development containing 74 lots. We propose central water, central
sewer and other standard utilities. All streets shall meet the
requirements of the Ada County Highway District and the City of Meridian
and be dedicated to the public. This is a phased development and we
have shown phase one of our project tonight. May I answer any questions?
Johnson: Questions for Mr. Roylance?
Hepper: Is this an R-4 zone, is that what you are requesting?
Roylance: Yes
Shearer: I've got a question for our Attorney, do we need to reverse
the order of these. I would guess that this is not adjacent to any
city property until this other project is annexed, is that true?
Crookston: I haven't looked at the contiguousness of either one of
them.
Roylance: If I might I believe that is correct, in order for Sagehen
to be annexed that Upland Meadows, which is the next project on the
agenda, would provide the annexation route.
Shearer: Do we need to switch our agenda, or does it make any
difference?
Crookston: No, only one, the one that you are not hearing now simply
needs to be annexed prior to this application.
Shearer: So it won't make any difference.
Johnson: And it could be a condition of your motion.
Meridian Planning & Zoning
December 14, 1993
Page 12
Hepper: May I have Mr. Roylance circle the lots that have less than
an 80 foot frontage where the R-4 designation requires an 80 foot
frontage.
Roylance: That has since been corrected, that was not necessarily
done by design when we do these, it sounds a little weak, but when
we do these by computer sometimes those lines don't come out as we
expect, but anyway that has since been corrected I'm aware of that.
Hepper: Does it change the overall number of lots?
Roylance: No it does not.
Hepper: So in other words we are still pretty much looking at the
same project but just a few variations of property lines?
Roylance: That is right, if the lots did change they would go down
and not up, but we don't anticipate the number of lots to change.
Rountree: Would you hold that up again, it might answer some of the
questions I had. So you have replatted those lots at the entrance
where (inaudible) which ever that, that is a different plan than we
have.
Roylance: It is not substantially different, but none the less it
is different and we have done that to try to address some of the concerns.
Also, here in the following project, which is right across the street
here, we were requested by ACHD to align the streets of both projects
with each other even though we are not hearing that project tonight
that also did dictate a change on this project as far as the impact
to the City as far as the issues. I wouldn't think that would
substantially change but we did make minor modifications to bring this
in compliance with the City code and the requirements of ACHD.
Rountree: Did you have that discussion with ACHD with respect to their
concerns about traffic studies and that sort of thing?
Roylance: Yes we have. In fact they have requested a traffic study
and we have authorized Gary Funkhouser and his representatives and
it should be completed December 21.
Johnson: With the (inaudible) in our decision making process, when
that is done, when you do a revision in the eleventh hour perhaps you
could give us a copy of that so we would have something to look at
it at our desk or in our packets. Because we are looking at something
totally different. Fortunately, Charlie picked up on
that
Meridian Planning & Zoning
December 14, 1993
Page 13
Roylance: I apologize for that, I realize it is not good form to submit
one project and then bring in another. It was done in the spirit of
trying to make things form and not an attempt to pull a fast one, but
I do appreciate your concerns.
Johnson: There have also been canine that have graduated from college.
Hepper: What about fencing or berms, landscaping, anything up front
along the street there.
Roylance: We intend to berm along the street, you can see the landscape
lot, I hope its on your plat is on this plat.
Hepper: No it isn't
Roylance: I see, we do intend to provide a berm along Locust Grove
and we do intend to fence the perimeter of the project, we may not
fence the phase line, but we do intend to fence the perimeter. We
also intend to fence along the canal through here, along the Nine Mile
Canal.
Hepper: Would that be a metal fence along the ditch there.
Roylance: I had envisioned a cedar wood fence, if somebody required
a chain link fence then that would be considered, it isn't what I
envisioned.
Hepper: Wasn't there a note in our packet that here just recently
the City Council, maybe Wayne knows better, doesn't like the wood fences
because people burn the weeds and the fences go along with them.
Forrey: The Irrigation District
Hepper: Okay, the Irrigation District, I knew there was someone who
made a comment about it. I think the Irrigation District would prefer
to have chain link.
Roylance: Now that you mention that I'm aware of it, we would probably
like to use chain link and slats for the appearance, but they may object
to that.
Johnson: Any further questions for Mr. Roylance?
Alidjani: I've got a question, any comments regarding the 22 items
that Gary has conditioned you upon?
Meridian Planning & Zoning
December 14, 1993
Page 14
Roylance: There is nothing on Gary's list that I find out of the
ordinary that we cannot do or have not done. I can explain some of
those that maybe I deemed to be important if I miss something you would
like to hear I'd be happy to respond to it. Regarding item #1, we
did submit a legal description for annexation for only phase one of
our project and as I read condition #1 it says submit a legal description
prepared by a registered land surveyor for annexation and zoning of
the whole piece of property. That causes a small problem for us, and
the reason we didn't do that is because this is a phased purchase and
Marty Goldsmith the owner has only entered into an agreement at this
time to purchase phase 1 of the project. So that is what we would
like submit and get annexed, as I understand it the seller has asked
that he not annex other pieces until he issues and executes phase 1
of the purchase. That is the reason we have shown only what we have
shown and that is the reason the description describes just phase 1
of our project.
Alidjani: How about phase 2, 3, if you have a problem if you don't
that is fine.
Roylance: No, these are all doable things. The answer to #2 is the
same as #1. We do have a very conceptual layout for the total property
we'd be happy to share that with you but since we were asking for
consideration of phase 1 that is really at this point all I have turned
in. We do have a concept plan for the entire project for this one
and the one you will hear in a minute and I can submit that to Gary.
Regarding the well lot, we can deal with that issue, that is item #3.
We have corrected those deficiencies that are suggested here and if
we have not we will. Would you like me to go down right through all
of these?
Johnson: Well, I'd like to hear your answer for #7 and 9 which are
basically just questions.
Roylance: Okay, regarding 7, more than a 100 lots will ultimately
take access to Locust Grove Road, what other access is planned. We
have arbitrailly shown at least one stub out of the property here and
our conceptual plan over here shows another stub out to this location
and one here. At this point those are arbitrary and we get the traffic
study and when Ada County Highway District has fully read that study
I'm quite sure they will suggest where certain access points should
stubbed at the perimeter and we will do that. Right now I'm aware
that it is very likely to be a requirement and we have shown it here
and on this part we have shown another accesses here and one in this
location, but I think that will be ironed out when the traffic study
is complete and evaluated by ACHD. Mr. Johnson, was #9 the other one
you wanted
Meridian Planning & Zoning
December 14, 1993
Page 15
me to discuses?
Johnson: Yes
Roylance: Regarding the Nine Mile Drain, I'm not sure the exact status
of that, what we would like to do, if this conforms with city
requirements, is fence it at the easement or the right of way, that
is fence it at this location and fence it at this location. Which
would be the right of way lines and not tile it and let it go at that.
That is what we would like to do, that is what we have done in the
past in similar projects and we hope that is affordable.
Johnson: Any other questions for Mr. Roylance?
Hepper: I had a question on pressurized irrigation system, you said
individual lot irrigation (end of tape)
Roylance: Regarding that pressurized irrigation system, I don't know
that we have made that decision. As I understand it I think the City
Ordinance requires we address it in some fashion or another. If we
have adequate surface water rights and if they are usable for a central
system, that is some times if they are on a rotation schedule it just
isn't practical to develop an on site system. If we can do that it
would be our preference to provide an on site system, if we cannot
do that for the reasons I said or other reasons then we would like
to bond for that item. And we really haven't made a decision on that
yet.
Hepper: And right now as it stands you can pay a fee to the City for
a Well development or do pressurized irrigation system, I think they
are in the process of changing that, aren't they?
Johnson: Yes, that is my understanding that they are.
Hepper: But, at this moment it hasn't changed.
Roylance: I think it might be the City's preference to get these
facilities and I think that would be ours, if things work out and if
they don't work our we will have to bond for them.
Johnson: Okay, well thank you very much. City Engineer Smith is there
anything you would like to address at this time on this application?
You had several comments and I'm just hoping that you got satisfaction.
Smith: Mr. Chairman, Commission members, I haven't had a chance to
talk to Dave about my comments. I will need to have each one of
Meridian Planning & Zoning
December 14, 1993
Page 16
them addressed and I'm confident that Dave will be in touch with me
and we'll get answers to each of my concerns.
Johnson: Thank you Gary. Anything from ACHD at this point, Larry
Sale?
Sale: Do I need to be sworn again?
Larry Sale, ACHD, 318 E 37th, Boise, was sworn by the Attorney.
Sale: Our recommendation to the City was that the approval of a
Preliminary Plat of this project and the next project be deferred until
we had completed our review and accepted a traffic study of the area.
The question of the annexation is one which you can proceed with if
you desire, we again would request that you defer action on the
Preliminary plat. The Chairman's question about the number of lots
on the single access is a case in point. WE can allow more than 100
units to gain access to the arterial system by one route if it is a
collector route, but if that is a collector route than we don't want
those lots fronting on it what is shown on the revised layout here
tonight. So we anticipate some significant changes to the layout as
a result of our findings and I would recommend that you defer action
at this time on the Preliminary plats.
Johnson: Any questions of Mr. Sale?
Alidjani: Mr. Sale you are recommending that we defer the timing,
do you have a time table for when the study will be done?
Sale: Mr. Chairman, Mr. Alidjani, the applicants representative
indicated that the traffic study will be submitted we are able to
complete our review and submit our request for additional information
or changes to that traffic study in about 2 weeks we try to turn them
around. We try to turn them around in 10 working days. Usually then
they are, as I say in this case I anticipate some changes to the
Preliminary Plat so that might cause the applicant some additional
delay while his consultant is working on both the corrections to the
traffic study assuming there are some and the changes to the preliminary
plat.
Rountree: Mr. Sale, what is the ACHD's guide on the number of lots
to be served by a single access without a collector street?
Sale: We allow up to 100 on a local street access, above that obviously
that is an arbitrary number above that we require either a collector
or 2 local street accesses. We want the consultant for the traffic
study to meet with us prior to beginning his effort
Meridian Planning & Zoning
December 14, 1993
Page 17
because we want him to look at and we would like him also to meet with
the City Engineer so that he has an idea of that amount of land that
can be served in this sewer drainage basin because that likely will
closely resemble the transportation drainage basin that is the area
within this square mile that we would expect to be served off this
collector or this access. If it looks like there is an adequate
opportunity to access the rest of the square mile with stub street
out of this project and other collectors off of either Overland or
Locust Grove or other arterials than that pose kinds of things help
us answer Mr. Rountree's question a little more.
Johnson; Okay, thank you very much Mr. Sale. This is a public hearing,
anyone else from the public like to address the commission at this
time on this application? Yes mam, you need to be sworn as well.
Lydia Aguirre, 2620 South Locust Grove, was sworn by the Attorney.
Aguirre: Commissioners I wanted to present my case and my concerns
to you about the subdivision that is going in. First of all on the
plat that was proposed, it is incorrect and so if I could show you
this I could show you where I am in relationship to this whole
subdivision. There is a division here, here is the seller of the
property his property is here and there is another residential area
of 2 acres in this small plot and I am here, I have 3 acres, so I am
technically land locked between this residence and myself. South
Locust Grove, I don't extend into South Locust Grove, the small dirt
road that leads into my residential property.
Alidjani: I'm sorry, how do you get in right now according to this
map.
Aguirre: There is a small dirt road right here and that is how I get
in.
Shearer: That is your property?
Johnson: It is not an easement, its your property?
Aguirre: Yes, I have a concern with the subdivision because I am
technically land-locked, I'm not sure what they are proposing. I'm
backed up by that subdivision on 2 sides, one side of me where the
road is and on the back side. I would like to work with the developer
or at least have some more information on what kind of public access
I can have and I would like to keep my property so that I'm able to
develop it some future date as well. I don't know
Meridian Planning & Zoning
December 14, 1993
Page 18
whether that means stubbing a road in towards my area from that
development I'm not quite sure how that could work. I just want to
make sure the property I have is fronted correctly, aesthically, I'm
looking for cedar fences for my font yard, and I also would like to
have access to some kind of a stubbing if I do want to develop it at
some future date that it is there and accessible.
Johnson: Have you had any discussion with the developer or his
representative up to now?
Aguirre: I have not.
Alidjani: I have a question, approximately how many feet of you
easement of the road that you own?
Aguirre: I think it is about 30 feet, 30 or 31 feet. It is a small
dirt road, one lane, and that provides access for me to get onto South
Locust road and that is the only access I have to a public road.
Alidjani: When you purchased that property, were you happy with that
road at the present time?
Aguirre: I was, I also purchased this property only 3 months ago with
the understanding that there was not going to be any subdividing going
on because of the zoning, which is probably a typical comment. The
thing I'm concerned about, when I purchased this property, I moved
from Boise and the thing I'm concerned about is I moved there for
the quality of life the privacy that it provided for me. Zoning this
piece of land R-4 concerns me a little bit, I'd like to see the zoning
to be if they were 5 acre plats of 10 acre plats that would make me
and my neighbors happier. The quality of life out there right now,
there is a lot of privacy, wildlife, those are the kinds of things
that people are moving out to that area to have, and I just think to
be consistent with the planning that is going on, R-4 is a pretty densely
populated subdivision for that area.
Johnson: Okay, is that all you have to present?
Aguirre: Those are my concerns.
Johnson: Thank you very much. Anyone else from the public like to
address the commission? Yes sir, please come forward and be sworn.
John Shipley, 2770 South Locust Grove, was sworn by the Attorney.
Meridian Planning & Zoning
December 14, 1993
Page 19
Shipley: I'm also one of Lydia's neighbors. I have approximately
5 acres it will be right adjacent to, its right in front of where the
canal, the Eight Mile Lateral crosses there.
Johnson: Can you picture where that is Commissioners? Thank you
Shipley: The McDermot property is directly across the road from me
which is the other subdivision.
Johnson: Could you point that out please Wayne on the overhead?
Shipley: I would also like to work with the subdivider and I realize
that more taxes are going to be derived off of one lot than the entire
50 acres that is proposed to be subdivided. I though maybe my piece
of property could be an RV storage or something like that and its kid
of a situation if there are going to be all these houses and all these
people out there that would be an advantage to them to have a place
close to home where they could keep their stuff and still not be so
far away that they couldn't come and load it up to go camping on the
weekends and things like that. I thought that it would be a proper
proposal to address right now and I also was a little concerned about
future conflicts with kids, dogs, irrigation water. Those are things
that occur fairly frequently and the more people you get the more problem
there is. I though that the proposal to put in pressurized irrigation
was a really good proposal because that settle a lot of those problems
right off the bat and when you have people sharing water and times
and some people have to get up in the middle of the night to change
water and those kind of things it is a regular hassle and people that
are moving out there won't know anything about those types of
situations. I have lived there for 20 years I really know what I am
talking about. I becomes a real hassle and for the next 2 or 3 years
I'll continually run cattle and I don't want somebody's dogs coming
over and chasing them through the fence and what not and obviously
I won't be able to shoot them anymore. That is all I have to say.
Johnson: Thank you very much. Wayne would you point out Lydia's
property on there for me? Thank you that is where I though it was,
the land locked situation. It is only 3 acres so it has to be that
area. I didn't ask, are there any questions of the gentleman that
came forward to testify? Apparently not, anyone else from the public
like to come forward, yes sir same procedure.
Clifford Babbitt, 11881 Amity, Boise, was sworn by the Attorney.
Babbitt: I own the property the 6 acres between the 2 parties that
were just up here. And I am totally in favor of the subdivision,
Meridian Planning & Zoning
December 14, 1993
Page 20
I would like to see the drainage ditch fenced through there on both
sides for protection of kids and what else.
Alidjani: Can you elaborate more about fixed
Babbitt: Fenced. One of my concerns is that my water and these other
parties drain water runs into the subdivision there. I take it the
subdivider will move the drainage pipe up the ditch there so it will
drain into the drainage ditch, because right now it drains off of Gene's
property there which is part of this subdivision right now, and it
needs to move up the ditch so it can drain and that would be the most
logical thing to do. And I had one thing about the pressurized water,
as he stated it is a terrible problem to get these people up in the
middle of the night, they go back to bed they let the water run and
flood people, it gets to be a problem. If they do this, if you people
do require it the drainage out of my water ditch there and the rest
of them there, only waters a small section of this which would be the
west side of that drainage ditch and I wouldn't want the water for
the whole subdivision coming down my ditch trying to pressurize the
whole subdivision because that looks like water comes from another
ditch up above and that would take my water time away from me. Of
course the other thing like you said we do run cattle in there and
they do ball and when you bring new ones in the new ones ball for a
little while, and I want it on record that we were there long before
the subdivision was.
Alidjani: I have a question sir, as you were saying that wish them
to fence the ditch, is there any fencing at all around the present
ditch?
Babbitt: Just for cattle on our property there.
Alidjani: And you want him to fence that area
Babbitt: Well the 6 foot chain link fence along there, that usually
require they have in the past instead of enclosing the ditch. And
the other thing I was concerned about is the sewer, the water comes
down the side of Locust Grove there and I wanted to make sure the sewer
was going to be stubbed out on the ditch bank there going south the
property there. That would be right along the ditch bank there the
drainage ditch there and would be stubbed out to the end of the property
there, because there will be more developments south of that property
there will be more on up and I'm sure the work department a\\has already
got that proposed but I want to make that it is put int he record that
it is stubbed out that way.
Meridian Planning & Zoning
December 14, 1993
Page 21
Johnson: Okay, thank you very much any questions? Anyone else from
the public like to come forward, yes sir.
Frank Stoppello, 782 Arlington Drive, Eagle, was sworn by the Attorney.
Johnson: For the record we have a letter in our packet from Mr.
Stoppello.
Stoppello: I just wanted to briefly address that letter. I would
generally be in favor of this project, I haven't seen the 20 conditions
or the plat plan, but the only thing I was concerned about, I kind
of have a unique situation and of course everybody says that, my access
and I'll just show you my copy of this proposed development, I own
the 13 acres running along here, the drainage ditch is my western
boundary. My access goes down the canal bank and down this access
road. It is quite a long access and one of the problems that will
happen as I understand it is Mr. Goldsmith's access will be right on
Locust Grove very, very close to my access. I too bought this for
tranquility but it is obvious that it is not going to be that and it
is property that I too would like to develop. My only request would
be that there be stub into my property and some coordination of an
access whether we are talking about a 100 units or 200 units and Mr.
Goldsmith informed that his second phase, if I'm wrong on this Marty
you correct me, proposed a stub into my property around this lot 18,
my only request that it be stubbed in as part of the first phase, and
obviously I would like to coordinate with ACHD and Marty and making
sure that 13 acres doesn't get land locked because of proper access
to Locust Grove under ACHD guidelines and rules and regulations. That
is all I have.
Johnson: Any questions of Mr. Stoppello? Thank you Frank I appreciate
it. Anyone else from the public? Would you like to offer anything
David?
Roylance: Several things, we understand the concerns of Ada County
Highway District and we don't object to their request. Regarding land
locking adjoining properties, I'm not aware of that situation but if
the land owners could contact me or our firm and our number is 336-7390,
we'll be happy to work with the adjoining property owners and try to
remedy any situation that we can. I would hope in doing that, that
we are not forced to take unreasonable steps to remedy a situation
that we did not create, on the other hand we would be happy to work
with the neighborhood and do what we can to be compatible and be a
good neighbor. That is it do you have any questions?
Meridian Planning & Zoning
December 14, 1993
Page 22
Johnson: I don't, does anyone have any questions for Mr. Roylance?
Hepper: Will the sewer line be coming up Locust Grove Road or coming
up the drain ditch?
Roylance: My understanding now it will be coming up Locust Grove Road,
is that correct Gary? That is what we are looking at, it may not be
the only option that is the one under study right now.
Hepper: Even though the drain ditch is lower and you can get enough
depth out on Locust Grove to drain on out to Locust Grove?
Roylance: We think so, we've been contact with Gary and have some
preliminary designs that are currently being reviewed, and the think\\g
is we don't want to put the sewer in a location that would lock out
other properties.
Rountree: Would you be open to a (inaudible) as opposed to those people
who feel an impact or perceived impact based on your clients action
that you or your client take the effort and make the effort to contact
those adjoining property owners and try to resolve those issues?
Roylance: Well if it all right with this commission and you I would
prefer they contact us. The point being I don't know exactly what
their issues, they do. If it is put on me I might contact 2 people
not talk to the 3rd and not know what the issues,they stated the issues,
we are in the phone book we are easy to find if they have a concern
I would encourage them to contact me. I think we could do a better
job by working with the neighborhood if they contact us.
Johnson: One of the concerns that comes up David, and I'm sure you're
aware of it, when we have public hearings like this the public not
being skilled in planning and development it does require not require
but in their minds they suggest, demand that they be contacted when
some development is going on. So we have as a body endorsed the
developer to extend as much as he can in that direction so that we
are kind of cutting off the path maybe some complaints we have in the
future, and I believe we addressed that in the Comp Plan, have we Wayne?
Forrey: Yes we have
Johnson: That is a series of input sessions and of course the number
of hearings like this we get that all the time. We need to do a better
job as developers and as a City in letting the public
Meridian Planning & Zoning
December 14, 1993
Page 23
know what is going on primarily because they are naive in that area
which understandably is so.
Roylance: In light of that I will do that. Those 2 people I heard
tonight, well I guess there was 3 i could get that from them tonight
you will have that. How do I make sure I don't inadvertently leave
somebody out?
Johnson: And I don't think anyone expects you to dot every I and cross
every T with respect to that but I think just making the offer and
making yourself available and how to get in touch with you is all you
can do. If I were the developer maybe I'd go around adjoining property
owners and talk to them about the development, I don't know how feasible
that is I'm not a developer but that is something the public would
like.
Roylance: Okay
Johnson: That is why I'm making this speech. Larry did you have
anything you wanted to add to Mr. Stoppello's comments at this point?
Sale: Do I have to be sworn?
Sale: Mr. Chairman I've talked to Mr. Stoppello on the phone and assured
him that if he will contact us which he has we will consider his request
to provide access. We try to do that in all locations to make sure
all parcels have adequate access. I guess did that answer your
question?
Johnson: Yes, I appreciate your comment.
Alidjani: Larry, can I ask you a question please? How close those
entrances can be? The concern the woman had was their entrance or
exit the easement to Locust Grove would be quite close distance wise
to this subdivision.
Sale: Mr. Chairman, Commissioner Alidjani, we prefer a separation,
it kinds of depends on the level of activity of each entrance we prefer
a separation of 125 to 150 feet as a minimum along a major street.
That would emphasize our desire to make sure there was another access
provided to these properties so that they could give up their driveways
on Locust Grove.
Johnson: Okay, thank you very much. Anyone else from the public that
would like to come forward at this time? Your up.
Marty Goldsmith, 4550 W State St, Boise, was sworn by the Attorney.
Meridian Planning & Zoning
December 14, 1993
Page 24
Goldsmith: In regards to Mr. Stoppello's questions, I had not intended
on stubbing out a street until later in the plans and it was right
where he indicated, but it was not planned on being done right away.
Johnson: Was it in phase 1?
Goldsmith: Yes, we had worked with him on the location there. And
the distance is over 200 feet it is more like 250 or longer toward
these guys recorded easements, Mr. Stoppello has a recorded easement
as well as Lydia they are talking about there so the distance between
those streets is greater than required by ACHD.
Johnson: 250 feet approximately?
Goldsmith: More than. Thank you.
Johnson: Thanks Marty, is there anyone else? If not then I will close
the public hearing.
Aguirre: I do have a question on the 250 feet, I didn't realize it
was 250 feet, I thought it was less.
Johnson: Would you like to answer her question?
Sale: I'm sure I can, I think she is asking about the existing
situation.
Johnson: Your talking, is it really 250 feet, is that your question,
oh I'm sorry. I thought you were talking about the requirement. You
want to know what the actual distance is, is that your question. I
don't think anybody can answer that here except maybe Mr. Goldsmith,
we certainly can't answer that.
Goldsmith: The entrance in question is here and your easement is down
here, and this distance along the back line of Mr. Babbitt's property
is 200 and then we would need to take into account the 20 foot berm
and that 30 foot easement. There is 30 feet that has been recorded
in here. Anyway this 20 foot berm and this 200 and whether you came
from the center of this road or exactly where that measurement is picked
up. I do believe it is 200 and something and not 250. Your road is
right here correct? Okay, there is nothing there taking your road
is there?
Aguirre: But if you go 250 feet it would go down further to my road,
your 200 on Babbitt's property line and then the additional would come
down south of that wouldn't it?
Meridian Planning & Zoning
December 14, 1993
Page 25
Goldsmith: I guess the only measurement I'm sure of is this 200 and
it would actually matter whether you took into account this berm here
and whether you started from the center of this street or not. So
those are the only 3 measurements I have at this time.
Johnson: Okay, I did close the public hearing did I not?
Crookston: Yes
Johnson: What is your pleasure? Whatever we do we need to bear i
mind Mr. Sale's comments regarding the traffic study and address the
annexation.
Shearer: I move we have the Attorney prepare Findings of Fact and
Conclusions of Law for this project.
Alidjani: Second
Johnson: It has been moved and seconded to have the City Attorney
prepare Findings of Fact and Conclusions of Law, all in favor? Opposed?
MOTION CARRIED: All Yea
ITEM #5: PUBLIC HEARING: REQUEST FOR ANNEXATION AND ZONING WITH A
PRELIMINARY PLAT FOR UPLAND MEADOWS SUBDIVISION BY GOLDSMITH CHARTER:
Johnson: I'll now open the public hearing, is a representative of
the applicant of the applicant like to come forward at this time, you
need to be sworn.
Dave Roylance, 4619 Emerald, Boise, was sworn by the Attorney.
Roylance: Mr. Chairman, Commission members, you have probably heard
this pitch before but here we go again. This is a residential
development containing 77 lots. We propose central sewer, central
water and other standard utilities. All streets will meet the
requirements of the Ada County Highway District and the City of Meridian
and be dedicated to the public. May I answer your questions?
Johnson: Questions for Mr. Roylance?
Shearer: Is this Comp Plan, this subdivision plan here is no longer
valid is it?
Roylance: That is correct, we have some preliminary discussions
Meridian Planning & Zoning
December 14, 1993
Page 26
with ACHD before we design these but they are preliminary and we don't
fault us or ACHD for realizing now that these needed (inaudible) and
as soon as we heard that we started the process of amending it. I
apologize if that causes you confusion, the one we have here again
is different than the one you have.
Shearer: Okay, so you're saying that Trumpeter Drive
Roylance: We moved the location of this to accommodate the request
of ACHD. I realize that isn't the one you have in your packet, and
I apologize for that.
Shearer: So this lot ends with the other subdivision.
Roylance: Once again the traffic study and the impacts will have to
be evaluated by ACHD.
Alidjani: Any problems with Gary's comments?
Roylance: No, no problem with any of those.
Johnson: Would you address 10 for the record?
Roylance: Yes, item #10 says why isn't the total parcel being proposed
for annexation and zoning and preliminary plat at this time? What
does the street alignment look like for the unplatted area? And the
answer to that is the same, this is a phased development, and the
purchase agreement is in 2 phases and we are requesting annexation
and preliminary plat approval on the phase that Mr. Goldsmith has agreed
to purchase. On the other hand we do have a concept plan and a layout
for the entire project and we would be happy to share that with Gary
and share that with you, but that is the reason that we have shown
just phase 1 of our project.
Hepper: Does any of this project back up to Meridian Greens?
Roylance: Yes it does. Right here is the point we catch.
Hepper: Oh, its just point to point not a whole property line.
Roylance: That is right, its this point here.
Johnson: Mr. Roylance, I need to point out that in our requirement
for a preliminary plat we do require a map of the entire area scheduled
for development, if the proposed subdivision is a portion of a larger
holding intended for subsequent development. So when you have
different phases your are supposed to bring to us a map
Meridian Planning & Zoning
December 14, 1993
Page 27
showing how everything interlocks and what the development is and
that has been missing with our applications we've had so its something
we need to make a point of requiring that when we know that there is
some contiguous development that is anticipated.
Roylance: Okay, I apologize for that, I was aware of the requirement
to identify contiguous parcels you own but probably within my own lack
of studying the Ordinance I wasn't aware that we need to show a concept
for the entire parcel. And I will do that on future submittals and
we do have that information and I will get it to you right away.
Johnson: Any further questions of Mr. Roylance, Wayne do you have
your hand up, Wayne Crookston?
Crookston: Yes, Dave could you go to the map on the screen there and
just point out the Sagehen and Upland Meadows where each of them are
and how they connect?
Roylance: This is Locust Grove, this right here is Sagehen this area
here and Upland Meadows which is over here. I think this is for a
public park, this is a City map so I'm a little bit disoriented.
Crookston: So your contiguousness is through a corner of Meridian
Greens Subdivision?
Roylance: This is the corner right here.
Johnson: Any questions of Mr. Roylance?
Hepper: I've got a couple of the same questions as before we need
to address the 80 foot frontage on these lots I assume the new plat
that you have does that.
Roylance: Yes it does
Hepper: How about landscaping and fencing along Locust Grove?
Roylance: We show individual lot that fronts along Locust Grove that
will be in the neighborhood of 20 to 25 feet wide and we propose a
berm and landscaping along this lot and that will be owned i common
by the homeowners association and maintained by them.
Alidjani: No fence?
Roylance: I don't think we propose a fence at this time.
Meridian Planning & Zoning
December 14, 1993
Page 28
Hepper: That is all I have.
Johnson: Okay, thank you anyone else from the Commission? Thank you
David. This is a public hearing anyone from the public that would
like to address the Commission on this application? Do you have a
question sir? I'll close the public hearing at this time then. What
would the Commission like to do?
Shearer: I move we have the Attorney prepare Findings of Fact and
Conclusions of Law for this project.
Alidjani: Second
Johnson: It has been moved by Commissioner Shearer and second by
Commissioner Alidjani to have the City Attorney prepare Findings of
Fact and Conclusions Law, all in Favor? Opposed?
MOTION CARRIED: All Yea
ITEM #6: REQUEST FOR A REZONE FROM E-4 TO R-15 WITH A PRELIMINARY
PLAT FOR SCOTTSDALE ESTATES SUBDIVISION BY ROBERT AND VERNA CHRISTENSEN
AND BRIGGS ENGINEERING:
Johnson: I'll now open the public hearing, if there is someone
representing the applicant or the applicant would like to come forward
at this time please do so. Okay, I need to have you be seated or leave
the rom please. Go ahead.
Van Els, 2408 Squire Drive, Boise, was sworn by the Attorney.
Van Els: I'm here to represent Bob Christensen on behalf of Briggs
Engineering and presenting to you Scottsdale Estates Subdivision.
I might indicate several points on this subdivision, I don't know if
you can see that any better. This proposed subdivision will comply
with all the requirements for public street construction and
curb/gutter/sidewalk. The proposed use complies with the Meridian
Comprehensive Plan for the(end of tape) sections of the Comprehensive
Plan have been discussed in the rezone application. The subdivision
will be served by Central Water and Sewer facilities. This rezone
request is for an R-4 to an R-15 zoning, while that sounds a little
severe, let me explain what the applicants intent is here. R-15 zoning
allows for 15 dwelling units per acre, the intent is to provide a
facility or individual lots, single family dwellings, zero lot line
type development again where retired or elderly individuals or those
interested in smaller lots can purchase lots that are easy to maintain.
The lots are considerably smaller, however the density of this project
is only 4.6 dwelling units per acre. There will 27 lots, let me point
out
Meridian Planning & Zoning
December 14, 1993
Page 29
to help you understand how the zero lot line development will, how
we anticipate it might occur. With the zero lot line we intend on
placing a down home type of patio homes I guess is actually the technical
term for it, on lots in neighborhood here perhaps here or here. There
will be some individual lots that will have to be maintained and only
serve as single family dwelling lots, they will have to meet all the
required set back requirements. The same situation will occur down
this area here, there may be a shared common line amongst the dwellings.
One of the reasons for the R-15 zone change request is that the R-15
zone allows for 2400 square foot lots and the majority of these lots
are in the neighborhood of 5000 square feet which I believe is
considerably larger than the minimum requirement of the zone. In the
R-4 zone the minimum lot size requirement is 8000 and in the R-8 zone
its 6500 square feet for single lot dwellings. So as you can see the
applicants request for 4500 if you could place a building on those
you could see they would be very small lots but with not a significant
amount of landscaped area that has to be maintained by those who would
be interested in these lots. Also, I will point out that the secondary
access will be provided from 7th street there will be a connection
along to 7th Street along the southern boundary. Seventh Avenue.
This is the Franklin Square apartments here and that connection will
be made to SW 7th for secondary access. With respect to irrigation
there will be no interruption or disruption of the irrigation systems
in the area and those items will be addressed by Briggs Engineers.
Are there any questions?
Shearer: What is the intention with the large lot on Franklin Road,
block 2 lot 1, it is 3500+ square feet, it has an existing dwelling
on it?
Van Els: At this point the owner is maintaining that as a rental lot
I believe. It is his anticipation to maintain that, I realize that
the Highway District indicated that it was their feeling it might
develop as a commercial site eventually but again that would have to
be brought before this body. This is a, at this point it will remain
as a single family dwelling lot. I'm not aware of any intentions to
do otherwise with it.
Hepper: Will these patio homes have a 2 car garage?
Van Els: Yes they will. We do have a variance application, here again
we get into the same situation as we did on the King Street Station
where we are going to be required to obtain a variance since they are
single family dwellings that will be sold we will have to obtain that
variance to get ultimate approval of this or eventual approval of
this application.
Meridian Planning & Zoning
December 14, 1993
Page 30
Hepper: Will the person that goes in there to buy one lot be required
to buy 2 lots so that you can develop the zero lot line buildings,
you know where they are contiguous to each other so that they will
be compatible? What keeps them from building one type of house that
is up to the lot line and some other guy comes in totally different
that doesn't even begin to conform to the one that is there?
Van Els: I don't know the particulars about that, how that will occur,
that is the intent. I suppose there will a considerable amount of
coordination that will have to occur there. I don't know the applicants
intent, perhaps they will be building spec homes there.
Shearer: The intent though is one dwelling unit per one lot?
Van Els: That is correct. Again the overall density of this
development will be 4.6 dwelling units per acre.
Rountree: Are these going to be site built?
Van Els: Yes, to the best of my knowledge they will be. The owner's
son is in the audience also, he indicated they will be site built.
Johnson: Anyone else have any questions? Okay, thank you we may call
you back.
Shearer: Could I ask Wayne a question, Forrey? What is the zoning
on Franklin Square Subdivision?
Forrey: Mr. Chairman, Mr. Shearer Franklin Square is to the east its
a four plex project, its R-8.
Shearer: R-8 in the town Square?
Forrey: And the four plex was approved by the city and developed
there those four plex lots.
Alidjani: Is it true that as they go further down they get mixed they
have duplexes and single family dwellings?
Forrey: That is on the west side of this project and is it Crestwood
Estates, predominantly single family and some duplex. So this project
is right in the middle of four plex and single family.
Johnson: Thanks Wayne, anyone else that would like to address the
Commission at this time? I will close the public hearing at this
Meridian Planning & Zoning
December 14, 1993
Page 31
time.
Alidjani: Mr. Chairman for the record I have closer than 200 feet
to this property I have to abstain my motion.
Johnson: Now you tell us. We won't ask you for a vote.
Rountree: Mr. Chairman I make a motion we have Findings of Fact and
Conclusions prepared on this application for a rezone.
Shearer: I'll second
Johnson: Never cease to amaze me, we have a motion and a second to
have the City Attorney prepare Findings of Fact and Conclusions of
Law, all in favor? Opposed?
MOTION CARRIED: ALL YEA
Johnson: For the record Mr. Alidjani abstains from voting. We are
going to break for 4 minutes.
Johnson; Lets reconvene.
ITEM #7: PUBLIC HEARING: CONDITIONAL USE PERMIT FOR A DAY CARE BY
LESLIE PALMER:
Johnson: I'll now open the public hearing. If there is someone
representing the applicant that would like to address the Commission
please do so at this time, you need to be sworn.
Leslie Palmer, 1524 Meridian Road, was sworn by the Attorney.
Palmer: Have you got proposals, does everyone have one?
Johnson: We have some material, we don't have a lot of detailed
information.
Palmer: Okay, what I have is an existing home that we live in now
and we have an office attached to our home and we bought a lot in Sportsman
pointe we are going to build in Meridian, but what we would like to
do is to turn our home into a Day Care Center. They recommended down
at Health and Welfare for licensing for my full amount according to
my square footage which would be 40 but 30 is what I would like to
have as capacity. And just upper quality pre-school age is what I'm
shooting for, I don't want infants I want 21/2 to kindergarten age.
And we are close enough to the elementary schools we can pick up and
take to kindergarten.
Meridian Planning & Zoning
December 14, 1993
Page 32
Johnson: Okay, any questions of Ms. Palmer?
Alidjani: Ms. Palmer are you still going to live there?
Palmer: No, it will be just be a day care center.
Alidjani: The hours of the work?
Palmer: Probably, I haven't totally decided but probably 6 in the
morning to 6 in the evening.
Shearer: This is in a commercial zone?
Palmer: Yes it is zoned CC, there is businesses everywhere. It is
getting pretty buisnessy on that end. That is why I don't live there.
Rountree: You indicated you would be seeking a permit or what not
form Health and Welfare.
Palmer: Definitely I will be licensed through the State.
Crookston: Do you have your license now?
Palmer: No, they recommended going through Planning and Zoning and
go the full round before I'm licensed because they will come in and
inspect and if there is not a place to inspect then, that is part of
you licensing.
Johnson: This new garage is under construction is it not?
Palmer: It is completed, it is just a shop, we have our backyard
completely fenced off, where you can't even see the shop.
Alidjani: How tall is the fence?
Palmer: 6 foot cedar.
Johnson: Have you talked with any of the property owners that you
notified in your letters?
Palmer: I've talked to several of my neighbors, and a couple have
called me. No one seems too concerned about it. In fact some were
excited. I had a few curious, just wanting to know what I was doing
but nobody seemed to care.
Hepper: Is there a business going to be run out of the home other
than the day care?
Meridian Planning & Zoning
December 14, 1993
Page 33
Palmer: Well, there is an office attached to the day care but it will
be separate. And really it is just an office, I do book work, I have
an occasional builder drop plans off but that is it. We have a built
in intercom business and it is pretty much we meet people on the site
and I do telephone sales with it. But I have talked to Larry and we
have, he has approved it and we talked about what to do as far as parking
requirements. We will work with him on whatever he thinks we need
to do. We've got 103 feet of frontage, so we have quite a bit of space
to work with, and we have a lot of parking in back for staff.
Johnson: You talked to Larry, which Larry did you talk to?
Palmer: Mr. Sale
Johnson: From ACHD?
Palmer: Yes
Shearer: This will solve some of the problems of putting it in the
residential area that we have been having.
Johnson: That is for sure, that is why there aren't very many people
here tonight. Any other questions of the applicant?
Rountree: How many staff individuals would you expect to have?
Palmer: Well, whatever the requirements are, I think they changed
it 1 to 8 for my age group that I will have.
Hepper: How many kids did you say you can have?
Palmer: I am going to license for 40 that is what the State recommends,
but 30 is all I want, so I will probably have 4 people, no more than
4 would be working at a time any way, that would be the max.
Hepper: How many off street parking spaces would you have?
Palmer: Well, we are going to have 4, we are going to put in a circular
drive and then 4 parking spaces at the end that are completely off
the street. So they won't have to back out into the street. And we
will still have landscaping our house will still look like a house
and it fits real well into the street.
Crookston: Will you have kids in the front yard, what is the front
yard now?
Meridian Planning & Zoning
December 14, 1993
Page 34
Palmer: No, all they will do is go from the car to the front of the
house and inside. In the backyard is the only place they will be
outside. Unless they are with their parent going to the car
Hepper: Will you need fencing to separate the play area from the front?
Palmer: No, there is a back door and it is completely fenced in in
the back. So it is already secure. I have 4 children 5 and under
so it is secure, they can't get out no one can.
Hepper: Is it locked in some fashion?
Palmer: Yes, they have the gate, cedar gate. You have to be tall
to unlock it.
Johnson: Any other questions? Thank you Leslie. Mr. Forrey did you
have a question or did you want to make a comment? Would you like
to wait? Is there anyone else from the public that would like to come
forward at this time? Now you may come forward Mr. Forrey, I thought
maybe somebody else might have a question.
Forrey: Thank you Mr. Chairman, this afternoon when I was going through
some preparation for tonight meeting, I noticed there were no comments
on this Conditional use application form the Highway District. I was
thinking in my mind where are my comments, Gary Smith's etc. and I
asked one of the secretary's here that processes this particular
application and just through an accident neglected to send out a
transmittal to the Highway District or myself and Gary Smith.
Johnson: All the agencies.
Forrey: All the agencies, so there are no comments form any agency
or any of the people, we have 30 on the list none of them were contacted.
She feels bad about it.
Alidjani: So that means no news is good news?
Forrey: Not in this case. So she will be taking action in the morning.
I just wanted you to be aware of that.
Johnson: It certainly is a vital part of our process to have those
agency comments. Unfortunately the oversight that we did not get
anything on this application
Crookston: Excuse me, I just have one question to clarify. The
Meridian Planning & Zoning
December 14, 1993
Page 35
property owners were notified though is that correct?
Forrey: That is correct and the Valley News, but she was unaware the
agencies needed to be notified in a Day Care of this type and she is
now aware of it and would never make that mistake.
Johnson: That is why we decided it was best to go through with the
public hearing because the public had been notified.
Crookston: I just wanted to make it clear for the record.
Shearer: Meeting all the City Ordinances and the Requirements for
this kind of activity should take care of any comments city staff would
have.
Johnson: Because of the size of the operation they are going to have
to meet all of the requirements.
Palmer: I have a question, is this a big set back or not?
Johnson: No, don't doom and boom yet, we haven't acted on anything
yet, we are still gathering information here. But you will be the
first to know. Okay, I did close the public hearing, did I not?
Crookston: No
Johnson: Okay, anyone else from the public on this issue, then I will
close the public hearing.
Shearer: Can we go ahead with Findings of Fact once the approved going
to Findings of Facts and then in doing them after he gets these comments?
Johnson: I don't think there is anything prohibiting us from doing
that in the Ordinance or Law, it is just that you may want to condition
your motion if you have with respect to those comments that are
forthcoming. I think we still should solicit the comments.
Alidjani: Wayne, how many days you can guess that it is going to take
for transmittal and to send out all these 27, 30 copies and get them
back?
Forrey: Our standing policy is minimum 2 weeks, but we give Larry
and others the Highway District that pinches them because they have
commission and staff meeting and things but most of the agencies don't
have a problem with 2 weeks minimum.
Meridian Planning & Zoning
December 14, 1993
Page 36
Alidjani: So in essence if you asked at this moment asked for findings
of fact and conclusions of law with some conditions that its going
to come back within 2 or 3 weeks by the 2nd Tuesday of January when
we have our regular meeting we might have something in front of it.
Forrey: Yes
Alidjani: Counselor, do you have any problem with that?
Crookston: I agree with Jim, I think you need to.
Shearer: I'll move we have the Attorney prepare Findings of Fact and
Conclusions of Law provided he receives these items in time to do that
for the next meeting, if he doesn't receive them in time for the next
meeting then we will have to postpone.
Johnson: By January 11th, I think that is our only approach.
Rountree: I'll second that
Palmer: Will I be first on the Agenda?
Johnson: No, we draw straws for that. This is a short evening, you
should be here when we have long evenings. We have a motion.
Rountree: I seconded
Johnson: And a second, all in favor of Mr. Shearer's motion? Opposed?
MOTION CARRIED: All yea
Johnson: At this point no set back. We have one other item on the
agenda. Which I'm going to defer at this point.
Hepper: If you defer you can't get Sale to testify.
Johnson: He is not leaving, we are going to jump back to item #1,
and I guess what we need is an explanation, a presentation by someone
representing the applicant or City engineer or Wayne Forrey. Well,
I think the commission needs to know why we are bringing it back up
is what I think. And you know why I agree to do that.
Smith: Mr. Chairman, commission members, the preliminary plat of
Valeri Heights came before you at your last commission meeting and
Meridian Planning & Zoning
December 14, 1993
Page 37
after that meeting the applicant, Vicki Welker came and talked to Wayne
Forrey and myself concerning primarily my requirement or my
recommendation to have a access a street access from her east boundary
across the Eight Mile Lateral. And it was her concern that because
of the size of her parcel and her desire to create a somewhat private
atmosphere for larger higher priced homes, larger lots higher priced
homes. That putting the access through her east boundary would
eliminate that concept and my main concern with the access was to provide
sanitary sewer service to Dr. Coe-Parker's or maybe I've got that
backwards Parker-Coe's I don't remember, that was my main concern.
Vicki indicated to me and to Wayne at that meeting that was held
informally here in our small conference room one afternoon that she
would provide a 20 foot wide common lot so that we could extend sewer
from her development to Dr. Parker's property. Unbeknownced to me
was the condition that you had placed on at your commission meeting
that the plat be resubmitted to you. So I related to Vicki at that
time that we could probably take care of this adjustment in the final
plat process. And so I guess it was with that understanding that she
felt she had an answer from the city after talking to Wayne and I that
her plat was not revised and was not resubmitted.
Johnson: Oh, she talked to the wrong people. Do you have anything
to add to that Mr. Forrey? Would you like to verify what he said Mr.
Forrey?
Forrey: Mr. Chairman, members of the commission, when you made the
motion and were discussing the 1st item I was behind the screen here
and I couldn't catch your eye but that whole meeting flashed in my
mind for about a half a second and I thought uh-oh I think we told
Mrs. Welker or did we and I kept mulling that over and Gary just reminded
me that is exactly what happened. I think she left the meeting that
Gary and I had with here thinking that she didn't have to bring
something formally back to the commission that it would come back to
staff and there would be an internal review. And I guess I dropped
the ball, because I was at your last commission meeting and Gary wasn't
it and I should have remembered.
Johnson: Let's stand with the part where you dropped the ball.
Shearer: Correction, I think you were both at that meeting.
Forrey: Were we?
Shearer: Because Gary gave us the advice on the sewer for that location.
Rountree: If I understand the rules of (inaudible) that you are just
talking about a 20 foot public access for sewer which really
Meridian Planning & Zoning
December 14, 1993
Page 38
doesn't require the re-platting and re-drawing of lots and its
preliminary plat that we had, actually its been 2 meetings ago if I
recall, and our concern last meeting was there was enough changes
recommended in the findings of Fact that we wanted to see those changes
reflected on a revised plat, and if in fact that is admitted with the
sewer easement maybe that addresses our concerns. Is the change for
all of those lots sufficient though that were resented originally?
Smith: Mr. Chairman, I don't think it changes them materially
commissioner, I think it moves them, it will move the lot lines slightly
to the south and it will carry the lot line adjustment will carry around
the culdesac and finish up on probably the first lot west of the
culdesac.
Rountree: So just to fix those parcels along that culdesac was
originally plated.
Smith: It appears that the common area for sewer extension will be
towards her northeast corner of the subdivision and so form that area
to the north of the culdesac and then south around the culdesac to
the west those lot lines would change, would move 20 feet approximately.
And in one case I think it will help a lot that was on that culdesac
just on the northerly edge of that culdesac it will help that because
it had a very narrow portion that abutted the culdesac that was really
a very unusable portion of the lot. So that lot line can move then
to where it intersects the bow of the culdesac rather than just missing
the bow of the culdesac and intersecting the street.
Forrey: It results in a better layout around the culdesac.
Shearer: I was under the impression from our last meeting that not
only we had a sewer problem but a kind of an access problem due to
the size and shape of that property, is that right?
Smith: Dr. Parker's property?
Shearer: Or is it
Smith: There is a stub street being provided from Haven Cove
Subdivision into his property.
Shearer: Oh, that is from the south or north.
Smith: Correct
Shearer: Okay, I didn't realize it was a stub street going into it.
Meridian Planning & Zoning
December 14, 1993
Page 39
Smith: Yes, correct
Shearer: Then he probably will end up with an access either the south
or east and the north.
Smith: Right, and I think the property to the east of him is being
discussed between the property owner and a prospective developer to
purchase and develop.
Hepper: Gary, is that a separate lot or is that an easement to the
sewer?
Smith: It would be a separate lot, it would be a common area lot that
the subdivision would maintain. They would maintain it just like that
little park area in the middle of the big turn. It would be part of
their common area they would have that, the 2 landscape lots out front
on Ten Mile road, the small park area and I think there was a little
island in the culdesac that was a landscape area too. And I apologize,
I really dropped the ball on researching anything about, which won't
happen again.
Johnson: Thank you for the explanation, I appreciate that. Is there
anything you want to add to that or does that pretty well handle it?
Welker: No, do I need to sworn in?
Crookston: You don't have to be sworn.
Welker: I just want to clarify there were 4 issues so that you
understand all of them. Number 1 was the sewer issue, and we have
agreed to make the 20 foot re-improve it add a 12 foot width with gravel
or whatever requirements Gary wants to put on it we agreed to put a
manhole by the canal so when they have to bring sewer across the canal
the manhole is already there and ready to hook up. We will fence across
the canal if we get the variance for that like the Parkside Creek people
did, and in so doing if the City of Meridian wants a common area back
there like the greenbelt we will provide a gate into the greenbelt
improvements, depending on what we end up with. The second issue is
the configuration of the culdesac itself, apparently the Fire
Department has some problems with the size of the culdesac island that
we have created whether or not the truck can get around there, so I
agreed with Gary that we will work with him to either reduce the size
of it or do it in a different configuration so the Fire Department
doesn't have a problem with that. The third issue is the sidewalk
around the park, there being none and we've agreed to bring in a
landscape
Meridian Planning & Zoning
December 14, 1993
Page 40
drawing to the City Council so that they can see there is no need for
a sidewalk and the Highway District also so there is no need for the
sidewalk on the park area or we will provide the sidewalk if they feel
its needed after we bring the drawing in. The fourth issue was the
requirement to take the stub street to the south to the Fuller's property
and we've agreed with Gary and Wayne that we will go back to the Highway
District and work that out with them independently to either do that
or eliminate that through the negotiations with the Highway District.
And I believe its lot 7 and 8 that were going to run the manhole down
between and then we go up to about lot 11 where the lots lines will
get reconfigured and we have 2 really large lots on that end which
is the south end of the property and the ground will end up being taken
out of those so the rest of the lots remain the same size.
Johnson: Okay, Vicki thank you. Does anyone have any questions?
Rountree: Well, with these changes do we have to go back and look
at the conditions in the Findings of Facts or will the City, will they
look at those and revise them accordingly, where are we with that?
Johnson: Mr. Crookston, where are we with that?
Crookston: Well, I'm not sure that the City Council looks at those
but quite frankly they also go quite heavily on what you recommend.
Johnson: Where are we legally, do we have a problem?
Crookston: No, you can proceed.
Shearer: Did we approve Findings of Facts last time, I think we did
didn't we?
Johnson: Yes we did. We had quite a bit of discussion on that.
Rountree: That was on the rezone, annexation but we made not
recommendation on the preliminary plat.
Shearer: Yes, we tabled the plat.
Rountree: Given the resolve of the issues to end up with the plat
that was very close to what was presented I'd make a motion that we
recommend to the City Council that they approve the Preliminary Plat
with the changes that have been discussed and agreed to by the City
Engineer and City Planner.
Meridian Planning & Zoning
December 14, 1993
Page 41
Hepper: I'll second
Johnson: We have a motion and a second to remove Gary Smith and Wayne
Forrey off the hook and approve the Preliminary Plat, all in favor?
Opposed?
MOTION CARRIED: All Yea
Sale: Mr. Chairman, can I ask a favor of the City?
Crookston: You don't need to be sworn.
Sale: Good, this is favor #1, I realize this is a little extra step
but it would help me and I think the applicant immensely if we'd have
a letter from the City expressing your approval of the preliminary
plat without street connections to adjoining property and expressing
your approval of that. Because we frankly had a little heartburn when
we reviewed the preliminary plat the first time we were kind of steadfast
in asking for a stub street out and I'd like to have your expression
of approval without the connection in our file so that it will make
it easier for us to approve it the same way you have.
Johnson: Tell me how that makes it easier for you.
Shearer: You know, I'm back where I was a year ago, I don't know what
we are approving again. I mean now didn't we just say a minute ago
there is a stub street out of that to the south?
Johnson: No
Shearer: That is why I wanted a plat that will see what we are looking
at, I thought somebody said here just a minute ago that there was going
to be a stub street to the south not Parker's we are not going to do
that now but we, I was under the impression that we were having one
to the south.
Johnson: We've had our motion and our approval, go ahead.
Welker: I believe when it came up, when the plat came up the first
time that the Highway District requested the stub street to the south,
Mr. Fuller does not want one because when he develops his property
he has access from Pine and Linder and because of the marketing that
I was trying to do I do not want a stub street out of the subdivision
because I'm planning an upper level housing development of only 16
homes and a private park for those 16 residents and if the stub street
goes through that eliminates that marketing concept. Now, then when
the plat came before you, the
Meridian Planning & Zoning
December 14, 1993
Page 42
Highway District had that requirement, and then Gary decided well
instead, I believe this was his thinking,that instead of doing that
he would require one going to the east instead because he wanted to
cover the sewer easement, but Mr. Parker had only requested a sewer
easement not a road. So I came back and said okay Gary I can provide
you an easement without a road and then I want to work to eliminate
the one to the south because Mr. Fuller and I neither one of us want
that one for all those reasons.
Shearer: Well, I can't say I'm happy about it, its not your fault
necessarily, but we ought to have a plat of what we are approving.
And obviously the way this has been bounced around I don't know what
we are approving. And I'm a little bit unhappy about it.
Welker: What I could suggest is that you approve the Preliminary Plat
as presented subject to the 3 requirements that Gary has asked for
and subject to my negotiations with the Highway District and if I can't
work that out with the Highway District with your approval not to have
one then I have to put the stub street to the south.
Johnson: Well, that is basically what we have done.
Rountree: I think that is what I said.
Johnson: Is that the way you recall the motion?
Rountree: Yes
Johnson: Well, back to Mr. Sale. I don't want to try and read between
the lines but are you saying, let me just ask you point blank, are
you saying you don't like what we did here and therefore you want a
letter?
Sale: No, I'm not saying I don't like what you did, I'm saying that
I've got being a good bureaucrat I've got all kinds of paper in the
file that made certain requirements and I'd like to have another piece
of paper from the City saying the project is fine as submitted without
stub streets and that gives some additional reason to agree with that
other than listening to the applicant state that this is the only project
of this kind in the world and they don't want any connection with other
projects.
Johnson: You want the wishes of the city stated in writing?
Rountree: Would that not come with the city's approval of the final
plat?
Johnson: That was my next question, can we do that at the City Council
level Wayne?
Meridian Planning & Zoning
December 14, 1993
Page 43
Crookston: You can make a recommendation to that effect.
Johnson: We already have a motion and we've approved the motion how
would we enter that condition at this point?
Crookston: Make a new motion to add it as a condition.
Johnson: At this point we have done everything but select the person
to make the motion.
Hepper: Well, I have a question why we need a motion, won't the City
approve the plat doesn't that then go to ACHD for your final plat
approval? Who has approval first.
Johnson: But he is not going to get the letter. If we go through
the normal process he won't get his letter. Isn't that right, isn't
that what we are saying? I mean I understand why he wants the letter
now, why ACHD wants the letter.
Alidjani: Why can't they do it next meeting when they approve it,
really.
Sale: Maybe Mr. Forrey or Mr. Smith can write me a nice letter on
letterhead to say what you did tonight.
Rountree: That is not really approval its a recommendation. All we
did is make a recommendation for approval, so they can come back and
say no. So a letter at this point in time is of no value.
Johnson: Well, it could be a letter of intention.
Alidjani: Can't he request at the Council level what Mr. Sale wants?
Shearer: How many acres is that property to the south?
Welker: I think its about 14 acres
Shearer: 14 or 15, is that going to end up with streets that are too
close together down through there coming out of one subdivision.
Sale: Probably not, I think there is sufficient frontage.
Johnson: Well, I don't mean to be short here but what we need to do
now is move on and I think Mr. Sweet has been very patient and we need
to go to the next item.
ITEM #8: PRESENTATION: STEVE SWEET OF W & H PACIFIC, SHORT Meridian
Planning & Zoning
December 14, 1993
Page 44
PRESENTATION OF IMPACT FOR PINE AND EXECUTIVE CONNECTION:
Johnson: We all have received some comments from Mr. Sweet that I
think we very well done and answered a lot of the questions preliminarily
here. Does everybody have the Pine and Executive corridor connection
presentation and then we will turn the meeting over to Mr. Sweet, who
does not need to be sworn.
Crookston: Ah, let's swear him anyway.
Sweet: Steve Sweet with W & H Pacific we've been working with the
Ada County highway District on a corridor study and identifying a parcel
of ground to connect Pine Avenue with Executive Drive. Terry Little,
the Traffic Services Manager for the Highway District is here Mr.
Johnson behind this machine, Larry Sale is here the Development Services
Manager for the Highway District. I'd like to step through the typical
project questions. I'd like to do a David Letterman top 10 but I will
stick to the script here. The project has been identified in the 2000
urban classification for the area and you can see on the drawing we
have a blue arrow pointing to the Pine Executive connection its been
identified agreed to previously that somewhere in the area we ought
to be tying the 2 roads together with a collector status street. For
the record I've taken the 2010 plan down and we are now looking at
an aerial photo taken in May of this year showing the area in question.
Yes Mr. Berg. (End of Tape) The Pine Executive corridor connection
lies between Fairview to the north and Franklin to the south, 2 arterials
presently in existence. For the record there is a third arterial we
also have in the area, Overland coupled with the Interstate. We have
plenty of traffic flow east and west and we are looking for a connector
to provide access to these 1300 acres roughly these 2 sections by
sective. The plans that have endorsed this concept have been the 200
urban classification system map, the one we just had up, the 2010 needs
a transportation and needs assessment for Ada County and the Ada County
Roads to Rivers plan. The point is that we as a community have been
talking about a connector in this area. We looked at 3 different
alternatives on that map you see on the top a green line, in the middle
there is a line that is red and over the top of it is labeled preferred
alternative, and the third line is a yellow line. The green starts
at Locust Grove follows the existing sewer and fiberoptics line in
the water there part way into this area across the Treasure Valley
business Center and goes right along the mid section line once we get
east of Eagle Road. The red alternative would be the one that came
out to be the preferred alternative and I'll get to how we got to that
decision. The preferred alternative came straight across the mid
section line and came back on top of the green line. The yellow was,
let's frame this as far as it will go
Meridian Planning & Zoning
December 14, 1993
Page 45
and as far south as we can keep in mind we have the railroad track,
just to let you know we've gone through 8 official hearings or
discussions with folks, we've had an informal with Meridian kiwansis
where we talked about the project. The yellow line took a lot of heat,
nobody liked that. That framed the picture very well. We have, I
have a list of meetings I'd like to present to you folks so you have
something for the record summarizing the 8 meetings and the attendees.
I also have a copy of the study and the sign in list the mailing list
that we dealt with in the project. There are comments, so I'd like
to leave those with the City Engineer, so you'd have something for
the record for Council to review and any public that wants to come
in and look you have a copy of comments to date. And for the record
I passed out to the City and the study the appendix to the City Engineer.
The greatest support by far came from the landowners, that would be
directly impacted by the project the public that submitted testimony
favoring the project we uniformly in favor of the red route. There
was one petition signed by 24 homeowners requesting no activity at
all in a connection out there. I'd love to say that they were not
living on the Pine Executive corridor, they were off that site. The
red route received support from the homeowners, it provides the best
spacing for intersections between Fairview and Franklin it provides
good safety features when dealing with the railroad tracks out there.
The safety features in this project in addition to a corridor and
I'm going to show you a section here in a minute, in addition to a
corridor we contemplated to attach sidewalks away from curb, striped
bike lanes, aligning intersections at arterials to accommodate future
traffic signals and safe crossing, we have recommendations for an
unsignalized accesses for regulations for safe vehicular movements.
I would like to put up a, In your packet there is a typical cross
section and for the audience I will describe it, it is 2 traffic lanes
in either direction, a center left turn lane, 2 striped bike lanes,
a landscape and utility zone outside the curb zone which is also long
range corridor preservation and 2 five foot sidewalks on the outside
of that. I'm describing a 52 foot paved road way, 2 eleven 1/2 foot
landscape utility zone long range corridor preservation zone, 2 five
foot sidewalks, continuing with a 90 foot right of way. The extra
right of way in this area will provide for the landscaping which will
help frame the entry into Meridian. The project was started with the
2000 plan, this study is advancing the project by identifying where
in the future a corridor ought to be built when approvals come in.
The actual construction will take place when land is developed and
the cost will be borne by the developer. In the area of Pine its existing
today, from 1st to 6th there is 80 feet of right of way for 6th out
to South Locust Grove there is 50 feet of right of way. Our
recommendation contemplates meandering the road right of way past
existing home sites not taking rights away off of
Meridian Planning & Zoning
December 14, 1993
Page 46
exiting single family homes as the traffic is not projected to be that
great in the future out there, way out in the future we are looking
at 5,000 20 years down the road. Our recommendation is that right
of way is not taken from single family homes and as the market conditions
bring increasing uses into the vicinity and uses change from single
family to commercial the right of way should be acquired. I believe
you will be seeing a recommendation from the highway District on land
use exchanges out there for an increased right of way. This is Pine
Avenue from 1st out to South Locust Grove.
Johnson: I've got to ask you a question, your preferred route is red
and non-preferred routes is green, how does that happen what kind of
thinking is that.
Sweet: It was never as good as it should have been, I had three colors
available, what is going on in the market place today is you can't
buy this zip tape in but these tree colors.
Johnson: I really didn't expect an answer.
Sweet: And you'll notice the preferred alternative is blue.
Johnson: Are we ready for questions?
Sweet: Yes sir
Johnson: This disadvantage, I'm always interested in the
disadvantages here. I can see a straight shot with the research of
the traffic study, I don't know anything about that just makes sense
it would. Is that the reason with the volume there is no meandering
its more of a straight shot through there, tell me as the transportation
engineer why that is? Is that the reason, because its straight.
Sweet: The idea in dealing with traffic is just like water and with
more resistance its going to squirt out a little more.
Johnson: The second thing, the potential crossing on the Free Trade
Zone a rail spur which is contemplated but is not there now, right?
Sweet: That has been approved the rail spur is not there the property
is held by Treasure Valley Business.
Johnson: I know you have had meetings with those people, is that,
what kind of a problem is that. You say it is a potential disadvantage.
Meridian Planning & Zoning
December 14, 1993
Page 47
Sweet: It is not a big, as we identified that as a concern, and this
was something we put to the folks back in August trying to frame the
issue in our first public meetings. My understanding is if there is
a Free Trade Zone developed there, if this rail spur is developed it
would be of minimal use during high traffic times and to tell you the
truth they don't know what they have out there.
Johnson: I understand, it would be the same problem for any of the
3 routes, whatever is chosen.
Sweet: Yes
Shearer: I think its great after seeing all these subdivisions to
see a road that is actually straight and on the half section line,
that is different.
Johnson: Would you elaborate for me, again being interested in the
negatives, why you had 24 people sign a petition and what their thinking
was, the excuses they gave for not wanting any kind of development.
Sweet: I can't explain why other than my understanding is that there
was one individual who is concerned. I could pull you their petition
and the response from the Highway District.
Johnson: Well, I guess I'm more interested not in the individuals
who they are or any of that, but their thinking, is there anything
specific about this place or is just the fact they don't want any traffic
through there period.
Sweet: The thinking is that Pine/Executive should not be completed.
Johnson: The entire project, it doesn't matter which alternative.
Is there anything you can add to that, were there any other concerns
that you haven't listed here as disadvantages?
Sweet: I think that the meetings that we've had have been very thorough
in bringing these out. I think one thing that is important for you
to understand is that you can't go from a green alignment to a red
alignment or a yellow offset at the arterials at Eagle. Because then
we start having offset intersections the traffic is stopped for one
light backs up into another light or backs up across the railroad tracks.
I think from a safety standpoint the yellow is the least desirable
of all because of the proximity tot he rail crossing.
Meridian Planning & Zoning
December 14, 1993
Page 48
Johnson: Where on this map is the Boise City limit?
Sweet: I believe the Area of Impact for Meridian
Johnson: I know where the Area of Impact is do you know where the
city limit is?
Sweet: No
Johnson: We now where that is because we work with that all the time.
Sweet: I don't know, I'd be happy to put a sketch together for you
and ship that back.
Johnson: No, I just thought maybe you might know. Is the City of
Boise involved, obviously you talked to them because its in there.
And my next question is obvious, what is their response?
Sweet: We have notified Boise City a number of times concerning the
project and we have not received comment form Boise City.
Johnson: You don't have anything, you haven't had a meeting with them
like you are doing with us.
Sweet: And I'd like to get the Highway District a pat on the back,
we were directed to come and get Meridian's input and work closely
with Meridian in this, because this comes to the hear of your community.
They were very sensitive to that, that is why we have scheduled this
meeting you folks and we are scheduling one with the Council before
we go to the Board of Commissioners before the Highway District and
make the final recommendation.
Johnson: It just seems like such a natural, those of us that live
in this area and drive east you know whether you are on Franklin,
Fairview, or Overland it doesn't make much difference, it just depends
on the time of day. It just seems to me like a natural positive step
for this project.
Sweet: If I could, Larry do you have anything you'd like to add?
Sale: I'd like to ask the Chairman if he could write a letter to speak
on Hill road.
Crookston: What type of traffic control do you foresee on this road?
Meridian Planning & Zoning
December 14, 1993
Page 49
Sweet: I think the best traffic control
Crookston: In the terms of lights and stop signs, what kind
thoroughness are we going to have?
Sweet: On the arterials in due time, I'm not even going to answer
that I'm going to let the Highway District answer that because I'd
be talking about their future policy.
Little: We would ultimately anticipate signals at Eagle and at Locust
Grove, probably could handle most things everything in between with
to a left turn lane until we get a pretty good mid section type of
a connection there at, but I really wouldn't anticipate that between
Cloverdale and Eagle given the railroad track and the barrier that
presents. I think it will function very well into the foreseeable
future even beyond the 20 year period with just a signal just at those
locations, we could end up with an interim 4 way stop at Locust Grove
as a result of this. If I talked about traffic calming, I could update
about where the Highway District is on that.
Johnson: We are still trying to figure out the definition of traffic
calming.
Little: What it really means, we just approved a policy at the District,
last week or this week, which deals with collector and local streets
not with arterials. This is a collector by the way, but we certainly
wouldn't envision in this 2 mile section where the new road would be
we'd be talking traffic calming. I could envision a no truck sign
at Locust Grove to keep trucks headed to Eagle Road and the Freeway
that kind of a thing and that relationship. But there is a traffic
calming policy that deals with residential streets, it has some general
categories we have thresholds based on whether its a collector whether
its a local, how wide it is, sidewalks that kind of a thing. We have
thresholds for speed, traffic volume and cut through traffic and if
it meet the cut through traffic threshold then ACHD is willing to
consider full funding and the whole thing, if it doesn't have some
cut through traffic but doesn't have a, doesn't make the threshold
it needs 25% it is not a big percent, we will provide full support
residents are expected to pay the cost of the measures themselves.
This is done out in West Bamere if you are familiar with the foothills,
Bogus Basin, we did 5 road humps, big long speed bumps and
Rountree: Jim we can finally see one, we've talked about them for years.
Meridian Planning & Zoning
December 14, 1993
Page 50
Johnson: Well, I (inaudible) a hump and a bump.
Little: A bump is about between these 2 plats and a hump is about as
log as your table here, 3 inches and they are fairly comfortable at
15 - 20 miles per hour they shake your teeth at about 30. We do have
some longer ones for collector streets which we are planning to try
which they use in Portland which are 22 feet long. We are going to
use those on Gillis off of Gary Lane, but our third category is where
they pay for the whole thing in an enclosed subdivision and then they
are creating their own problem and they pay for the whole thing. We
are having a major meeting in the Randolph Robertson area, you may
have heard of Borah High School, and they problems we've had for 3
years trying to resolve that. We are having a meeting Thursday on
that with a very Draconian traffic calming plan that Pat Doby has
developed for us to try and resolve the high schools just cut through
that it is like a freeway on ramp. Borah Drive in the morning is busier
than any half of the day ont he Orchard on ramp, I mean it is solid
cars.
Johnson: Well, that is where you are doing some temporary blockading.
Little: Yes, we tried closer last year but it wasn't very popular,
we had a very heated meeting over that a very well attending meting
the biggest one we have ever had until bench valley and the hill road
meeting at least. We are trying something new out there but that is
something, we've talked to the Sandalwood folk on that, they were
interested in taking a collection for that. There is one developer
that owns the subdivision between Linder and Cherry in the northwest
corner that lives on Sandalwood I think he talked to me about paying
for some traffic calming measures. We are looking into that, but we
are involved with the Fire Department, some of these closures can be
really a problem for them. We got a letter back this week, in one
case they said we can't live with it, in another they said we can live
with the closure, you put right mid house block, you have a 2 house
block, this is hear HP and Five Mile Road, but that is where that stands.
Part of that policy involves developer funded traffic calming measures
and its where we're directly impacting a development, you know they
are dumping right into a street and we envisioned it as a problem and
about the 3 or 4 cases we've had thus far we've kind of negotiated
and they have been very willing to do it its very popular with the
neighborhood to existing neighborhoods very inexpensive relative to
development and maybe sometimes gives a few more lots. I could envision
this on a pintail type of situation or something like that where there
is a tough spot to get more collector access, an interim measure a
few more houses they do get bumps they stay in forever and we eventually
get the collector access, that kind of thing could really
Meridian Planning & Zoning
December 14, 1993
Page 51
help us. We've had them approved for the Gilis extension down off
Gary Lane, Old town, Ustick, Wildwood, there is one off Five Mile and
Overland that have been approved I don't know that any of them have
gone in yet sometimes it takes awhile. We will get out a laymans version
of this thing and ship it out here to you to make it understandable
its pretty complicated in the way its written up right now.
Johnson: What about your time table?
Little: For traffic calming?
Johnson: No, how far along are you on this?
Little: We are ready to have it approved by our commission and begin
implementation which is just corner preservation right now it is just
dealing with existing subdivisions and how they would connect into
it and we have the one on the corner of Eagle and Fairview the southeast
corner.
Johnson: You've had several meetings with Tom Wright?
Little: Yes, we are scheduled before City Council next week and then
the next thing, I think the next milestone is ACHD Commission, we feel
like we've got the homework done and its ready to implement.
Rountree: Terry if I understood Steve correctly this would be financed
and potentially corridor preserved through the State Land Use Planning
Act by identifying it on the preservation within the City of Meridian,
but it will be developer paid for.
Little: Well we are really qualified, pretty much impact fee, Larry
could address that.
Rountree: Will that need to be developed with impact fees or a
combination?
Sale: It will be, the first step will be to acquire the right of way
as development occurs along it and we will pay for that right of way
using impact fee revenue collected in that zone. If we deem at that
time that the streets should be constructed we will pay for any
construction over and above what the developer might require to serve
its basic needs, we would make that payment again with impact fee
revenue.
Meridian Planning & Zoning
December 14, 1993
Page 52
Rountree: What are we looking at cost wise in implementation based
on development or are do you have some kind of a time line you'd like
to see this implemented.
Sweet: The fundamental assumption is it would be based upon
development. And we are looking somewhere around the order of a million
to million and a half bucks.
Rountree: Construction
Sweet: Yes
Johnson: Mr. Forrey
Forrey: (Inaudible)
Sweet: Yes sir
Rountree: Any controlled access?
Sweet: We have recommendations for limiting the commercial access
we also as a subdivision abuts the corridor there will be designated
access points there will not be direct lot access. Gentleman, thank
you for your time i appreciate it.
Johnson: Thank you, do you have any questions? If not then I'll
entertain a motion.
Rountree: I have one question, I'm seeking an answer from you, you
gave us this package of information on landscape ordinances, do you
have in mind when we are going to get together and talk about that.
Johnson: One thing we are not going to do is plan a meeting after
our regular meeting. No, I, because of my own selfishness I would
like to wait until after the first of the year. I have a very tight
agenda and to do justice I would like to have a workshop or a meeting
after the first of the year, but I haven't forgot about it if that
was your question.
Shearer: Sometime after the first meeting.
Johnson: We need a motion
Rountree: I'll move we adjourn
Hepper: I'll second
Johnson: Moved and seconded to adjourn, all in favor? Opposed?
Meridian Planning & Zoning
December 14, 1993
Page 53
MOTION CARRIED: All yea
MEETING ADJOURNED AT 10:25 P.M.
(TAPE ON FILE OF THESE PROCEEDINGS)
JIM JOHNSON, CHAIRMAN
ATTEST:
WILLIAM G. BERG, JR., CITY CLERK