Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2024-07-24 ACHD
Alexis Pickering,President Miranda Gold,Vice-President Jim Hansen,Commissioner 10 ACHD Kent Goldthorpe,Commissioner Mr ww�m Dave McKinney,Commissioner Date: J u ly 241", 2024 To: Sabrina Durtschi, KB Home Staff Contact: Matt Pak, Planner Project Description: Pivot Pointe Trip Generation: This development is estimated to generate 387 vehicle trips per day, 39 vehicle trip per hour in the PM peak hour, based on the Institute of Transportation Engineers Trip Generation Manual, llt" edition. Proposed Development Traffic Impact Study Meets All ACHD Policies F Requires Revisions R- • • meet No ACHID Policies • required Area Roadway Level of ACHD Planned Service Improvements D• area roadways - ♦ D's LOS Planning Thresholds? Yes • Livable Street • - Measures Area •.• eet ACHID's LOS Planning Thresholds -•- the future with • -• improvements? Is Transit • - • connecting you to more Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 208387-6100•FX 345-7650•www.achdidaho.org Development Services Department 'ACHD connecting you to more Project/File: Pivot Pointe / MPP24-0011 / H-2024-0029 This is an annexation with rezone from RUT (Rural-Urban Transition) to R-4 (Single- Family Residential) and a preliminary plat application to allow for the development of a 51-lot subdivision consisting of 41 single-family lots and 10 common lots on 7.6 acres. Lead Agency: City of Meridian Site address: 4600 W Quarter Horse Lane Meridian, ID 83642 Staff Approval: July 241", 2024 Applicant: Sabrina Durtschi KB Home 1414 W Bannock St Boise, ID 83702 Owner: Drew Morgan 4600 W Quarter Horse Lane Meridian, ID 83642 Staff Contact: Matt Pak Phone: 208-387-6171 E-mail: mpak achdidaho.org Report Summary: ACHD Planned Improvements............................................2 Level of Service Planning Thresholds.................................2 A. Site Specific Conditions of Approval ............................3 B. Vicinity Map.................................................................5 C. Site Plan ......................................................................6 D. Findings for Consideration...........................................7 E. Policy.........................................................................10 F. Standard Conditions of Approval ...............................16 G. Conclusions of Law....................................................17 Request for Appeal of Staff Decision ................................17 1 Pivot Pointe / MPP24-0011 / H-2024-0029 ACHD Planned Improvements 1. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP): • Franklin Road is scheduled in the IFYWP to be widened to 5-lanes from McDermott Road to Black Cat Road in 2028. • Black Cat is listed in the CIP to be widened to 5-lanes from Franklin Road to Cherry Lane between 2031 and 2035. • The intersection of Cherry Lane and Black Cat Road is listed in the CIP to be re-constructed as a dual-lane roundabout with 4-lanes on the north leg, 4-lanes on the south, 4-lanes east, and 4-lanes on the west leg, and built between 2031 and 2035. • The intersection of Cherry Lane and Ten Mile Road is listed in the CIP to be widened to 7- lanes on the north leg, 7-lanes on the south, 7-lanes on the east, and 7-lanes on the west leg, and signalized between 2026 and 2030. Level of Service Planning Thresholds 1. Condition of Area Roadways Traffic Count is based on Vehicles per hour(VPH) Roadway Frontage Functional PM Peak Hour PM Peak Hour Classification Traffic Count Level of Service Pine Avenue 794-feet Collector 88 Better than "D" * Acceptable level of service for a two-lane collector is "D" (425 VPH). 2. Average Daily Traffic Count (VDT) Average daily traffic counts are based on ACHD's most current traffic counts. • The average daily traffic count for Pine Avenue east of Black Cat Road was 1,420 on January, 251h, 2024. 2 Pivot Pointe / MPP24-0011 / H-2024-0029 A. Site Specific Conditions of Approval 1. Improve Pine Avenue as '/z of a 36-foot wide street section to include pavement widening, vertical curb, gutter, an 8-foot wide drainage swale and 5-foot wide detached concrete sidewalk abutting the site, to tie into the existing improvements east and west of the site. Design and construct the roadside drainage swales with vertical curb meeting the requirements for the swales listed in the BMP. 2. Complete Quarter Horse Drive from the site's west property line 259-feet east into the site with curb, gutter and 5-foot wide attached concrete sidewalk abutting the site. 3. If Alexanders Landing does not move forward, construct Quarter Horse Drive from the site's west property line for a distance of 259-feet east into the site as '/2 of a 33-foot wide street section with curb, gutter and 5-foot wide concrete sidewalk plus an additional 12-feet of pavement widening beyond the centerline of the roadway established for the street, a 3-foot wide gravel shoulder and borrow ditch sized to accommodate the roadway storm runoff. Dedicate right-of-way to extend to 2-feet behind back of sidewalk on the north side and to 2-feet behind back of borrow ditch on the south side. 4. Construct the eastern portion of Quarter Horse Drive as a 33-foot wide street section with curb and gutter on both sides of the roadway and 5-foot wide attached concrete sidewalk on the north side of the roadway, with right-of-way on the south side of the roadway extending 2-feet behind the back of curb and touching the parcel to the south (parcel No. S1210325800). 5. Construct the remaining internal local streets as 33-foot wide street sections with curb, gutter and 5-foot wide concrete sidewalk within 47-feet of right-of-way. 6. Construct the proposed cul-de-sac at the terminus of Pivot Place with a minimum turning radius of 50-feet. 7. Construct Biltmore Avenue to align centerline-to-centerline with Biltmore Avenue located on the north side of Pine Avenue, across from the site. 8. Construct a local stub street, Biltmore Avenue, to the site's south property line located 1,193-feet east of Black Cat Road. Install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 9. If Quarter Horse Drive has not been constructed as a stub street to the site's west property line as part of Horse Meadows Subdivision, install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 10. If Bareback Street has not been constructed as part of Alexanders Landing Subdivision, construct a temporary cul-de-sac turnaround at the terminus of Quarter Horse Drive. Pave the temporary cul- de-sac turnaround with a minimum 50-foot turning radius. If the temporary turnaround extends onto a buildable lot, encumber the entire lot by an easement and identify the lot on the plat as a non- buildable lot until the street is extended. 11. Close the existing driveway on Pine Avenue with vertical curb, gutter, an 8-foot wide drainage swale and 5-foot wide detached concrete sidewalk. 12. Construct a 20-foot wide curb cut type driveway onto the cul-de-sac of Pivot Place, in alignment with Pivot Place. 13. The extension of Quarter Horse Drive into the site will need to be redesigned to reduce the length of the roadways or to include the use of passive design elements. Speed humps/bumps and valley gutters will not be accepted as traffic calming. Submit a revised preliminary plat showing the redesigned roadways for review and approval prior to plan approval and ACHD's signature on the first final plat. 3 Pivot Pointe / MPP24-0011 / H-2024-0029 14. Provide ACHD approved plans for the crossing of the Kennedy Lateral (Biltmore Avenue) prior to the pre-construction meeting and final plat approval. Note: Timing of project plan submittals should take into account review times, lead time for precast members and potential roadway closures. To ensure construction prior to irrigation season, approval of the project plans must be attained by January 15th. The District retains the right to modify road closure approvals on any project based on the needs of the District. Construction of projects approved after January 15th may be postponed until after irrigation season is over in October. It is recommended that bridge submittals be submitted before the end of the current irrigation season to ensure the best time frame for construction is attained. Submittals will need to include the street section extending over the bridge to ensure the requirements of the roadway are met. 15. Other than the access specifically approved with this application, direct lot access is prohibited to Pine Avenue and should be noted on the final plat. 16. Submit civil plans to ACHD Development Services for review and approval. The impact fee assessment will not be released until the civil plans are approved by ACHD. 17. There will be an impact fee that is assessed and due prior to issuance of any building permits. The assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The impact fee assessment will not be released until the civil plans are approved by ACHD. 18. Comply with all Standard Conditions of Approval. 4 Pivot Pointe / MPP24-0011 / H-2024-0029 B. Vicinity Map J � Dover Dr- rt`44� '�• R° .�L - YHearst�S_�- _ 01?.. AN r fir. ��-• ` _�� � - -. -- W Meat nwNifie St - I " PRO. m :...wiQi,arterltiors LLn r '• wl rlain d s V4'Far Dr m a: �.. " - ' - rkr- 41 N Tape ls fG -Nl=' i1 ...�. s..r. •fir; I V a Ht� - �L F' - Santa � LFe p {Il�ll�l�'F p . W IF re:4e kyf�, ---- W ' W. I - - Hill L,i • *'� � - 7, Hill'St ..- _ FrQsl, W Per Yer„ ,;St rr s. LL - W-=CFiair y. W [ l,r,ir L itl I „ � — - - — .1A1:Frankliiti.R .- - - - -... 6� r . + r -W Peak Glbud Dr, •` x'j=:.1rti 5 Pivot Pointe / MPP24-0011 / H-2024-0029 C. Site Plan uEFIOWN,+RE3s4S" ----- 4Lr z MERIDINT,JfY'6362 I� 10'ACHD STORM WATER EASEMENT(IYP.) ___ __ ___ �'pI �__ 2'ACHO SIDEWALK EASEMENT - - _ __- __ _ - __ _ __ 'SBA'24'30'E 0 0o S _ `.: N 2563_ -- 101.13 5.ht��-` lili if:,- 53.53 ,,' - =�_ 4155 AFT. I 108.00 I I II n124.6' \` \8 2J f 1 I1111 j11 15,004 SOFT. \ 9 320 SOFI.1 1 III I7 16 SQFr }dJI Ir 11� $ 121,7' I 13.65 u I�N#Yry�'�'I'1 I 1 42fi]SpFf. 4,102 EY,I$TING NMID ^ III I III d0!�1 420 OFi.B j \l.1' LAIL 45,0�. KENNEDYEASEMENT \ 0 108.00 i i I i 1111 1 E52.3' / /O 4.320 50�F 1 jI1 \\�\�=`C`'� �rJ �'Ijll11 1150 @ 1 41y^P VOrT PL. ,�y ^1144,4 11925a `iy� `"� I 7.35 1D8.00 1111 IIII m 40 00 40.00 40b9^ 40.00 40.00 40�10 15 4,597 SOFT. "� •y':0 1 1 111 I f Y'- j1 91 1I I11 I If I1 y _ - \\ 1FF1��,,`,,,,p. 1! 9i 1,111 11", 4,191 SOFT. 4, SOFT. 4,OB0 SOFT. 4.NO S13FI. r.wQAFT. ]13 Y C27.8' \� �� 1 I 1 I Ilj I 4,]ao sOF'F.i TWO r- 102.13 I yl 6.5 1 `.�g0�246 SOFT. 4.321 SOEf.1._1 r\ 4.315 50Ff.O I�lifIIII 1 I a e.00 . 1r�i 10I I��J11iJ L-J ✓_ n J _ 1 i �4aI 1 4.72014 `q r11 4.720 AFT.'IfTIT' � I n 44. 1 40.00 40',OQ 40 OD 40.00 1 -�9.91f� `40.10 4C.00,`i 42.30 3 6.06 1 1CBA0 Z94 ' O3,�T5 SOFT. r ' 7 r 4t)AO 40A0 r 40.00 40,00 4000 I 1 1 1 I y`d, 1I` 40.71 40.82 m 1 I, �I w _y i11 rY"' i. I� B1.01 108.00 S I i r' r i l o `r'�T r l l l Cn 1 5j` 04,72o lVr.ii lli'Iti � _36 _� ® � ©ten t 10 (g}� O Oj 4,98 FT. 4,37OFT. 4,256 AFT. 1178 SOFT. 4,141 SOFT. L027 SpFT. 4.000 4.W0 SOFT. 4,005 SOAF. ,`�., 4.0050' `4.T�0 SST.` ON SOFT' 4,0M SI 4,052 SOFT. ©41 N SQU a;9�sOFr. •2 --- - 40.1C k /23.211 40.82 40.817 6.99 35.10 `40A i �4900 \"40AD 33.89 ; IIII I, 6.9B 14.24 � III1 I ■ 0.47 w __ Fi-PRO E 1 - --_ y[7,0' [2.0' - - 9 4,344 SgRil i�i q IF 793.91' 6 Pivot Pointe / MPP24-0011 / H-2024-0029 D. Findings for Consideration 1. Pine Avenue a. Existing Conditions: Pine Avenue is improved with 2-travel lanes, no curb, gutter or sidewalk abutting the site. There is 41-feet of right-of-way for Pine Avenue (18-feet from centerline). b. Applicant Proposal: The applicant is proposing to improve Pine Avenue as % of a 36-foot wide street section to include pavement widening, vertical curb, gutter, an 8-foot wide drainage swale and 5-foot wide detached concrete sidewalk abutting the site, to tie into the existing improvements east and west of the site. c. Staff Comments/Recommendations: The applicant's proposal meets District policy and should be approved, as proposed. While roadside drainage swales are not the typical type of drainage facilities used on residential roadways; they are allowed in some applications under certain conditions such as with high groundwater. Swales are an approved BMP (Best Management Practices) and allowed per policy in section 8200 of ACHD's policy manual. The applicant should be required to design and construct the roadside drainage swales with vertical curb meeting the requirements for the swales listed in the BMP. 2. Internal Local Streets a. Existing Conditions: There are no existing local streets within the site. Quarter Horse Drive is proposed to stub to the site's west property line. As part of the approval of Alexanders Landing Subdivision, located south of the site, Quarter Horse Drive is proposed to be constructed as '/z of a 33-foot wide street section (shown in blue below)with curb, gutter and 5-foot wide attached concrete sidewalk abutting the site. b. Applicant Proposal: The applicant is proposing to complete Quarter Horse Drive from the site's west property line 259-feet east into the site (shown in green below)with curb, gutter and 5-foot wide attached concrete sidewalk abutting the site. The applicant is proposing to construct the remaining portion of Quarter Horse Drive, abutting the southeast property line (shown in red below), as a 33-foot wide street section with curb and gutter on both sides of the roadway and 5-foot wide attached concrete sidewalk on the north side of the roadway. The applicant is proposing to construct the remaining internal local streets as 33-foot wide street sections with curb, gutter and 5-foot wide concrete sidewalk within 47-feet of right-of-way. The applicant is proposing to construct a cul-de-sac turnaround at the terminus of Pivot Place. Staff Comments/Recommendations: The applicant's proposal to complete Quarter Horse Drive from the site's west property line 259-feet east into the site (shown in green below) with curb, gutter and 5-foot wide attached concrete sidewalk abutting the site, meets District policy and should be approved, as proposed. If Alexanders Landing does not move forward, the applicant should be required to construct Quarter Horse Drive from the site's west property line for a distance of 259-feet east into the site (shown in green below), as '/2 of a 33-foot wide street section with curb, gutter and 5-foot wide concrete sidewalk plus an additional 12-feet of pavement widening beyond the centerline of the roadway established for the street, a 3-foot wide gravel shoulder and borrow ditch sized to accommodate the roadway storm runoff. The applicant should be required to dedicate right- of-way to extend to 2-feet behind back of sidewalk on the north side and to 2-feet behind back of borrow ditch on the south side. 7 Pivot Pointe / MPP24-0011 / H-2024-0029 The applicant's proposal to construct Quarter Horse Drive, abutting the southeast property line (shown in red below), as a 33-foot wide street section with curb and gutter on both sides of the roadway and 5-foot wide attached concrete sidewalk on the north side of the roadway, meets District policy and should be approved as proposed. The right-of-way on the south side of the roadway should extend 2-feet behind the back of curb and touch the parcel to the south, parcel No. S1210325800. The applicant's proposal to construct the remaining internal local streets as 33-foot wide street sections with curb, gutter and 5-foot wide concrete sidewalk within 47-feet of right-of-way meets HORSE MEADOWS SUBDIVISION / e.;• i o6 1.9f L (FUTURE) _ wsa `oai — — O _ A '@ 'Tt � • _ R � & i� M m f ,1. - '. ''�I� 8 � r 6 I B _ ___ �_I._ •619 .:0 (,19 I�'t5.}E M..62 �} R99 ]6-0 C. 'W.W il.eg o 0 0 ALEXANDER LANDING O O � �s SUBDIVISION (FUTURE) urar n,x} x BLOCK District policy and should be approved, as proposed. The applicant should be required to construct the proposed cul-de-sac at the terminus of Pivot Place with a minimum turning radius of 50-feet. 3. Roadway Offsets a. Existing Conditions: There are no roadways within the site. b. Applicant's Proposal: The applicant is proposing to construct a local street, Biltmore Avenue, to intersect Pine Avenue located 1,193-feet from Black Cat Road. c. Staff Comments/Recommendations: The applicant's proposal does not meet District policy and should not be approved, as proposed. Consistent with District Collector Offset policy, the applicant should be required to construct Biltmore Avenue to align centerline-to-centerline with Biltmore Avenue located on the north side of Pine Avenue, across from the site. 4. Stub Streets a. Existing Conditions: Quarter Horse Drive, a local street, is proposed to stub to the site's west property line and was approved as part of ACHD's approval of Horse Meadows Subdivision. Bareback Street, a local street, is proposed to stub to the site's south property line and was approved as part of ACHD's approval of Alexanders Landing Subdivision and intersect with Quarter Horse Drive. b. Applicant Proposal: The applicant is proposing to construct a local stub street, Biltmore Avenue, to the site's south property line located 1,193-feet east of Black Cat Road (measured centerline-to-centerline). c. Staff Comments/Recommendations: The applicant's proposal to construct a local stub street, Biltmore Avenue, to the site's south property line located 1,193-feet east of Black Cat Road 8 Pivot Pointe / MPP24-0011 / H-2024-0029 meets District policy and should be approved, as proposed. The applicant should be required to install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". If Quarter Horse Drive has not been constructed as a stub street to the site's west property line as part of Horse Meadows Subdivision, then the applicant should be required to install a sign at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". If Bareback Street has not been constructed as part of Alexanders Landing Subdivision, then the applicant should be required to construct a temporary cul-de-sac turnaround at the terminus of Quarter Horse Drive, as it extends greater than 150-feet in length. The temporary cul-de-sac turnaround should be paved with a minimum 50-foot turning radius. If the temporary turnaround extends onto a buildable lot, the entire lot shall be encumbered by an easement and identified on the plat as a non-buildable lot until the street is extended. 5. Driveways 5.1 Pine Avenue a. Existing Conditions: There is an existing driveway from the site onto Pine Avenue, located 306-feet west of Biltmore Avenue (measured centerline-to-centerline). b. Applicant's Proposal: The applicant is proposing to close the existing driveway from the site onto Pine Avenue with vertical curb, gutter, an 8-foot wide drainage swale and 5-foot wide detached concrete sidewalk. c. Staff Comments/Recommendations: The applicant's proposal meets District policy and should be approved, as proposed. 5.2 Pivot Place a. Existing Conditions: Pivot Place is not constructed within the site. b. Applicant's Proposal: The applicant is proposing to construct a 26-foot wide curb cut type driveway onto the cul-de-sac of Pivot Place, in alignment with Pivot Place. c. Staff Comments/Recommendations: The applicant's proposal meets District policy with the exception of District Driveway Width policy, which states that residential driveways shall be restricted to a maximum width of 20-feet. The applicant should be required to construct the driveway as a maximum 20-foot wide curb cut type driveway. 6. Traffic Calming a. Staff Comments/Recommendations: With the extension of Quarter Horse Drive into the site, the roadway will be greater than 750-feet in length and will need to be redesigned to reduce the length of the roadways or to include the use of passive design elements. Speed humps/bumps and valley gutters will not be accepted as traffic calming. The applicant should be required to submit a revised preliminary plat showing the redesigned roadways for review and approval prior to plan approval and ACHD's signature on the first final plat. 7. Bridge for Kennedy Lateral The District will require that the applicant have ACHD approved plans for the crossing of the Kennedy Lateral (Biltmore Avenue) prior to the pre-construction meeting and final plat approval. Note: Timing of project plan submittals should take into account review times, lead time for precast members and potential roadway closures. To ensure construction prior to irrigation season, approval of the project plans must be attained by January 15th.The District retains the right to modify 9 Pivot Pointe / MPP24-0011 / H-2024-0029 road closure approvals on any project based on the needs of the District. Construction of projects approved after January 15t" may be postponed until after irrigation season is over in October. It is recommended that bridge submittals be submitted before the end of the current irrigation season to ensure the best time frame for construction is attained. Submittals will need to include the street section extending over the bridge to ensure the requirements of the roadway are met. 8. Other Access Pine Avenue is classified as classified as a collector roadway. Other than the access specifically approved with this application, direct lot access is prohibited to this roadway and should be noted on the final plat. E. Policy 1. Federal Accessibility Design Guidelines and Standards District policy 7203.1.1 states that developers shall follow the current version of the U.S. Access Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way(PROWAG), 36 CFR Part 1190, September 7, 2023; (Also see, https//www.access-board.gov/prowag and https//www.access-board.gov/files/prowag/planning-and-design-for-alternatives.pdf for additional information). 2. Minor Improvements Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing Highways adjacent to a proposed development may be required. These needed transportation facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or bike lane construction or replacement (with physical buffers if missing and needed); construction of transitional sidewalk segments; crosswalk construction or replacement; curb and gutter construction or replacement; repair, replacement or expansion of curb extensions; replacement of unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle, pedestrian and bicycle traffic control devices; and other similar items. The current version of PROWAG will determine the applicable accessibility requirements for alterations and elements added to existing streets. ACHD staff is responsible for identifying the minor improvements that would be proportionate to the size and complexity of the development. 3. Livable Street Performance Measures District policy 7203.8 states that ACHD has adopted performance measures (level of stress) for evaluating the experience of bicyclists and pedestrians. ACHD seeks to create a transportation network that serves all ages and abilities. Bike and pedestrian facilities built through development should achieve a bike and pedestrian level of traffic stress 1 or 2, with no new bike lane below a minimum of 5-feet. 4. Pine Avenue Collector Street Policy: District policy 7206.2.1 states that the developer is responsible for improving all collector frontages adjacent to the site or internal to the development as required below, regardless of whether access is taken to all of the adjacent streets. Improvements shall include transitional segments in accordance with ADA and the current version of PROWAG. Master Street Map and Typologies Policy: District policy 7206.5 states that if the collector street is designated with a typology on the Master Street Map, that typology shall be considered for the required street improvements. If there is no typology listed in the Master Street Map, then standard street sections shall serve as the default. ACHD reserves the right to require bicycle and pedestrian facilities above those identified in the Livable Streets Design Guide and Master Street Map to ensure the safest facility possible based on current best practice. 10 Pivot Pointe / MPP24-0011 / H-2024-0029 Street Section and Right-of-Way Policy: District policy 7206.5.2 states that the standard right- of-way width for collector streets shall typically be 50 to 70-feet, depending on the location and width of the sidewalk or multi-use path and the location and use of the roadway. The right-of-way width may be reduced, with District approval, if the sidewalk or multi-use path is located within an easement; in which case the District will require a minimum right-of-way width that extends 2-feet behind the back-of-curb on each side. The standard street section shall be 47-feet (back-of-curb to back-of-curb). This width typically accommodates a single travel lane in each direction, a continuous center left-turn lane, and bike lanes. If a multi-use path is determined to be the required treatment, the street section shall be reduced to 37-feet. If it is determined a continuous center left-turn lane is not appropriate and a path is installed, the street section may be reduced to 26-feet. Residential Collector Policy: District policy 7206.5.2 states that the standard street section for a collector in a residential area shall be 36-feet (back-of-curb to back-of-curb). The District will consider a 33-foot or 29-foot street section with written fire department approval and taking into consideration the needs of the adjacent land use, the projected volumes, the need for bicycle lanes, and on-street parking. At the discretion of Traffic Engineering staff, adjustments may be made to the street section, including removal of the continuous center turn lanes or modification to lane widths, where no driveways or intersections are present or to ensure adequate space for pathways and buffers. Pedestrian Facilities: District policy 7206.5.6 requires a concrete sidewalk at least 5-feet wide to be constructed on both sides of all collector streets. A parkway strip at least 8-feet wide between the back-of-curb and street edge of the sidewalk is required to provide increased safety and protection of pedestrians. Consult the District's planter width policy if trees are to be placed within the parkway strip. Sidewalk constructed next to the back-of-curb shall be a minimum of 7-feet wide. Alternatively, on roadways identified as low-stress bikeways in ACHD's Bike Master Plan, a minimum 10-foot wide multi-use path may be required in lieu of sidewalks. ACHD Development Review staff will be responsible for determining the required facility. The path shall be built 8-feet behind the back-of-curb as measured to the closest edge of the path. Street trees are encouraged between the pedestrian facility and the roadway when irrigation and maintenance will occur by the adjacent property owner or HOA through an approved license agreement. Vertical hardscape alternatives to street trees may be considered in the buffer space when street trees are not practicable. Pedestrian facilities should be parallel to the adjacent roadway. Pedestrian facilities will only be allowed to deviate from a straight line when authorized by Development Review staff to meet site specific conditions (i.e., street trees, utilities, etc.). Appropriate easements shall be provided if public sidewalks or multi-use paths are placed out of the right-of-way. The easement shall encompass the entire area between the right-of-way line and 2-feet behind the back edge of the sidewalk or multi-use path. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Curb ramps or blended transitions shall be provided to connect the pedestrian access route at each pedestrian street crossing in accordance with the current version of PROWAG. Provide detectable warning surface in accordance with the current version of PROWAG. ACHD Master Street Map: ACHD Policy Section 3111.1 requires the Master Street Map (MSM) guide the right-of-way acquisition, collector street requirements, and specific roadway features required through development. This segment of Pine Avenue is designated in the MSM as a Residential Collector with 2-lanes and on-street bike lanes, a 36-foot street section within 60-feet of right-of-way. 11 Pivot Pointe / MPP24-0011 / H-2024-0029 5. Internal Local Streets Local Roadway Policy: District Policy 7207.2.1 states that the developer is responsible for improving all local street frontages adjacent to the site regardless of whether or not access is taken to all of the adjacent streets. Street Section and Right-of-Way Policy: District Policy 7207.5 states that right-of-way widths for all local streets shall generally not be less than 47-feet wide and that the standard street section shall be 33-feet (back-of-curb to back-of-curb). Standard Urban Local Street-33-foot Street Section and Right-of-way Policy: District Policy 7207.5.2 states that the standard street section shall be 33-feet (back-of-curb to back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 47-feet of right-of-way. For the City of Kuna and City of Star: Unless otherwise approved by Kuna or Star, the standard street section shall be 36-feet (back-of-curb to back-of-curb) for developments with any buildable lot that is less than 1 acre in size. This street section shall include curb, gutter, and minimum 5-foot wide concrete sidewalks on both sides and shall typically be constructed within 50-feet of right-of- way. Continuation of Streets Policy: District Policy 7207.2.4 states that an existing street, or a street in an approved preliminary plat, which ends at a boundary of a proposed development shall be extended in that development. The extension shall include provisions for continuation of storm drainage facilities. Benefits of connectivity include but are not limited to the following: • Reduces vehicle miles traveled. • Increases pedestrian and bicycle connectivity. • Increases access for emergency services. • Reduces need for additional access points to the arterial street system. • Promotes the efficient delivery of services including trash, mail and deliveries. • Promotes appropriate intra-neighborhood traffic circulation to schools, parks, neighborhood commercial centers, transit stops, etc. • Promotes orderly development. Sidewalk Policy: District Policy 7207.5.7 states that five-foot wide concrete sidewalk is required on both sides of all local street, except those in rural developments with net densities of one dwelling unit per 1.0 acre or less, or in hillside conditions where there is no direct lot frontage, in which case a sidewalk shall be constructed along one side of the street. Some local jurisdictions may require wider sidewalks. The sidewalk may be placed next to the back-of-curb. Where feasible, a parkway strip at least 8- feet wide between the back-of-curb and the street edge of the sidewalk is recommended to provide increased safety and protection of pedestrians and to allow for the planting of trees in accordance with the District's Tree Planting Policy. If no trees are to be planted in the parkway strip, the applicant may submit a request to the District, with justification, to reduce the width of the parkway strip. Detached sidewalks are encouraged and should be parallel to the adjacent roadway. Meandering sidewalks are discouraged. A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the dedicated right-of-way. The easement shall encompass the entire area between the right-of-way 12 Pivot Pointe / MPP24-0011 / H-2024-0029 line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within the public right-of-way or wholly within an easement. Half Street Policy: District Policy 7207.2.2 required improvements shall consist of pavement widening to one-half the required width, including curb, gutter and concrete sidewalk (minimum 5- feet), plus 12-feet of additional pavement widening beyond the centerline established for the street to provide an adequate roadway surface, with the pavement crowned at the ultimate centerline. A 3-foot wide gravel shoulder and a borrow ditch sized to accommodate the roadway storm runoff shall be constructed on the unimproved side. Cul-de-sac Streets Policy: District policy 7207.5.8 requires cul-de-sacs to be constructed to provide a minimum turning radius of 50-feet; in rural areas or for temporary cul-de-sacs the emergency service providers may require a greater radius. Landscape and parking islands may be constructed in turnarounds if a minimum 29-foot street section is constructed around the island. The pavement width shall be sufficient to allow the turning around of a standard AASHTO SU design vehicle without backing. The developer shall provide written approval from the appropriate fire department for this design element. The District will consider alternatives to the standard cul-de-sac turnaround on a case-by-case basis. This will be based on turning area, drainage, maintenance considerations and the written approval of the agency providing emergency fire service for the area where the development is located. 6. Roadway Offsets Local Street Intersection Spacing on Principal Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. If it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 1,320-feet as measured from all other existing roadways as identified in Table 1 b (7205.4.7). Local Street Intersection Spacing on Minor Arterials: District policy 7205.4.3 states that new local streets should not typically intersect arterials. Local streets should typically intersect collectors. If it is necessary, as determined by ACHD, for a local street to intersect an arterial, the minimum allowable offset shall be 660-feet as measured from all other existing roadways as identified in Table 1 a (7205.4.6). Collector Offset Policy: District policy 7205.4.2 states that the optimum spacing for new signalized collector roadways intersecting minor arterials is one half-mile. District policy 7205.4.2 states that the optimum spacing for new signalized collector roadways intersecting principal arterials is one half-mile. District policy 7206.4.2 states that the preferred spacing for new collectors intersecting existing collectors is '/4 mile to allow for adequate signal spacing and alignment. District policy 7206.4.3 states that access is typically prohibited within the influence area of an existing or future roundabout intersection, which is generally considered the area from the intersection to the far end of the splitter islands. District policy 7206.4.5, states that the preferred spacing for a new local street intersecting a collector roadway to align or offset a minimum of 330-feet from any other street (measured centerline to centerline). Local Offset Policy: District policy 7207.4.2, requires local roadways to align or provide a minimum offset of 125-feet from any other street (measured centerline to centerline). 13 Pivot Pointe / MPP24-0011 / H-2024-0029 District policy 7208.4.2, requires commercial roadways intersecting other local streets (residential, industrial or commercial) to provide a minimum offset of 125-feet from any other roadway or intersection (measured centerline to centerline). District policy 7209.4.2, requires industrial roadways intersecting other local streets (residential, industrial or commercial) to provide a minimum offset of 125-feet from any other roadway or intersection (measured centerline to centerline). 7. Stub Streets Stub Street Policy: District policy 7207.2.4.3 states that stub streets will be required to provide circulation or to provide access to adjoining properties. Stub streets will conform with the requirements described in Section 7207.2.4, except a temporary cul-de-sac will not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE." In addition, stub streets must meet the following conditions: • A stub street shall be designed to slope towards the nearest street intersection within the proposed development and drain surface water towards that intersection; unless an alternative storm drain system is approved by the District. • The District may require appropriate covenants guaranteeing that the stub street will remain free of obstructions. Temporary Dead End Streets Policy: District policy 7207.2.4.4 requires that the design and construction for cul-de-sac streets shall apply to temporary dead end streets. The temporary cul- de-sac shall be paved and shall be the dimensional requirements of a standard cul-de-sac. The developer shall grant a temporary turnaround easement to the District for those portions of the cul- de-sac which extend beyond the dedicated street right-of-way. In the instance where a temporary easement extends onto a buildable lot, the entire lot shall be encumbered by the easement and identified on the plat as a non-buildable lot until the street is extended. 8. Driveways 8.1 Pine Avenue Access Policy: District Policy 7205.4.1 states that all access points associated with development applications shall be determined in accordance with the policies in this section and Section 7202. Access points shall be reviewed only for a development application that is being considered by the lead land use agency. Approved access points may be relocated and/or restricted in the future if the land use intensifies, changes, or the property redevelops. District Policy 7206.1 states that the primary function of a collector is to intercept traffic from the local street system and carry that traffic to the nearest arterial. A secondary function is to service adjacent property. Access will be limited or controlled. Collectors may also be designated at bicycle and bus routes. Driveway Location Policy (Signalized Intersection): District policy 7206.4.3 requires driveways located on collector roadways near a signalized intersection to be located outside the area of influence; OR a minimum of 440-feet from the signalized intersection for a full-access driveway and a minimum of 220-feet from the signalized intersection for a right-in/right-out only driveway. Dimensions shall be measured from the centerline of the intersection to the centerline of the driveway. Driveway Location Policy (Stop Controlled Intersection): District policy 7206.4.4 requires driveways located on collector roadways near a STOP controlled intersection to be located outside of the area of influence; OR a minimum of 150-feet from the intersection, whichever is greater. Dimensions shall be measured from the centerline of the intersection to the centerline of the driveway. 14 Pivot Pointe / MPP24-0011 / H-2024-0029 Successive Driveways: District policy 7206.4.5 Table 1 requires driveways located on collector roadways with a speed limit of 20 MPH and daily traffic volumes greater than 100 VTD to align or offset a minimum of 245-feet from any existing or proposed driveway. Driveway Width Policy: District policy 7206.4.6 restricts high-volume driveways (100 VTD or more)to a maximum width of 36-feet and low-volume driveways (less than 100 VTD)to a maximum width of 30-feet. Curb return type driveways with 30-foot radii will be required for high-volume driveways with 100 VTD or more. Curb return type driveways with 15-foot radii will be required for low-volume driveways with less than 100 VTD. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7206.4.6, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers in accordance with Table 2 under District Policy 7206.4.6. Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing Highways adjacent to a proposed development may be required. These needed transportation facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or bike lane construction or replacement (with physical buffers if missing and needed); construction of transitional sidewalk segments; crosswalk construction or replacement; curb and gutter construction or replacement; repair, replacement or expansion of curb extensions; replacement of unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle, pedestrian and bicycle traffic control devices; and other similar items. The current version of PROWAG will determine the applicable accessibility requirements for alterations and elements added to existing streets. ACHD staff is responsible for identifying the minor improvements that would be proportionate to the size and complexity of the development. 8.2 Pivot Place Driveway Location Policy: District policy 7207.4.1 requires driveways near intersections to be located a minimum of 75-feet (measured centerline-to-centerline) from the nearest local street intersection, and 150-feet from the nearest collector or arterial street intersection. Successive Driveways: District Policy 7207.4.1 states that successive driveways away from an intersection shall have no minimum spacing requirements for access points along a local street, but the District does encourage shared access points where appropriate. Driveway Width Policy: District policy 7207.4.3 states that where vertical curbs are required, residential driveways shall be restricted to a maximum width of 20-feet and may be constructed as curb-cut type driveways. Driveway Paving Policy: Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet into the site beyond the edge of pavement of the roadway. 9. Traffic Calming Speed Control and Traffic Calming Policy: District policy 7207.3.7 states that the design of local street systems should discourage excessive speeds by using passive design elements. If the design or layout of a development is anticipated to necessitate future traffic calming implementation by the District, then the District will require changes to the layout and/or the addition of passive design elements such as horizontal curves, bulb-outs, chokers, etc. The District will also consider texture changes to the roadway surface (i.e. stamped concrete) as a passive design element. These alternative methods may require maintenance and/or license agreement. 15 Pivot Pointe / MPP24-0011 / H-2024-0029 10. Tree Planters Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in planters less than 8-feet in width without the installation of root barriers. Class II trees may be allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed in planters with a minimum width of 10-feet. 11. Landscaping Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop signs. Landscape plans are required with the submittal of civil plans and must meet all District requirements prior to signature of the final plat and/or approval of the civil plans. 12. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared use path. AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection Treatments: The opening of a shared use path at the roadway should be at least the same width as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the full width of the ramp. FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average width of the trail to improve safety for users who will be traveling at various speeds. In addition, the overall width of the trail should be increased, so the curb ramp can be slightly offset to the side. The increased width reduces conflict at the intersection by providing more space for users at the bottom of the ramp. F. Standard Conditions of Approval 1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way (including all easements). 2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD right-of-way. 3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non- compliant pedestrian improvements abutting the site to meet current Americans with Disabilities Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), ISPWC, or ACHD requirements . The applicant's engineer should provide documentation of compliance to District Development Review staff for review. 4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details. 5. A license agreement and compliance with the District's Tree Planter policy is required for all landscaping proposed within ACHD right-of-way or easement areas. 6. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 16 Pivot Pointe / MPP24-0011 / H-2024-0029 7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details. 9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Standards unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 10. Construction, use and property development shall be in conformance with all applicable requirements of ACHD prior to District approval for occupancy. 11. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of any change from ACHD. 12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan and may require additional improvements to the transportation system at that time. Any change in the planned use of the property, which is the subject of this application, shall require the applicant to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a waiver/variance of the requirements or other legal relief is granted by the ACHD Commission. G. Conclusions of Law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular transportation system within the vicinity impacted by the proposed development. Request for Appeal of Staff Decision To request an appeal of a staff level decision, see District policy 7101.6.7 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 Request for Reconsideration of Commission Action To request reconsideration of a Commission Action, see District policy 1006.11 at https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000 17 Pivot Pointe / MPP24-0011 / H-2024-0029