Loading...
HomeMy WebLinkAboutLake Hazel Locust Grove Utility Improvements-Apex ADA COUNTY RECORDER Trent Tripple 2024-034391 BOISE IDAHO Pgs=1 BONNIE OBERBILLIG 06/26/2024 08:44 AM CITY OF MERIDIAN, IDAHO NO FEE NOTICE SATISFACTION OF WARRANTY SURETY AGREEMENT and RELEASE OF WARRANTY SURETY For The Development Known As: Lake Hazel and Locust Grove Improvements Between SMITH BRIGHTON, INC And CITY OF MERIDIAN The Warranty Surety Agreement,recorded as Instrument 9 2022-061284, entered by and between the City of Meridian ("City"), a Municipal Corporation, and Smith Brighton, Inc, ("Developer"), has been satisfied in accordance with the City's requirements. Attached hereto is the City Engineer's letter confirming completion of all the required Public Improvements set forth in the Agreement and the City's consent to release of the warranty surety. SF,AL Chris Jo nson,N �erk 6-26-2024 STATE OF IDAHO ) ss County of Ada ) On this 26th day of June 2024, before me, a Notary Public, personally appeared Chris Johnson known or identified to me to be the City Clerk, respectively, of the City of Meridian, who executed the instrument or knows the person who executed the instrument on behalf of said City, and acknowledged to me that such City executed the same. Cha&ycWM CHARLENE WAY Notary Public for Idaho � COMMISSION NO. 67390 Residing at: Meridia Idaho NOTARY PUBLIC Commission expires: 3-28-2028 STATE OF IDAHO City of Meridian • 33 E. Broadway Avenue Meridian, ID 83642 Phone 208-888-4433 • Fax 208-887-4813 • www.meridiancity.org Mayor Robert E. Simison City Council Members: E IDIAN � Joe Borten, President � Liz Strader,Vice President Doug Taylor John Overton Anne Little Roberts Luke Cavener June 24, 2024 Mr. Jonathan Wardle — President Brighton Development, Inc. 2929 W. Navigator Drive Suite 400 Meridian, ID 83642 RE: Lake Hazel and Locust Grove Utility Improvements aka Apex Hazel & Locust Grove — Discharge from Warranty responsibility and Satisfaction of Warranty Surety Agreement Dear Mr. Jonathan Wardle: This letter is the final documentation from the on-site warranty inspection and the review of the deliverables provided to the City for the above noted project. The Public Works Department confirms that a warranty inspection has been performed and no apparent non-compliant items currently exist. Therefore, we are discharging you from the two-year warranty responsibility which commenced on the date of this project's formal acceptance letter. We hereby also consent to the release of the Warranty Surety being held by the City during the term of the warranty period and satisfaction of that certain Warranty Surety Agreement dated July 06, 2022 and recorded as Ada County Instrument No. 2022-061284. The City will record a notice of satisfaction of the recorded Instrument and release of Warranty Surety. Sincerely, Warren Stewart, P.E. City Engineer cc. City Clerk PW -Water Division PW -Wastewater Division PW - Construction Division PW - Engineering Community Development Dept.- File Public Works Department . 33 E Broadway Ave, Suite 200, Meridian, ID 83642 Phone 208-898-5500 . Fax 208-898-9551 . www.meridiancity.org