HomeMy WebLinkAboutPZ - Tree Mitigation Narrative STACK ROCK
G R O U P
404 S.8th St.#300A1
Boise ID 83702
(208) 345-0500
June 6th, 2024
Kyle Yorita, Meridian City Arborist <kyorita(@meridiancity.org>
City of Meridian
33 E. Broadway Avenue
Meridian, ID 83642
RE: Pivot Pointe Tree Mitigation Plan
On behalf of KB Home, we are submitting a Tree Mitigation Plan for City review at Pivot Pointe
subdivision located at 4600 W. Quarterhorse Lane, Meridian, ID.
An arborist report was performed on April 3, 2024 and is attached for reference. KB Home
would like to keep a majority of the trees along Pine Ave. as part of the landscape buffer except
where conflicts with streets or the lateral arise. Currently we are calculating 1,243 caliper inches
of trees to mitigate for this site. Due to the large number of caliper inches required for mitigation
we would like to propose the following option:
• Distribute a portion of required inches towards KB Home planned properties throughout
Meridian (Horse Meadows, Alexander's Landing, and Graycliff phases 3-5).
• A minimum total of 631 2" caliper trees (1,262" total caliper inches) is proposed
throughout the Pivot Pointe, Horse Meadows, Alexander's Landing, and Graycliff Phases
3-5 Subdivisions along with the Graycliff City Park.
Please contact me at darian stackrockgroup.com or Sabrina at sdurtschi(a�kbhome.com
should you have any questions.
Sincerely,
Darian Westrick, PLA
Stack Rock Group