HomeMy WebLinkAboutAugust 17, 2006 P&Z Minutes
Meridian Planning & Zoning
August 17, 2006
Page 4 of 52
applicant has the final opportunity and, then, if we have any questions of staff we can
ask that and at that time we will deliberate and try and find a conclusion to each
application as they come through.
Item 4:
Continued Public Hearing from July 20, 2006: AZ. 06~029 Request for
Annexation and Zoning of 10.39 acres from RUT to an R-4 zone for
Silversprings Subdivision by Reed Kofoed - south side of McMillan
Road and west of Locust Grove Road:
Item 5:
Continued Public Hearing from July 20, 2006: PP 06~029 Request for
Preliminary Plat approval of 29 single-family residential lots and 4
common / other lots on 9.88 acres in a proposed R-4 zone Silversprings
Subdivision by Reed Kofoed - south side of McMillan Road and west of
Locust Grove Road:
Rohm: So, with that being said, I'd like to at this time open the continued Public Hearing
from July 20th of AZ 06-029 and PP 06-029, both related to Silversprings Subdivision
and begin with the staff report.
Veatch: Thank you, Chairman Rohm, Commissioners. Tonight's project is
Silversprings Subdivision. The applicant Reed Kofoed, representing F&C Development,
Incorporated, is asking for annexation and zoning of 9.8 acres from RUT to R-4 and
preliminary plat approval for 29 single family residential building lots and four common
lots on 9.88 acres. The subject property is located, excuse me, on East McMillan Road
and North Meridian. These two parcels here that are part of the Silversprings. It is
mostly R-4 residential. We have the Cobre or Copper Basin Subdivision here. Other
parts -- this all, originally, was part of the Havasu Subdivision and it's coming in different
phases. We have a little bit of Ada County rural parcel up here. Down south here is the
Prospect Elementary School. To the east -- all of these are part of Crestwood
Subdivision and we do have a number of applications coming in for these. There is only
one of these towards the middle, I believe, that has not come in yet, to at least have a
pre-application meeting with staff. And, then, we also have Saguaro Canyon up to the
north. Originally this was postponed because we were trying to seek some clarity with
ACHD. Cobre Basin has what -- when they first came in for a preliminary plat was a -- a
stub street. During the final plat stage that was changed to an ingress-egress easement
and it's been landscaped. There is a large stamped concrete wall that runs along in
there. And, then, Red Horse -- North Red Horse Way is a collector that runs north to
south. Their road that we were hoping to connect to Silversprings is East Copper Ridge
Street. We met with ACHD, with members of the homeowners association from Cobre
Basin and with the applicants and it was determined that that right of way was not going
to be given. They were concerned with a number of issues, the primary one being the
traffic that would be traveling down towards the elementary school and people coming
through the subdivision. So, we are accepting the application as it is platted here, with
the main access point being up here on McMillan. In talking with ACHD they are
comfortable with this. There will be other developments in the Crestwood Subdivision
down the road that will give more access internally, connecting east to west, so we feel
Meridian Planning & Zoning
August 17, 2006
Page 5 of 52
that we can go ahead and -- although it would be more desirable to have that, we are --
we are accepting it as is. All existing buildings will be removed and there is a number of
open space here with internal parkway, the common lots and such, and they exceed the
minimum requirement for open space. And with that I will stand for any questions.
Rohm: Any questions of staff? Okay. At this time would the applicant like to come
forward, please?
Erickson: Mr. Chairman, Members of the Commission, I'm Ross Erickson, 1854 East
Lanark Street here in Meridian. On site we are asking for annexation and zoning to an
R-4 and a preliminary plat approval for the Silversprings Subdivision. Staff did a good
job of putting together the report and, as you can see, the hearing was continued to get
some resolution on that stub street connection issue. Within that time frame we did
meet with the homeowners association, ACHD, and the city and the developer and
myself and we went through and actually requested that the association, you know,
consider dedicating that cross-access easement as public right of way and after I guess
a lengthy discussion with them, they had unanimously voted not to dedicate that strip.
So, that's, I guess, why you're looking at the layout that we have here tonight. Some of
the highlights of the project -- and, actually, let me back up real quick. I just wanted to
correct one thing. There are two homes on the property that will be retained. One of
the homes is located right here and the other home is located right here. You can see
that the lots for those homes are actually a little bit larger, just to fit and meet some of
the zoning requirements, so we could retain those on those lots. Some of the highlights
of the project -- we do have a parkway that runs on both sides of the street throughout
the entire project. It's an eight foot wide planter strip that will be landscaped with trees,
sod, and irrigation as part of the project. We have a centrally located common lot here
that will provide some open space and also a location to dispose of some storm water.
We have a swale located on that lot. To the south we have a pathway connection that
will connect the project to the Prospect Elementary School. It doesn't show very well on
this drawing, but down here from Havasu Creek there is also a pathway connection in a
similar corner to the site. We have met with Wendell Bigham from the school district
just to the discuss, you know, whether or not they were comfortable with the connection
he had indicated that they were okay with it. So, I think that's something that will be a
nice feature within the project. Other than that, you know, I think the development fits in
really well with the neighboring developments. We are at a gross density of 2.94 units
per acre. So, it's definitely not crammed in there. And we'll just ask for your approval
tonight.
Rohm: Thank you very much. Any questions of this applicant?
Moe: No, sir.
Rohm: Boy, it looks like you have done a good job putting this together. Thank you.
Erickson: All right. Thank you.
Meridian Planning & Zoning
August 17, 2006
Page 6 of 52
Rohm: Any discussion amongst the Commission before we close this Public Hearing?
Oh, there is nobody that signed up. I guess I should ask. Is there anybody that would
like to testify on this application at this time? Okay.
Zaremba: Mr. Chairman, I would ask to clarify one thing with staff while we are still
open and that is is the length of the cul-de-sac, plus the private driveway, within the fire
department's -- they add those together, I think, and have a maximum length.
Veatch: I don't recall that the fire department had issue with that. Let me just double
check.
Zaremba: I didn't see a comment.
Veatch: It looks like Mr. Cole is checking the length for me. Six hundred feet to the cul-
de-sac and I believe 750 is the --
Zaremba: Seven fifty sticks in my mind. So, if it's 600 that answers my question.
Thank you.
Veatch: Then, for the shared driveway, as long as they can reach 150 feet back they
are all right.
Zaremba: Okay. Thank you.
Rohm: Okay. Any other questions?
Borup: Mr. Chairman, just one kind of informational for future for myself and that's what
was originally a stub street was changed to an easement, but you said the homeowners
association did not want to grant use of that easement. Is it -- who has control -- I mean
if it's an easement, isn't it already in existence and -- I'm just confused on that a little bit.
Veatch: Right. That right of way does belong to the homeowners association and that
was at the time staff accepted that. I actually have --
Borup: Well, then, what was the purpose of it at the time? I mean what -- I don't see
where it accomplished anything by even creating it if -- if it's not really an easement.
Veatch: I believe there was some concern that until something developed to the east of
them that there would just be this ugly expanse of concrete and so staff had gone
ahead and decided upon this, so that they could have that as a common lot to
landscape until such time that it develops. So, the intent was there --
Borup: But there is no teeth in it? I mean it has developed now or it's in the process of
developing.
Veatch: It has, but --
Meridian Planning & Zoning
August 17, 2006
Page 7 of 52
Borup: And so the easement doesn't mean a thing it looks like.
Veatch: It doesn't have any teeth as far as giving us any leeway. We would have to --
ACHD would have to take that and they were not comfortable with that.
Borup: And I understand that and, actually, as close as that is to the entrance maybe it
makes sense. I don't know. But I'm thinking in the future how do we prevent something
like that from happening, assuming it was a good thing to start with.
Hood: Mr. Chairman. Yeah. It was a good thing and when that applicant submitted
their final plat they made the change from a public right of way through an easement
and our staff did not notice that and it got through the process as just an easement to
that property. Now, we could connect a road to that easement, but it wouldn't be a
public easement, it would just be an easement to that property, so it wouldn't function
like a public street. So, really, you don't get the functionality that we would be looking
for of a stub street. So, yeah, we missed it as staff or three or four or five years ago,
whenever that final plat was submitted to the city and should have required it to be a
public stub street, but it was just a private access easement.
Borup: So, it was a change on the plat from --
Hood: Correct.
Borup: Okay. Well, then, that explains how it happened.
Rohm: Okay. Good question.
Borup: Thank you.
Moe: Mr. Chairman?
Rohm: Commissioner Moe.
Moe: I Move that we close the Public Hearing on AZ 06-029 and PP 06-029.
Zaremba: Second.
Rohm: It's been moved and seconded that we close the Public Hearing on AZ 06-029
and PP 06-029. All those in favor say aye. Opposed same sign? Motion carried.
MOTION CARRIED: FOUR AYES. ONE ABSENT.
Moe: Mr. Chairman?
Rohm: Commissioner Moe.
Meridian Planning & Zoning
August17,2006
Page 8 of 52
Moe: After considering all staff, applicant, and public testimony, I move to recommend
approval to the City Council on file numbers AZ 06-029 and PP 06-029 as presented in
the staff report for the hearing date of August 17th, 2006.
Zaremba: Second.
Rohm: It's been moved and seconded that we forward onto City Council recommending
approval of AZ 06-029 and PP 06-029. All those in favor say aye. Opposed the same
sign? Motion carried. Thank you.
MOTION CARRIED: FOUR AYES. ONE ABSENT.
Item 6:
Public Hearing: AZ 06~037 Request for Annexation and Zoning of 4.85
acres from R-1 to C-G zone for Cope Subdivision by Ronald Van Auker
- east of Meridian Road and north of Overland Road:
Item 7:
Public Hearing: PP 06-035 Request for Preliminary Plat approval of 4
commercial lots on 4.31 acres in a proposed C-G zone for Cope
Subdivision by Ronald Van Auker - east of Meridian Road and north of
Overland Road:
Rohm: Thank for coming in. By the way, for those of you that may have come after we
started this hearing tonight, the reason the lights are off is because the bulb on our
projector is going out and if we turn the lights on you wouldn't be able to see anything.
So, that's -- it isn't our intent to keep you in the dark, but it just happens to be that way.
So, there you have it. Okay. All right. With that being said, at this time I'd like to open
the public hearings on AZ 06-037 and PP 06-035. Both of these applications are
related to Cope Subdivision and I'd like to begin with the staff report.
Veatch: Thank you, Chairman Rohm, Commissioners. We are going to shift gears a
little bit. This is a commercial project. The applicant is Ronald Van Auker of Van Auker
Properties and the subject applications are an annexation and zoning of 4.85 acres from
R-1 to a C-G zone and preliminary plat approval of four commercial lots on 4.31 acres.
The site is located in the northeast corner of Meridian and Overland Road. It is
surrounded primarily by commercial areas here. We have a light office area here and,
then, R-4 density just to the tip here. Let's see here. Wanted to note that we have
received comment from the applicant in agreement with the staff report. However, there
is one condition of the development agreement which I will go into more detail, but it's a
condition that has already been met. There is existing sewer and water in Overland
Road and so it's not necessary for it to be stubbed to the property and so I believe it's
the second to the last condition that says a 25-foot wide commercial drive aisle. Sewer
and water shall be stubbed to the property located at 130 East Overland Road. And I'd
like to delete that from the staff report. We have an aerial view. It's very near the
interchange. This is the site here. We have Gold's Gym located up here. The Ten Mile
drain is on the Meridian -- or, excuse me, the Overland side -- or Meridian side. Sorry.