Loading...
HomeMy WebLinkAboutACHD Comments ~ ,,~,~\) --.\~,.' ~~p ,,'L1l1l1> ;i~il' \'It \ ~_~'~;.~G~ ~CHD ~ "<f,( ::~j,-..... (j:O:.. ~-"I<-rt;::-V ~ r \' ~ ',~':_>",~...:> '-I . "1",' ,')....,1.- ',,-"" y\.; . \~l' (h,~ut1';, ~ John S. Franden, President carol A. McKee, 1st Vice President Dave Bivens, 2nd Vice President Sherry R. Huber, Commissioner Rebecca W. Arnold, Commissioner September 28, 2006 SUBJECT: Bailey Engineers 1500 E. Iron Eagle Drive Eagle, Idaho 83616 MCPA-06-003 Between Meridian Road & Eagle Road and Between Columbia Road to % mile north of Amity Road Comprehensive Plan Amendment to modify Future Land Use Map 'n--',' -~.: }l '. , ..... ~.,.' ..". TO: .~'\" OCT 0 5 2006 '~~it~;f- C>[ IvI01'1.c5L:~ ;::i\:~\?' C::;l~:~t:'l;- ~Jf5.c.c; The Ada County Highway District has reviewed your application for the above referenced development and determined the following FINDINGS OF FACT: Application Information: . The project area includes approximately 1,200-acres. The District reviewed a conceptual plan provided by the applicant that supports the current proposal being made to the City of Meridian. . The project has frontage on the following roadways: o Amity Road: a minor arterial o Lake Hazel Road: a principal arterial o Columbia Road: a minor arterial o Meridian Road (SH 69): a principal arterial o Locust Grove Road: a minor arterial o Eagle Road: a principal arterial . Access is proposed to all of the major roadways abutting the site. . The project is proposed to have residential and commercial components. . Roundabouts are proposed internally throughout the development. . A roundabout was contemplated at the Lake Hazel/Locust Grove intersection. . Alleys are proposed throughout the project site. . The project proposes interconnectivity with adjacent, undeveloped property. o There are some topographical constraints that may prevent the physical construction of connecting roadways or stub streets. . The plan proposes to utilize the gas pipeline corridor for a regional pathway, Initial ACHD Comments: . Because Lake Hazel is anticipated to be a major east-west corridor and the volumes on Locust Grove are anticipated to be significantly less, the applicant should consider not constructing the roundabout at the intersection of Lake Hazel/Locust Grove. . The applicant could consider roundabouts at the major site entrance intersections with Locust Grove. . Due to the size of the properties fronting on Amity Road, a continuous residential collector may not be feasible and/or desirable. . The applicant may want to consider continuous residential collector/collector from SH 69 (at the half mile) to Locust Grove through the site. Ada County Highway District. 3775 Adams Street. Garden City, 10.83714. PH 208 387 6100. FX 345-7650 · www.achd.ada.id.us I .' .' ( ( [ Development Process Checklist : II l8JSubmit a development application to a City or to the County l8JThe City or the County will transmit the development application to ACHD l8JThe ACHD Planning Review Division will receive the development application to review I8JThe Planning Review Division will do Q!].g of the following: OSend a "No RevIew" letter to the applicant stating that there are no site specific requirements at this time. DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part of a previous development application and that the site specific requirements from the previous development also appl: to this development application. I8IWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating thE proposal for its confonnance to District Policy. DWrite a CommissIon Level report analyzing the impacts of the development on the transportation system and evaluating the proposal for its confonnance to District Policy. OThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports. OFor ALL development applications, including those receiving a "No Review" or "Comply With" letter: · The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development RevieVl Division for plan review and assessment of impact fees. (Note: if there are no site improvements required by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.) · The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way, includin{ but not limited to, driveway approaches, street improvements and utility cuts. OPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval. DID YOU REMEMBER: Construction (Zone) o Driveway or Property Approach(s) · Submit a -Driveway Approach Requesr form to Ada County Highway District (ACHD) Construction (for approval by Development Services & Traffic Services). There is a one week turnaround for this approval. o Working In the ACHD Right-of-Way · Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit App/ication~ to ACHD Construction - Permits along with: a) Traffic Control Plan b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are placing >600 sf of concrete or asphalt. Construction (Subdivisions) o Sediment & Erosion Submittal · At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage Division. o Idaho Power Company · Vic Steelman at Idaho Power must have his IPCO approved set of subdivision utility plans prior to Pre-Con being scheduled. o Final Approval from Development Services · ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con. 8