Loading...
HomeMy WebLinkAboutConsor Ada Lift Station and Gravity Line Task Order 10038.e C� fIEN .D L4,, MEMO TO CITY COUNCIL Request to Include Topic on the City Council Agenda From: Sandra Ramirez, Procurement Div. Meeting Date: July 9, 2024 Presenter: N/A Estimated Time: 0.00 Topic: Approval of Task Order 10038.e to Consor for Services during Construction to Can Ada Lift Station and Gravity Line for the Not-to-Exceed amount of$385,842.00. Recommended Council Action: Approve Task Order 10038.e and authorize Procurement Manager to execute both Task Order and Purchase Order (PO) for the Not-to-Exceed amount of$385,842.00. Background: No additional information. Mayor Robert E. Simison City Council Members: E IDIA N Luke Cavener, President Liz Strader,Vice President U A H V Brian Whitlock Doug Taylor John Overton Anne Little Roberts TO: Mayor Robert E. Simison Members of the City Council FROM: David Briggs, P.E., P.M.P. DATE: July 1, 2024 SUBJECT: TASK ORDER#10038. FOR THE CAN ADA LIFT STATION & GRAVITY LINE SERVICES DURING CONSTRUCTION WITH CONSOR NORTH AMERICA,INC. FOR A NOT TO EXCEED AMOUNT OF $385,842.00 PURSUANT TO THE MASTER SERVICE AGREEMENT APPROVED BY THE CITY COUNCIL OCTOBER REQUESTED COUNCIL DATE: L RECOMMENDED ACTION A. Move to: 1. Approve Task Order 10038. with Consor North America, Inc. for the Can Ada Lift Station and Gravity Line Services During Construction, for a not-to- exceed cost of$385,842.00 2. Authorize the Mayor to sign the agreement II. DEPARTMENT CONTACT PERSONS David Briggs, P.E, P.M.P, Staff Engineer II 208-489-0347 Clint Dolsby, P.E., Assistant City Engineer 208-489-0341 Warren Stewart, City Engineer 208-489-0350 Laurelei McVey, Director of Public Works 208-985-1259 III. DESCRIPTION A. Backsuound Page I of 3 The City of Meridian 2017 Collection System Master Plan(CSMP) identified the Can Ada Lift Station(LS) as a future regional lift station required to serve the full build out of the master plan study area. The LS will be located southeast of the intersection of N. Can Ada Rd. and W. McMillian Rd. The City obtained a 1.6- acre site for the LS in 2022. This LS and associated infrastructure are necessary to service Growth in a four-square mile area (previously the Fields District), including the proposed Cole Valley Christen School. B. Proposed Project CONSOR NORTH AMERICA, INC. will provide engineering services for the construction support services of the project. This Task Order will allow Consor to assist the City during construction of the Can Ada Lift Station and Gravity Line. C. Consultant Selection CONSOR NORTH AMERICA, INC. was selected for this project due to their expertise in the design and analysis of sewer lift stations of similar size and scope. IV. IMPACT A. Strategic Impact: This project meets our mission requirements to identify and prioritize work to anticipate, plan and provide public services and facilities that support the needs of our growing community, ensure modern, reliable facilities while maintaining financial stewardship. B. Service/Delivery Impact: Providing a lift station at the intersection of Can Ada Rd and McDermott Rd is keeping in line with the approved sewer master plan and allows for current demands and future plans for this area. C. Fiscal Impact: Project Costs: Fiscal Year 2022 Can Ada Lift Station $181,871.00 Concept Design Fiscal Year 2023 Can Ada Lift Station& $837,379.00 Gravity Line—Final Design Fiscal Year 2024 Can Ada Lift Station and $385,842.00 Gravity Line Services During Construction Total Design Cost $1,405,092.00 Page 2 of 3 Construction scheduled to be advertised August 2024. Project Funding FY 2022 $500,000 FY 2023 $2,200,000 FY 2024 $12,600,000 FY 2025 $6,200,000 Total Available Funding $21,500,000.00 V. ALTERNATIVES No alternatives to this project at this time. VI. TIME CONSTRAINTS Council's approval will allow this project to continue and allow for this LS to be constructed which will serve future communities and the future Cole Valley Christian School. VII. LIST OF ATTACHMENTS Approved for Council Agenda: Page 3 of 3 CONTRACT CHECKLIST I. PROJECT INFORMATION Date: 5.24.24 REQUESTING DEPARTMENT Public Works Project Name: Can Ada Lift Station and Gravity Line Project Manager: David Briggs Contract Amount: $385,842 Contractor/Consultant/Design Engineer: ConSOr North America, Inc. Is this a change order? Yes ❑ No ❑ Change Order No. II. BUDGET INFORMATION (Project Manager to Complete) III. Contract Type Fund: 60 Budget Available(Purchasing attach report): Department 3590 Yes ❑� No ❑ Construction ❑ GL Account 96144 FY Budget: 24 Task Order ❑ Project Number: 10038.e Enhancement: Yes ❑ No ❑ Professional Service ❑ Equipment ❑ Will the project cross fiscal years? Yes❑J No ❑ Grant ❑ IV. GRANT INFORMATION-to be completed only on Grant funded projects Grant#: Wage Determination Received Wage Verification 10 Days prior to bid due date Debarment Status(Federal Funded) Print and Attach the determination Print,attach and amend bid by addendum(if changed) www.sam.gov Print and attach V. BASIS OF AWARD BID RFP/RFQ TASK ORDER Award based on Low Bid Highest Ranked Vendor Selected Master Agreement Category 2B (Bid Results Attached) Yes ❑ No ❑ (Ratings Attached) Yes ❑No Date MSA Roster Approved: 10.1.2021 Typical Award Yes ❑ No ❑ If no please state circumstances and conclusion: Date Award Posted: 7 day protest period ends: VI. CONTRACTOR/CONSULTANT REQUIRED INFORMATION PW License Expiration Date: Corporation Status Active-Existing Insurance Certificates Received(Date): Expiration Date: Rating: Payment and Performance Bonds Received(Date): Rating: Builders Risk Ins.Req'd: Yes ❑ No ❑ If yes,has policy been purchased? (Only applicabale for projects above$1,000,000) VII. TASK ORDER SELECTION (Project Manager to Complete) Reason Consultant Selected ❑ 1 Performance on past projects Check all that apply ❑ Quality of work ❑ On Budget 0 On Time Accuracy of Construction Est ❑ 2 Qualified Personnel ❑ 3 Availability of personnel ❑ 4 Local of personnel Description of negotiation process and fee evaluation: The scope of work has been compiled based on decisions that were made as a result of the Design efforts.The sope of work has been reviewed by Engieering and Operations personnel and is in line with our expectations for costs.Mountain Waterworks has completed work previously on time,within budget and has qualified personnel with significant experience with the City of Meridian. Clint Dolsby 7/1/2024 Enter Supervisor Name Date Approve Vill. AWARD INFORMATION Date Submitted to Clerk for Agenda: June 24,2024 Approval Date 7_q_?n?4 By: City Council Purchase Order No.: Date Issued: WH5 submitted (Only for PW Construction Projects) NTP Date: Contract Request Checklist.5.24.2016.Final City Of Meridian Statement of Revenues and Expenditures - Rev and Exp Report - Sandra 60 - Enterprise Fund 3590 - WW Construction Projects From 10/1/2023 Through 9/30/2024 Budget with Current Year Budget Amendments Actual Remaining Capital Outlay 96144 Lift Station construction 14,838,422.04 6,856.17 14,831,565.87 Total Capital Outlay 14,838,422.04 6,856.17 14,831,565.87 DEPT EXPENDITURES 14,838,422.04 6,856.17 14,831,565.87 TOTAL EXPENDITURES 14,838,422.04 6,856.17 14,831,565.87 Date: 6/24/24 09:38:27 AM Page: 1 TASK ORDER NO. 10038.e Pursuant to the MASTER AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN CITY OF MERIDIAN (OWNER) AND CONSOR NORTH AMERICA, INC. (ENGINEER) This Task Order is made this 9th day of July, 2024 and entered into by and between the City of Meridian, a municipal corporation organized under the laws of the State of Idaho, hereinafter referred to as "City", and accepted by Consor North America, Inc., hereinafter referred to as "Engineer" pursuant to the mutual promises, covenant and conditions contained in the Master Agreement (category 2b) between the above-mentioned parties dated October 1, 2021. The Project Name for this Task Order is as follows: Can Ada Lift Station and Gravity Line Services During Construction PROJECT UNDERSTANDING-SUMMARY The Engineer's scope of services, time of completion, and compensation shall be set forth herein. This Task Order is for professional engineering to support construction of the Can Ada Lift Station and Gravity Line Project. SCOPE OF WORK The CITY's 2017 Collection System Master Plan (CSMP) identified the Can Ada Lift Station (LS) as a future regional lift station required to serve the full build out of the master plan study area. The LS will be located southeast of the intersection of N Can Ada Rd and W McMillan Rd. The City obtained an approximately 1.59-acre site for the LS in 2022. The project includes the construction of the following elements (these elements were designed under a separate task order): • 18 and 21-inch gravity lines to route flow to the Can Ada LS. The gravity line will be located on McMillan Rd and flow from Star Rd, west to the LS. • Dual 10 and 14-inch force mains (FM), from the LS, flowing east on McMillan Rd from the LS to McDermott Rd, then south on McDermott Rd to a discharge at the Oaks LS. Oaks LS is located approximately 700-feet south of the McMillan and McDermott intersection. Task Order 10038.e Can Ada Lift Station and Gravity Line SDC Page 1 of 6 Consor • LS that includes a triplex wetwell with submersible pumps, discharge valve vaults, exterior control/electrical panels with shelter, vapor phase odor control, and emergency generator. Task 1 — Project Management Manage the project team, schedule, and ENGINEER'S budget for this task order. This includes monthly invoicing (invoices will include progress in terms of project percent complete), budget (percent spent and budget remaining) and schedule review, updates, and general administrative tasks. Monthly invoices will include updates on project schedule and budget. Deliverables • Monthly project updates (submitted with invoice) that summarize each month's budget, schedule, and work accomplished. Task 2 — Services During Bidding and Construction 2.1: Attend pre-bid meeting 2.2: Answer questions during the bid period. Assist the City in creating addenda during the bid period. 2.3: Review bid results and provide City Engineer's recommendation for award. 2.4: Develop conformed documents to incorporate revisions to the construction documents made via addenda during the bid period. 2.5: Attend the pre-construction meeting. 2.6: Respond to contractor questions during construction and assist the City in developing construction contract modifications (examples included below) 264 labor hours are budgeted o Request for proposals (RFP) o Work change directives (WCD) o Field orders o Change orders o Change Proposal Requests (CPR) 2.7: ENGINEER will review up to 50 technical submittals and shop drawings. 2.8: Perform general construction site visits and observations during construction (times to be decided during construction) o Performance of 6 general construction site visits by Consor o Performance of 1 observation by QRS (structural subconsultant) Task Order 10038.e Can Ada Lift Station and Gravity Line SDC Page 2 of 6 Consor o Performance of 3 observations by DC (electrical and I&C subconsultant) 2.9: Attend up to 52 biweekly (every other week) construction meetings in person at the Meridian WRRF located at 3401 Ten Mile Rd or at the job site. Budget includes meeting preparation, 1-2 hour meeting, developing and distributing meeting notes in coordination with the City. 2.10: Prepare for and attend startup (1-day site visit). 2.11: Prepare for and conduct a final inspection of the project with representatives of the City. Prepare a "punch list" of items of work remaining to achieve final completion of the project and to prepare for the City's acceptance of the project. Recommend procedures and timing of acceptance of the project. Advise the City and the contractor of the dates for any warranty periods as established in the contract documents. 2.12: Collect as-built information from the contractor and the City inspector. Prepare and produce complete sets of stamped Record Drawings per City Record Drawing Requirements. Record drawings maybe be submitted to Idaho Department of Environmental Quality (IDEA) per IDEQ requirements after City approval. 2.13: Compile all manufacturers' operation and maintenance (O&M) manuals on the project facilities provided by the construction contractor. Consor will include text in the operation and maintenance manual with instructions on operation of the facilities. Manuals may be submitted to IDEQ for approval only as directed by the City. 2.14: Coordinate with all approving agencies and submit required paperwork for project closeout. This includes ACHD, IDEQ, Pioneer Irrigation District (PID), Idaho Transportation Department (ITD) Bureau of Reclamation (BOR), and Williams Gas. Deliverables • PDF of meeting notes. Meeting notes and attendee log will be kept and official meeting minutes developed by Consor in collaboration with the City. Meeting minutes will be prepared and submitted to the City. • PDF of addenda. • PDF of recommendation of award. • PDF of meeting notes. Meeting notes and attendee log will be kept and official meeting minutes developed by Consor in collaboration with the City. Meeting notes to be distributed to the Contractor will be prepared in general accordance as described in Assumptions 2.2. • PDF of forms described above in task 2.6. • PDFs of submittal review forms. • PDF of site visit reports. • PDF of meeting notes. Meeting notes and attendee log will be kept and official meeting minutes developed by Consor in collaboration with the City. Meeting Task Order 10038.e Can Ada Lift Station and Gravity Line SDC Page 3 of 6 Consor notes to be distributed to the Contractor will be prepared in general accordance as described in Assumptions 2.2. • PDF of field report summarizing startup observation. • PDF of punch list. • PDF, 2 full size hard copies (for Maintenance and City Records), and 3 half size hard copies (for Electrical, Operations, and City PM) of record drawings. • PDF and 3 hard copies for City O&M staff. • PDF of 18-month anniversary punch list. • PDFs of forms required for agency closeout. ASSUMPTIONS While preparing our scope of services and fee schedule, we have made the following assumptions: • Task 1 assumes: 1. Project will go out to bid in August 2024 2. Bidding and construction contracting will take 3 months 3. 26 months for construction and project closeout (project completion in August 2026) • Task 2 assumes: 1. City will host and run pre-bid and pre-construction meetings. Engineer will attend in-person each meeting held. 2. Engineer will prepare meeting notes for 52 progress meetings, pre-bid and pre-construction meetings. Meeting minutes will be prepared and submitted to the City for review and comment within two full (2) business days of the meeting. The City will provide comments within two (2) business days of receiving draft minutes and Consor will make edits and distribute meeting minutes to the team within one (1) business day of receiving City's comments. It is expected that ALL progress meeting minutes will include the attendance log, three week look ahead provided by the Contractor, RFI log, CPR log, submittal log, action item log, and an attendance log, prepared by the Engineer. 3. Four (4) business days before each progress meeting, the City will edit the previous meeting minutes and provide the DRAFT copy to the Engineer to finalize. The Engineer is responsible to bring the finalized meeting minutes, a copy of the RFI log, CPR log, submittal log and action log to the progress meeting with a copy for each participant. The City will use this document to conduct each progress meeting. The Contractor will be responsible to bring a copy of the 3 week look ahead to the progress meeting. Task Order 10038.e Can Ada Lift Station and Gravity Line SDC Page 4 of 6 Consor 4. City will assemble the bid documents and distribute to potential bidders. 5. Assumed Bid and Construction period are listed in the Project Management task. 6. City will produce the final Bid Package. 7. The City will distribute any required addenda during the bid period. 8. The City will review bids and determine the apparent low bidder. 9. Pay requests will be reviewed by the City. 10.The City will provide a Project Representative that will be responsible for construction management and inspection of the project. a. City will act as POC with the construction contractor. Engineer will not have direct communication with the contractor unless previously approved by City. b. City will be responsible for any contract modifications (e.g. request for proposals, work change directives, field orders, change orders) to the construction contractor. Engineer will prepare RFP's, WCD, and Field Orders at the request of the City. The City will not initiate any of these documents but will review the document prepared by the Engineer. c. Engineer will issue submittal reviews to the construction contractor after City approval. 11.QA/QC inspections and testing are not included in this SOW. QA testing required by the Contractor is outlined in the construction documents. The City will hire a consulting firm to perform any desired QC testing. 12.City will prepare change orders after Engineer has reviewed the change order and provided their comments and recommendations. TIME OF COMPLETION and COMPENSATION SCHEDULE COMPENSATION AND COMPLETION SCHEDULE Task Description Estimated Completion Date Compensation 1 Project Management ■ Ongoing Throughout Project $30,477 2 Service During Bidding and Construction 2.1 Pre-bid meeting ■ 8/16/24 $4,867 2.2 Bidding questions and addenda ■ 8/27/24 $15,056 2.3 Review bid results ■ 8/30/24 $1,148 2.4 Develop conformed documents ■ 9/13/24 $6,833 2.5 Pre-construction meeting ■ TBD by Contractor Schedule $4,867 2.6 Contractor questions/work change ■ TBD by Contractor Schedule directives/field orders/change orders $59,868 2.7 Submittals ■ TBD by Contractor Schedule $45,482 Task Order 10038.e Can Ada Lift Station and Gravity Line SDC Page 5 of 6 Consor 2.8 General construction site visits ■ TBD by Contractor Schedule $53,757 2.9 52 bi-weekly construction meetings ■ TBD by Contractor Schedule $110,308 2.10 Startup ■ TBD by Contractor Schedule $13,434 2.11 Final inspection and punchlist ■ TBD by Contractor Schedule $9,791 2.12 Record drawings ■ TBD by Contractor Schedule $19,746 2.13 1 O&M Manuals ■ TBD by Contractor Schedule $6,239 2.14 1 Agency closeout • TBD by Contractor Schedule $3,969 TASK ORDER TOTAL: $385,842.00 The Not-To-Exceed amount to complete all services listed above for this Task Order No. 10038.e is three hundred eighty-five thousand eight hundred forty-two dollars ($385,842.00). No compensation will be paid over the Not-to-Exceed amount without prior written approval by the City in the form of a Change Order. No travel or expenses will be reimbursed through this agreement. All costs must be incorporated in the individual tasks within the Compensation and Completion Schedule above. CITY OF MERIDIAN CONSOR 8X L'IML1-mt N J.I,rL Dennis M Gallnata BY: BY: KEITH WATTS, Procurement Manager DENNIS GALINATD, PE_ Principal Engineer 7-9-2024 Approved By City Council 5l20/24 Dated: Dated: City Project Manager: David Briggs Task Order 10038.e Can Ada Lift Station and Gravity Line SDC Page 6 of 6 Consor