Loading...
HomeMy WebLinkAboutC0.0_Cover Sheet m SHEET INDEX IMPROVEMENT PLANS FOR °����\GE o C0.0 COVER SHEET CALL BEFORE YOU DIG Q `vvl �A D_ C0.1 NOTES CALL DIGLINE INC. WINDROW SUBDIVISION NO . 1 16970 4-10-24 C1 .0 FINAL PLAT SHEET 1 PRIOR TO COMMENCING w vfijats below. UNDERGROUND WORK LOCATED IN THE S 112 OF THE SW 1 /4 OF SECTION 25OF �qr C1 .1 FINAL PLAT SHEET 2 ��Call before you dig. (208) 342-1585 TOWNSHIP 3 NORTH, RANGE 1 WEST, BOISE MERIDIAN N^/E M.G�P�Q C1 .2 FINAL PLAT SHEET 3 �' C2.0 OVERALL SITE/UTILITY PLAN ADA COUNTY, IDAHO z J C3.0 MASS GRADING PLAN SOUTHWEST 2024 un rn cn C3.1 MASS GRADING PLAN EAST z V+ C3.2 MASS GRADING PLAN NORTH SURVEY DATUM ° C3.3 DRAINAGE PLAN N J C4.0 SWIFT CURRENT WAY/SELAWICK WAY PLAN AND PROFILE HORIZONTAL DATUM BASED ON ADA COUNTY GIS. � �W uj o V U j C4.1 JASPER STREET PLAN AND PROFILE ALL ELEVATIONS SHOWN ARE NORTH AMERICAN 0 C) C4.2 JASPER STREET PLAN AND PROFILE (CONT.) VERTICAL DATUM OF 1988 (NAVD 88). w 0 40 80 160 240 1 a in o M O C4.3 MAVORA WAY/SALTWATER AVE PLAN AND PROFILE I'D 00 z C4.4 AMITY ROAD IMPROVEMENT PLAN W AMITY RD Xp L ° rn co 3 o C5.0 SEWER LINE A PLAN AND PROFILE SCALE: 1" = 80' a U) 00 C5.1 SEWER LINE B PLAN AND PROFILE m E C5.2 SEWER LINE B+D PLAN AND PROFILE N w C5.3 SEWER LINE C+E PLAN AND PROFILE \cq��/ VICINITY MAP 0) L C6.0 WATER PLAN / s��TF� 1 =1000' U C7.0 IRRIGATION PLAN / q� cf) C7.1 IRRIGATION PROFILES cn bi C7.2 PUMP STATION DETAILS 8 BLOCK 6 x C8.0 STREET LIGHT AND SIGNAGE PLAN w j C8.1 AMITY ROAD STRIPPING PLAN C9.0 ROADWAY DETAILS 7 \ SITE DATA Q o DEVELOPER o 0 C9.1 ROADWAY DETAILS (CONT.) G20 LLC ° ADA COUNTY PARCEL #S1225336510/#S1225347078 PO BOX 93 0 0 cn C9.2 STORM DRAIN DETAILS 6 EAGLE, ID 83616 z / \ SITE AREA = ±17.64 ACRES (208) 336-5355 LAREN®CONGERGROUP.COM o o / 14 ` PROPOSED LAND USE ZONE: R-8 _ 5 \ \ NUMBER AREA % o > o _ CIVIL ENGINEER o a- CORINNE GRAHAM, PE r Z LEGEND / 12 RESIDENTIAL LOTS 57 8.24 AC 46.7% a a w / 4 CIVIL SITE WORKS LLC N g N \ PO BOX 6059 u 0 - - SUBDIVISION BOUNDARY LANDSCAPE COMMON LOTS 10 4.26 AC 24.1% BOISE, ID 83707 w a ~ PUBLIC RIGHT-OF-WAY \ (208) 946-3874 ° CD z 11 ,r PUBLIC RIGHT-OF-WAY N/A 5.14 AC 29.2% CGRAHAM®CSWENGINEERING.COM o o cn - ROAD CENTERLINE 13 y 3 \ < z LOT LINE / BLOCK 5 °�� TOTAL 67 ±1 7.64 AC 1 00% Q O 3 LOT NUMBER 10 2 SURVEYOR o CURB AND GUTTER \ JEFF BEAGLEY, PLS o v 8"SS> SEWER MAIN SAWTOOTH LAND SURVEYING LLC z BLOCK 6 Lu > N 0 8"W WATER MAIN 9 1 2030 S.EMMETT, ID 8361 AVE. TT, ID 83617 STORM DRAIN PIPE 1 (208) 398-8104 <12"SD DESIGNED: C. GRAHAM O <12"GIRR GRAVITY IRRIGATION PIPE \ ��J�, 8 \ � DRAWN: L. HAASE w PRESSURE IRRIGATION MAIN CHECKED: C. GRAHAM � 6"PI � 2 w FIRE HYDRANT I 7 �� 7 3 APPROVED: C. GRAHAM SINGLE WATER METER/SERVICE O 3 v DOUBLE WATER METER/SERVICE \ 6 BLOCK 7 \ \ PREPARED FOR: B.O. - 0 io 2" BLOW-OFF ASSEMBLY BLOCK 3 W G20 LLC D_ ® GATE VALVE 3 a w ° BLOCK 4 4 PO BOX 593 Ti A4 .1►. ti ►� WATER FITTINGS ` \ EAGLE, I D 83616 Q PRESSURE IRRIGATION SERVICE I 2 < I 1 2 3 4 5 6 I 5 1 2 \ \ LK/NS LgTER," ci "" GRAVITY IRRIGATION MANHOLE BLOCK 5 _ J Qs SEWER MANHOLE - cn ® CURB INLET so STORM DRAIN MANHOLE I W.JASPER STREET - - - - - - o o SAND AND GREASE TRAP I W.JASPER STREET _ V J MONITORING WELL } BLOCK 1 i i STORM DRAIN SEEPAGE BED z O O i i 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2Lu 2 3 4 5 6 7 8 9 10 11 Z sa BARRICADES STREET SIGNS I BLOCK 2 BLOCK 2 1 1 }� T LL BLOCK 1 z Z Ld STREET LIGHT � ul - J WO Q D_ y3o�� PROPOSED MAJOR CONTOUR (5') W PROPOSED MINOR CONTOUR (1') W.AMITY ROAD EXISTING MAJOR CONTOUR (5') - - - - - - - - - - - - - - - - - - - - - - - - - - W. AMITY ROAD - - Q LZ (� w EXISTING MINOR CONTOUR (1') W W 2.00% DRAINAGE ARROW WITH PERCENT SLOPE z U IDAHO POWER INFORMATION c Q NOTICE TO CONTRACTORS PROJECT CONTACT: JAMES NEYLAN z _j (208) 336-5355 EXT. 2 CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED JAMESCa?CONGERGROUP.COM 0 CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME FUTURE PHASES w SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; cn THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED PHASE 2 18.55 ACRES 65 LOTS J ACHD CERTIFICATE OF COMPLIANCE PHASE 3 14.08 ACRES 47 LOTS TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO PHASE 4 7.17 ACRES 35 LOTS DEFEND, INDEMNIFY AND HOLD THE ADA COUNTY HIGHWAY DISTRICT, THE CITY OF PHASE 5 7.69 ACRES 46 LOTS MERIDIAN, AND THE DESIGN CONSULTANT HARMLESS FROM ANY AND ALL LIABILITY, REAL THE ENGINEER OF RECORD CERTIFIES THAT THE PLANS ARE o OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT. PREPARED IN SUBSTANTIAL CONFORMANCE WITH ACHD POLICY AND - < STANDARDS IN PLACE AT THE TIME OF PREPARATION. THE ❑� ❑� v~i CSW PROJECT NO. 19022 = ENGINEER ACKNOWLEDGES THAT ACHD ASSUMES NO LIABILITY FOR PRESSURE IRRIGATION PUMP STATION (2) 15 HP PUMPS < DRAWING DATE 04/10/2024 UNAUTHORIZED CHANGES OR USES: THE DESIGN CONSULTANT PREPARING THESE PLANS ERRORS OR DEFICIENCIES IN THE DESIGN. ALL VARIANCES FROM (1) 5 HP PUMP p WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES ACHD POLICY SHALL BE APPROVED IN WRITING. THE FOLLOWING 3-PHASE 640V a o OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING AND MUST BE VARIANCES, LISTED BY DATE AND SHORT DESCRIPTION, WERE LD- RSUB-2024-0006 APPROVED BY THE PREPARER OF THESE PLANS. APPROVED FOR THIS PROJECT: NONE. SERVICE POLE REMOVAL REQUIRED. SEE SHEET C2.0. >_ Como u