Loading...
HomeMy WebLinkAboutC7.0_Irrigation Plan m E SF� O � 16970 4-10-24 c~_� nO,A/qTF OF U) L J 0 40 80 160 240 !w V) u� Y 0 SCALE: 1" = 80' Y -W1 U J U IRRIGATION NOTES �N o � °° to Z I \ 1. PRESSURIZED IRRIGATION CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE O O m O ma I \ \ o' WITH THE ISPWC SECTION 900 AND THE STANDARDS OF THE IRRIGATION DISTRICT co w cf) ~w \� IN WHICH THE PROJECT IS LOCATED. @j o w 2. SECURE AND ANCHOR ALL TEE, PLUGS, CAPS, BENDS, AND OTHER LOCATIONS ro ZIw c WHERE UNBALANCED FORCES EXIST BY SUITABLE THRUST BLOCKING IN L w I ACCORDANCE WITH ISPWC REQUIREMENTS. REMOVE IRRIGATION PIPE TO EXADITCH.YLIGHT1 \�F T Te c����tis 3 SURFACETHE S IRRIGATION SURE IGWATER WITH A BACKUPATION SYSTEM FOR S CONNECTION TO SUBDIVISION IL MERIDIAN L BE RDOM VED STIC 1 r;- cn FL ELEV=2688.34' (FIELD VERIFY PRIOR w IW c�e I�TF WATER SYSTEM. THE PRESSURE IRRIGATION SYSTEM INCLUDING THE PUMP STATION w TO CONSTRUCTION) a \\a Rq< AND MAINLINES WILL BE OWNED AND MAINTAINED BY THE WINDROW SUBDIVISION a_ o \Te \ COMMUNITY ASSOCIATION. w 3 4. REDUCED PRESSURE BACKFLOW DEVICES MUST BE APPROVED BY THE STATE OF GIRR MH #1-13 IDAHO, DEQ, AND MERIDIAN WATER DEPARTMENT,Lp O ` \ re < �7--00 5. COVER OVER PRESSURE IRRIGATION MAINLINES SHALL BE 2.5 FEET. o ^ O as ��, ~~° �'t`4• 8 t68LF 6" PVC Ld 6 1 7 ZO o 1 � U mw 3 7 t65LF 6" PVC F Q n z o � 0 BLOCK 6 m w c _ 6 \ KEYNOTES 1 � iv '-„!t_1.0_LF 4_""PVC \ 3 A Q w O a lw z ' \ t86LF 6" PVC \ 1 INSTALL 3 4" PI SERVICE LINE AND 4" VALVE BOX PER ISPWC SD-901. z a_ mu w � t51LF 4" PVC SLEEVED � O � O 0_ � Z ~ vi THROUGH C900 PVC \ a Q z 14 \ O2 11.25' ELBOW (MJxMJ) � 0 � Z m 1 5 \ w = I 3 7 d SUR N� �" a\ w Q o N O� Iw PNPSEy 3 PREM� m 0 22.5' ELBOW (MJxMJ) o Z v rn Z U IURE 8 / \ `yGP�ON \ \ � o N / 1 2 ��RR\ ® 45' ELBOW (MJxMJ) O a la 6 t146LF 4" PVC \ t74LF 6" PVC 5 Q z m� w Q Ii / 1 cP, Fc \ O 90' ELBOW (MJxMJ) J w Z + t92LF 4" PVC J w O I „`o� / 1 1 �� \ \ \ 2 1 � \\9LF 6" PVC 0 TEE (MJxMJxMJ) a s BLOCK 5 t64LF 6" PVC D re \ O7 GATE VALVE (FLGxMJ). SIZE TO MATCH DIAMETER OF MAINLINE. O U =mw Iw ao 3 3 t101LF 6" PVC 4 7 8 r 6 w G n 1 2 ` re ® PLUG PI MAIN AND MARK TO SURFACE FOR FUTURE EXTENSION w N p of \ t64LF 6" PVC O I t/101 LF 4" PVC mw N 8 �� A<A 1 10 �9L \ 2 re \ DESIGNED: C. GRAHAM 0_ :102LF 4" PVC O 2 �• y O �o0 1 -pi \ t98LF 6" PVC 1 \ CONNECT TO DRAWN: L. HAASE ++ t5LF 4" PVC \ t71 LF 4" PVC 1 / \moo EXISTING HEADGATE Li r, \ o o <8"SS 7 Li ao �a 3 7 6 0 9 \ s -1 1 I �Ox CHECKED: C. GRAHAM w mL ±41 LF 8" PVC SLEEVED 1 ' 2 7 6 rn I I �0 T� APPROVED: C. GRAHAM ~ THROUGH C900 PVC \ \ 1 2 rn� O I t29LF 4" PVC 7 \\ 8•S GIRR MH #1-1 `� \ 3 t49LF 4" PVC SLEEVED g U mL I THROUGH C900 PVC I ` PREPARED FOR: GIRR MH #1-11 t15LF 4" PVC \ 2 - I I `\ / 0 90, t41 LF 4" PVC SLEEVED I 6 7 \' 1 x GIRR MH #1-2 G 2 0 L LC O + n THROUGH C900 PVC 4 1 t47LF 6" PVC SLEEVED I °o 5 M N t24LF 4" PVC 7 \\ \ t82LF 4" PVC 2 THROUGH C900 PVC I 3 2c �� IX INTAKE/SCREEN BOX PO BOX 593 w I 32+00 31+00 8 C N I BLOCK 7 �p \ SEE DETAIL 1 SHEET C7.1 0' 0 a <12"GIRR t258LF 4" PVC \. o/ t139LF 6" PVC I • N 4'J �\\ \ / EAGLE ID 83616 7 �11 It113LF 8" PVCA t41LF 8" PVC mu tSLF 4 PVC Z ~ o a 7 5 t89LF 4" PVC 3 1 1 6 I' F Q I + t109LF 4" PVC gyp, I `\e f16 LF\2" PVC GIRR ® 1.56% I GIRR MH #1-12 a o - - - 'P� 4"PI \ . I I I I 5 c "' 6 t37LF 8" PVC SLEEVED I t58LF 8" PVC :max \ PRESSURE IRRIGATION CU 7 \ THROUGH C900 PVC I oPUMP J 1 1 3 Lu Q 1 1 1 1 1 1 " 4 �� ±I4I1ILF 8 IIIPVC 8"PI o ` \ re re SHEET C7.2T 10N. SEE BLOCK 3 t113LF 4 PVC "p/ 1 t87LF 8" PVC I I N I o •• �, I • � 7 1• I 6 1 ' 4 A/ re�t13LF 4"OPVC C O I I 1 O� 1 2 3 4 5 6 I' Y 3 3 I /� - ��� a� ALK/NS LAT � ( 2 I U N 5 I I 1 t115LF 8" PVC \ Fc t39LF 4" PVC`Tg ERAL w 0 t120LF 4" PVC N BLOCK 4 I ¢ BLOCK 5 t129LF 4" PVC I I t47LF 4" PVC I '� 3 - - I w 6 } x 3 t23LF 4" PVC Tg GIRR MH #1-10 �' I I� 1 _ _ Tg _ + w Q I 7 t41LF 4" PVC SLEEVED °o __ THROUGH C900 PVC 5 -Ec-TB TB J 7 - --------------------------- Z 4 6 _Tg -�Tg IF Lu U I 8.0. - 8"W - - 8"VN - 12 YV 'EG_ _ Tg= Tg t41LF 4" PVC SLEEVED 8"SS> <8"SS W.JASPER STREET - - - - - v- - -8+ W.JASPER STREET tSLF 8" PVC$ _ _t9LF 4" PVC EG Tg _ Tg O O I THROUGH C900 PVC <8"SS <8"SS <8"SS 7 - Z w 8"w — —EG__ V) GIRR MH #1-9 7 BLOCK 2 I " :•I BLOCK 1 + <8 SS _ Z z Z I + t99LF 4" PVC t914LF 4" PVC BLOCK 2 t82LF 4" PVC SLEEVED " t100LF 4" PVC a # - v 7 t41LF 4" PVC SLEEVED ao. O 00 THROUGH C900 PVC I I t19LF 4" PVC 10.00' IRRIGATION GIRR MH 1 3 Q or� EASEMENT a THROUGH C900 PVC O J J `�I 21 20 19 18 17 0 l6 15 14 13 12 11 c 10 8 7 6 0 5 4 3 2 I A I N 2 3 4 I 5 6 7 8 9 I 10 11 6 o t307LF 4" PVC GIRR MH 1 4 w z 7 # - t183LF 4" PVC > L = I I 1 moo, 1 1 1 1 � 1 1 1 L4"P�— 1 � 1 1 1 1 � 1 1 1 1 7 i• ao i 7 1 1 � 1 1 1 1 0 1 1 1 1 (� 3 3 ' -H {j_ w O I 4"P 4 PI 4'PI 4"P A� 4" 4"PI I m<12"GIRR ~ 212"GIRR — P 7+00 26+00 25+0 24+00 23+00 22+00 21+00 < 20+00 19+00 +00 17+00�� < I 6+00 15+00 w GIRR MH #1-8 ------------------------------------- -------- -------------------- 1 + -- -------- w 12"GRR ------------------- ---------------------- 1 �0� 0 a GIRR MH #1-7 GIRR MH #1-6 Ep o 6 ui ~ EP EP EP EP -�-- EP Ep FP EP o EP EP EP GIRR MH #1-5 EF-EPA E EP EP F_ O FP o -vu - - - -w- - - - -w- - - - -w- - - -EP w �_�ru- -fie-_ FPS—FP =vc� --�„� F� E�=mot O Z - - - - - - - - - - _W.AMITY ROAD - - - - 0 -- — - - - --- - - - - - - - - - - - — _ _ TB EP TB EP EP —TBEP TgEP TBEP—TgEP TB EP TgEPEP TB TB — ---�P—EP -- ---�p---�P---� --- --- --- �.— Ep OHP �AI Q - ` ❑ `Q OHP OHP " TB �IrP OH — E�OHP OHP_ - HP U 7 J L J ±94 LF 12" PVC C900 00.30% Y REMOVE EX. CMP CULVERT. DAYLIGHT 0_ O NEW IRRIGATION PIPE TO EX. DITCH. FL ELEV=2703.08' (FIELD VERIFY PRIOR w TO CONSTRUCTION) I- J_ U d N O Q N V)i CSW PROJECT NO. 19022 J oDRAWING DATE 04/10/2024 0 C a 0_ CTOC) H U