Loading...
HomeMy WebLinkAboutC3.5 GRADING & DRAINAGE PLAN - AREA FOUR ORIGINAL SURVEY ON FILE AT LAND SOLUTIONS SS p\STER�_o'L� i q6-� � ��,6/3/2024 p OF T M PGA' 0 DB 5 / z Z 0 M \ — _ 6p, y E L o cc: 1rr Q O N uf^+ O C7 0 .v a7 W W O CO Maui o0a) = ccopp c� ' m o s 4° W n a m o n D ai Z ° 'j C O (0.m C �j N C U Q "I' UJ W C7= J i "IL co cc O \� B • • • • • • i LL W co CD N B ' w 01 ' \ / l • 01 z C — _ w DB 4 m 0 T _ - w z a m 0 T KEY MAP 0 U H K 100 O 100 200 300 z N z w SGALE: I"= 100'-0" w 0 w Copyright Oc 2024 z All rights reserved. Reproduction or use in any form o or by any means without written permission of � Breckon Land Design,Inc.is unlawful and subject to 0 J criminal prosecution. w a GRADING LEGEND 0 1040' Z - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - PROPOSED CONTOUR w EXISTING CONTOUR Z - - -1050— — X1050.24 EXISTING SPOT ELEVATION O a GRADE BREAK GRADE BREAK LINE U — GB- - - GB- - - 01 �"� 3R\ +�TOA 1t32.76t SPOT ELEVATION z L BOC 1132.26 Q w ri ... 2.55%... DIRECTION OF FLOW 8 GRADIENT W ❑ LJ o PI RR TOP/BOTTOM OF SWALE Q —Top 8" SEWER MAIN O a 8" WATER MAIN W o -------------- \ o \\\ --------- 25' WATER MAIN SETBACK v 7 Uj 0 I / I SEEPAGE BED 0 N CATCH BASIN/SEDIMENT BOX - TYPE G Uj ui MONITORING WELL LOCATION W Q MOUNTABLE VERTICAL CURB LOCATION W,i i ; / -r7 _ _ • TOS/BOS TOP/BOTTOM OF SWALE ELEVATION 55.95 RE RIM ELEVATION l/ _ EXTEND PATHWAY TO E. �� - � \\ TOA TOP OF ASPHALT ELEVATION W o \ \ !� �j ,k x,� LAKE HAZEL \ \ \\\ ToC TOP OF CONCRETE ELEVATION O W BOC BACK OF CURB c� W Hp H16H POINT OF FINISH GRADE T / r _ \� �r I� \ \ \ I LOW POINT OF FINISH GRADE `P Z z CIE) FIFE FLOOR ELEVATION O ` 7 `/ \\ \ \ \ \ \ \ BENCHMARK %BM Q TOB , CALLOUT LEGEND ROAD CONSTRUCTION. SEE DETAIL I/G3.7 Q 55.76 M - - h - ! �� O INSTALL CATCH BASIN/SEDIMENT BOX - y "' M U _ \ y \ \ TYPE G PER ISPWG 50-605. a a o= y 2: °OW'' ° W W \ / O TRANSITION FROM 6" VERTICAL CURB TO �\ aim°C'.0, O �' W W ,��jr �pB\\ / \ 3" ROLLED CURB GUTTER ��\ H z m a W z - LLI � _ - - - - - - - - - - - - - - - - - - - - - - - - - - �- - ! - - - - \ _ /� - - O PEDESTRIAN RAMP, SEE DETAIL 2/G2.5 co m a Q o m c� W� W �Lu LL] \ � � � � /I � ��� Cm �U)- — — — — — — — — — — — — — — — — — — — — — — — ? 1i ��' � � — — INSTALL MONITOR WELL, SEE DETAIL Q?�W o r O5 4/G3.2 ° O z Z \ O TEST PIT LOCATION TO CONFIRM DEPTH REVISIONS LL J J TO FREE DRAININ6 SOILS. SEE DETAIL No. Date Description Q ±F- INSTALL 12-INCH PG, 0° ENDF- W Og INSTALL 12-INGH PVG, 22.5° BEND _ _ _ _ _ _ _ _ O PROJECT NO.: O INSTALL GURBINS OUT. SEE DETAIL 2, --+FEP EEFEP EIFEP EIFEP E FEP FEP EFEP EIFEP EFEP E FEP— 9 SHEETG3.7 24029 B i0 INSTALL CURBIN6 IN. SEE DETAIL 3, DRAWN BY: ^ SHEET G3.1. BE L.L CHECKED BY: 0- 11 TRANSITION GURBINC FROM IN (DTL - VV 1 - - - !1 " - W1 - - W1 2" _ W1 2" _ W1 2 _ W1 2" _ W1 2" _ 3/G3.-1) TO OUT (DTL 2/G31) �B, HKM Q DATE: 0 12 SLOPE SHOULDER 2' @ 6:1, TRANSIITON TO 06/03/2024 MATCH EXISTING GRADE n ter. O o SHEET NUMBER A T GRADING AND DRAINAGE PLAN - AREA 4 N 20 0 20 40 60 C3.5 _I SCALE: I"= 20'-0" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16