Loading...
HomeMy WebLinkAbout2024-07-27 Boise Project Board of ControlFRED BUTLER CHAIRMAN OF THE BOARD RICHARD MURGOITIO VICE CHAIRMAN OF THE BOARD ROBERT D. CARTER PROJECT MANAGER THOMAS RITTHALER ASSISTANT PROJECT MANAGER APRYL GARDNER SECRETARY -TREASURER MARY SUE CHASE ASSISTANT SECRETARY - TREASURER City Cleric's Office 33 E Broadway Avenue Meridian ID, 83642 (FORMERLY BOISE U.S. RECLAMATION PROJECT) 2465OVERLAND ROAD BOISE, IDAHO 83705-3155 RU 27 July 2024 JUL 31 2024 CITY C)} - (�-,WF.f fDfnly CITY CLERKS OFFICE RE: Apex Farr Subdivision H 2O24-0014 E. Lake Hazel and S Locust Grove Rd. Meridian Boise -Kona Irrigation District See Attachment please Farr Lateral 184+60 McBirney Lateral 05+00 Sec. 31, T3N, RI E, BM. Sonya Allen: OPERATING AGENCY FOR 167,000 ACRES FOR THE FOLLOWING IRRIGATION DISTRICTS NAMPA-MERIDIAN DISTRICT BOISE-KUNA DISTRICT WILDER DISTRICT NEW YORK DISTRICT BIG BEND DISTRICT TEL:(208) 344-1141 FAX: (208) 344-1437 The United States' Farr Lateral and McBirney Lateral lies within the boundary of the above -mentioned location. These easements for these laterals is held in the name of the United States through the Bureau of Reclamation under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945) The Boise Project Board of Control is contracted to operate and maintain these laterals. We assert the federal easement 30 feet from centerline both directions on the Farr Lateral and 25 feet from centerline both directions on the McBirney Lateral. Whereas this area is for the operation and maintenance of our facility, no activity should hinder our ability to do so. No variances will be granted. The Boise Project does not approve landscaping including trees and/or shrubs (other than gravel) within its easements, as this will certainly increase our cost of maintenance. All fences, gates, pathways and Pressurized irrigation lines must be just off the edge of all Boise Project easements. Easements must be left a flat drivable surface. No variances will be granted. Project facilities and/or easements that parallel and are within and/or intended to be within road right-of-ways due to any development of this property must be relocated outside of road right-of-ways. The construction of any roadway crossings must be conducted only during the non - irrigation season when the canal is dewatered. In any case no work shall take place within the easement before the proper crossing agreements have been secured through the Bureau of Reclamation and the Boise Project Board of Control. Utilities planning to cross any project facility must do so in accordance with the master policies now held between the Bureau of Reclamation and most of the utilities. In any case, no work, shall take place within the easement before proper crossing agreements have been secured through both the Bureau of Reclamation and the Boise Project Board of Control. Crossing agreements must be secured and signed by all parties prior to March ISt of each year. A time schedule for the construction to be done during the non -irrigation season must be approved by Boise Project prior to any activity within Project easements. No construction will be allowed within the easement boundaries of the Boise Project Board of Control facilities after March I" of each year. However, on a case -by -case basis, overhead utilities crossing a Project facility may be allowed after March lth if reviewed and approved by the Boise Project. The piping and relocation of any Lateral, Canal and/or Drain must be reviewed and approved by the Project and is (to include all appurtenant boxes and/or structures) and must be warranted by the landowner for a period of (5) five -years. The Warrantee Agreement must be secured prior to ANY disturbance of that facility. A relocation agreement must also be procured through the Bureau of Reclamation prior to any construction within the above -mentioned easement. Boise Project Board of Control must approve any requests and/or relocation of delivery points prior to construction. Storm Drainage and/or Street Runoff must be retained on site. NO DISCHARGE into any live irrigation system is permitted. Per Idaho Statutes, Title 42, local irrigation/drainage ditches that cross this property, to serve neighboring properties, must remain unobstructed and protected by an appropriate easement by the landowner, developer and contractors. This development is subject to Idaho Code 31-3805, in accordance, this office is requesting a hard copy of all plans that must include the irrigation and drainage plans. Whereas this property lies within Boise -Kona Irrigation District it is important that representatives of this development contact the BKID office as soon as possible to discuss a pressure system prior to any costly design work. If applicable, the irrigation system will have to be built to specific specifications as set by the District / Project. Boise Project Board of Control must receive a written response from the Boise-Kuna Irrigation District as to who will own and operate the pressure irrigation system prior to review and approval of an irrigation plan by Boise Project Board of Control. Wording on the preliminary and final recorded plat needs to state that any proposed and/or future usage of the Boise Project Board of Control facilities are subject to Idaho Statues, Title 42-1209. Future preliminary and final plats must call out the Project easements and the plats must also note, which lots have surface irrigation water rights and which lots do not. Whereas this development is in its preliminary stages, Boise Project Board of Control reserves the right require changes when our easements and/or facilities are affected by unknown factors even during the construction phase. If you have any fiirther questions or comments regarding this matter, please do not hesitate to contact me at (208) 344-1141. Sincer �Ritthaler Assistant Project Manager, BPBC for/tr cc: Kevin Reeves Alicia Flavel File Watermaster, Div; 2 BPBC Secretary -Treasurer BKID Information Sheet 18 December 2020 u ZE d OO NNNN V: 1: " d'Lq MMMMM � � 00 Ln (p lb l0 Ln Ln cnI NNNN MMIM MMM �q (h 01Q1 L� H MMM N t� NI�Ln U)Ln I�OpN �Ln^�N N MON NN r 66 �06�4�-10 .M-1 M 00 Q � O M O N N ,� ORLr! N LLn Ln N yN. yd-- li ci. C}; }} }} m ^�O 00 OW WO Cj L]ko' WMO O O W W O 0) 'V" .--I V" ri z cJ- z z 00 z v: d' v: z z N ,-1 N � H , i O ri Q ri 14 ra a OG � � � � m CO c N OO OG CO � M J LQL lQ1 lQL LQL LQL LQLx�IQL �UQUQ Q Q UU U LL z 11 LL LL Y: 7- U Ju u u uJ u J JJJJ 4UCJH N O N N N N J J ,UJ J J � O + N N N g E J J J J J C N N tJ� H H H H 1Ci IClu t t I Q Q Q Q Q > > H H H O O O O O O O O O C QI Q1 .0 .0 .G .O ' .I .0 .Ccn di �) Q1 Q1 O1 01 O1 cmQf O o 0 m M M M M M m M M M M M V) M e--I ri Q M d] 00 O O O r� ra M M M M Ln Ln Ln Ln Ln Ln Ln l0 l0 f6 l0 W l0 t0 l0 l0 l0 lO l0 l0 l0 t0 l0 l0 l0 lD t0 l0 N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y U) MMca MOO MMcom mmmmm M m coca