HomeMy WebLinkAbout2024-07-27 Boise Project Board of ControlFRED BUTLER
CHAIRMAN OF THE BOARD
RICHARD MURGOITIO
VICE CHAIRMAN OF THE BOARD
ROBERT D. CARTER
PROJECT MANAGER
THOMAS RITTHALER
ASSISTANT PROJECT MANAGER
APRYL GARDNER
SECRETARY -TREASURER
MARY SUE CHASE
ASSISTANT SECRETARY -
TREASURER
City Cleric's Office
33 E Broadway Avenue
Meridian ID, 83642
(FORMERLY BOISE U.S. RECLAMATION PROJECT)
2465OVERLAND ROAD
BOISE, IDAHO 83705-3155
RU
27 July 2024
JUL 31 2024
CITY C)} - (�-,WF.f fDfnly
CITY CLERKS OFFICE
RE: Apex Farr Subdivision H 2O24-0014
E. Lake Hazel and S Locust Grove Rd.
Meridian
Boise -Kona Irrigation District See Attachment please
Farr Lateral 184+60
McBirney Lateral 05+00
Sec. 31, T3N, RI E, BM.
Sonya Allen:
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL:(208) 344-1141
FAX: (208) 344-1437
The United States' Farr Lateral and McBirney Lateral lies within the boundary of the
above -mentioned location. These easements for these laterals is held in the name of the
United States through the Bureau of Reclamation under the authority of the Act of
August 30, 1890. (26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain these laterals.
We assert the federal easement 30 feet from centerline both directions on the Farr Lateral
and 25 feet from centerline both directions on the McBirney Lateral. Whereas this area is
for the operation and maintenance of our facility, no activity should hinder our ability to
do so. No variances will be granted.
The Boise Project does not approve landscaping including trees and/or shrubs (other than
gravel) within its easements, as this will certainly increase our cost of maintenance. All
fences, gates, pathways and Pressurized irrigation lines must be just off the edge of all
Boise Project easements. Easements must be left a flat drivable surface. No variances
will be granted.
Project facilities and/or easements that parallel and are within and/or intended to be
within road right-of-ways due to any development of this property must be relocated
outside of road right-of-ways.
The construction of any roadway crossings must be conducted only during the non -
irrigation season when the canal is dewatered. In any case no work shall take place
within the easement before the proper crossing agreements have been secured through the
Bureau of Reclamation and the Boise Project Board of Control.
Utilities planning to cross any project facility must do so in accordance with the master
policies now held between the Bureau of Reclamation and most of the utilities. In any
case, no work, shall take place within the easement before proper crossing agreements
have been secured through both the Bureau of Reclamation and the Boise Project Board
of Control.
Crossing agreements must be secured and signed by all parties prior to March ISt of each
year. A time schedule for the construction to be done during the non -irrigation season
must be approved by Boise Project prior to any activity within Project easements. No
construction will be allowed within the easement boundaries of the Boise Project Board
of Control facilities after March I" of each year. However, on a case -by -case basis,
overhead utilities crossing a Project facility may be allowed after March lth if reviewed
and approved by the Boise Project.
The piping and relocation of any Lateral, Canal and/or Drain must be reviewed and
approved by the Project and is (to include all appurtenant boxes and/or structures) and
must be warranted by the landowner for a period of (5) five -years. The Warrantee
Agreement must be secured prior to ANY disturbance of that facility. A relocation
agreement must also be procured through the Bureau of Reclamation prior to any
construction within the above -mentioned easement.
Boise Project Board of Control must approve any requests and/or relocation of delivery
points prior to construction.
Storm Drainage and/or Street Runoff must be retained on site.
NO DISCHARGE into any live irrigation system is permitted.
Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to
serve neighboring properties, must remain unobstructed and protected by an appropriate
easement by the landowner, developer and contractors.
This development is subject to Idaho Code 31-3805, in accordance, this office is
requesting a hard copy of all plans that must include the irrigation and drainage plans.
Whereas this property lies within Boise -Kona Irrigation District it is important that
representatives of this development contact the BKID office as soon as possible to
discuss a pressure system prior to any costly design work. If applicable, the irrigation
system will have to be built to specific specifications as set by the District / Project.
Boise Project Board of Control must receive a written response from the Boise-Kuna
Irrigation District as to who will own and operate the pressure irrigation system prior to
review and approval of an irrigation plan by Boise Project Board of Control.
Wording on the preliminary and final recorded plat needs to state that any proposed
and/or future usage of the Boise Project Board of Control facilities are subject to Idaho
Statues, Title 42-1209.
Future preliminary and final plats must call out the Project easements and the plats must
also note, which lots have surface irrigation water rights and which lots do not.
Whereas this development is in its preliminary stages, Boise Project Board of Control
reserves the right require changes when our easements and/or facilities are affected by
unknown factors even during the construction phase.
If you have any fiirther questions or comments regarding this matter, please do not
hesitate to contact me at (208) 344-1141.
Sincer
�Ritthaler
Assistant Project Manager, BPBC
for/tr
cc: Kevin Reeves
Alicia Flavel
File
Watermaster, Div; 2 BPBC
Secretary -Treasurer BKID
Information Sheet
18 December 2020
u
ZE d OO
NNNN
V: 1: " d'Lq
MMMMM � � 00
Ln
(p
lb l0 Ln Ln
cnI
NNNN
MMIM MMM �q (h 01Q1
L�
H
MMM
N
t� NI�Ln U)Ln I�OpN �Ln^�N
N MON NN r 66 �06�4�-10 .M-1 M 00
Q � O M O N N ,�
ORLr! N LLn Ln N
yN. yd-- li ci. C}; }} }}
m ^�O 00 OW WO Cj L]ko' WMO O O W W
O 0) 'V" .--I V" ri z cJ- z z 00 z v: d' v: z z N ,-1 N � H , i O ri Q ri 14 ra
a OG � � � � m CO c N OO OG CO � M
J LQL lQ1 lQL LQL LQL LQLx�IQL �UQUQ Q Q UU
U LL z 11 LL LL Y: 7-
U
Ju u u uJ u
J JJJJ 4UCJH
N O N N N N J J ,UJ J J � O +
N N N g E J J J J J C N N
tJ� H H H H 1Ci IClu t t
I Q Q Q Q Q > >
H H H O O O O O O O O O C
QI Q1 .0 .0 .G .O ' .I .0 .Ccn
di �) Q1 Q1 O1 01 O1 cmQf
O o 0 m M M M M M m M M M M M V) M
e--I ri
Q M d] 00
O O O r� ra M M M M Ln Ln Ln Ln Ln Ln Ln l0 l0
f6 l0 W l0 t0 l0 l0 l0 lO l0 l0 l0 t0 l0 l0 l0 lD t0 l0
N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
U) MMca MOO MMcom mmmmm M m coca