Loading...
HomeMy WebLinkAboutMillwood Subdivision FP-2023-0011 Final Order BEFORE THE MERIDIAN CITY COUNCIL HEARING DATE: MAY 14, 2024 ORDER APPROVAL DATE: MAY 28, 2024 IN THE MATTER OF THE ) REQUEST FOR FINAL PLAT ) CONSISTING OF 17 BUILDING ) CASE NO. FP-2023-0011 LOTS AND THREE (3) COMMON ) LOTS ON 4.11 ACRES OF LAND IN ) ORDER OF CONDITIONAL THE R-8 ZONING DISTRICT FOR ) APPROVAL OF FINAL PLAT MILLWOOD SUBDIVISION. ) BY: EPIC DEVELOPMENT ) APPLICANT ) This matter coming before the City Council on May 14, 2024 for final plat approval pursuant to Unified Development Code (UDC) 11-6B-3 and the Council finding that the Administrative Review is complete by the Planning and Development Services Divisions of the Community Development Department, to the Mayor and Council, and the Council having considered the requirements of the preliminary plat, the Council takes the following action: IT IS HEREBY ORDERED THAT: 1. The Final Plat of"PLAT OF MILLWOOD SUBDIVISION, A PARCEL OF LAND LYING IN THE NW 1/4 OF SECTION 29, TOWNSHIP 3 NORTH, RANGE 1 EAST, BOISE MERIDIAN, ADA COUNTY, IDAHO, 2023, HANDWRITTEN DATE: 5/3/24,by ERIC HOWARD, PLS, SHEET 1 OF 3,"is ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR MILLWOOD SUBDIVISION FP-2023-0011 Page 1 of 3 conditionally approved subject to those conditions of Staff as set forth in the staff report to the Mayor and City Council from the Planning and Development Services divisions of the Community Development Department dated May 14, 2024, a true and correct copy of which is attached hereto marked"Exhibit A" and by this reference incorporated herein. 2. The final plat upon which there is contained the certification and signature of the City Clerk and the City Engineer verifying that the plat meets the City's requirements shall be signed only at such time as: 2.1 The plat dimensions are approved by the City Engineer; and 2.2 The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash surety has been issued guaranteeing the completion of off-site and required on-site improvements. NOTICE OF FINAL ACTION AND RIGHT TO REGULATORY TAKINGS ANALYSIS The Applicant is hereby notified that pursuant to Idaho Code § 67-8003, the Owner may request a regulatory taking analysis. Such request must be in writing, and must be filed with the City Clerk not more than twenty-eight(28) days after the final decision concerning the matter at issue. A request for a regulatory takings analysis will toll the time period within which a Petition for Judicial Review may be filed. Please take notice that this is a final action of the governing body of the City of Meridian,pursuant to Idaho Code § 67-6521. An affected person being a person who has an ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR MILLWOOD SUBDIVISION FP-2023-0011 Page 2 of 3 interest in real property which may be adversely affected by this decision may, within twenty- eight(28) days after the date of this decision and order, seek a judicial review pursuant to Idaho Code§ 67-52. By action of the City Council at its regular meeting held on the 28th day of May , 2024. By: Robert E. Simison 5-28-2024 Mayor, City of Meridian Attest: Chris Johnson 5-28-2024 City Clerk Copy served upon the Applicant,Planning and Development Services Divisions of the Community Development Department and City Attorney. By: Dated: 5-28-2024 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR MILLWOOD SUBDIVISION FP-2023-0011 Page 3 of 3 EXHIBIT A STAFF REPORTC�WE COMMUNITY N -- COMMUNITY DEVELOPMENT DEPARTMENT DATE: 5/14/2024 Legend _ 0 TO: City Council Project Location FROM: Sonya Allen,Associate Planner ` I 208-884-5533 SUBJECT: Millwood Subdivision e FP-2023-0011 PROPERTY LOCATION -AL : 1975 E.Victory Rd., in the NW 1/4 of J Section 29,T.3)., R.IE. (Parcel ® �� ®® 13 #S 1129223095 ® (� I. PROJECT DESCRIPTION Final plat consisting of 17 building lots and three(3) common lots on 4.11-acres of land in the R-8 zoning district. 11. APPLICANT INFORMATION A. Applicant Truman Mathews,Epic Development— 1831 E. Overland Rd.,Meridian, ID 83642 B. Owner: Ted Burke,EDM Partners—2185 East 3300 South, Salt Lake City, UT 84109 C. Representative: Same as Applicant III. STAFF ANALYSIS Staff has reviewed the proposed final plat for substantial compliance with the preliminary plat(H- 2022-0089). Although the lot configuration has changed slightly and the turnaround at the south end of the site changed from a cul-de-sac to a hammerhead,the proposed final plat depicts the same amount of building lots and a greater amount of common open space(from 0.27 to 0.55-acre)as the approved preliminary plat. Therefore, Staff finds the proposed final plat is in substantial compliance with the approved preliminary plat as required by UDC 11-6B-3C. Pagel An emergency access license agreement(Inst. #2024-011423)was approved that grants emergency access only for the development from E.Victory Rd. across the DeChambeau property(Parcel #S 1129120742). Therefore, fire sprinklers are not required for any of the proposed units. Right-of-way for E. Springloyd St. is proposed to be dedicated to the east property line to allow for future construction of a stub street if necessary in the future; however,however,no improvements are required east of S. Tamayo Pl. at this time per the ACHD staff report(condition#2). IV. DECISION A. Staff: Staff recommends approval of the proposed final plat with the conditions of approval in Section VII of this report. Page 2 V. EXHIBITS A. Approved Preliminary Plat(dated: 2/10/23) Millwood Subdivision Apmcd otlmdl­mde NW 1/4 ofi6xNW 1/9 ot5eavau29,Towmhp 3Nmy Rao�e IPa46x:..AlenAaq A�Umi9�Sdxho. 1 ILL ,\ I I9I5C4, Ro.4 azHm.n,mswa2 \"t��r ... `� $ III I .Va•.ti.�... � �® � \� ICI - •R.rox L. '1ENT I� �6 �..• was �� `ram, +y��t`. I —� o.,..co.... _ ..,�. II I mom.. �€ mnu,�uninmmummv m„x�mut.� Millwood ; � Subdivision n It CMV5f1EENGINEER C-� Page 3 Revised(dated: 5/3/2024) Millwood Subdivision w e�a or„m Nl^a m m.rvw Ua m.m rvm�/a�s.�a®zs,rommmr�iv�n, R®s=ice,.. mwcmers w.m grim) I � a IIII EPIC ELI pp nail W_. I L a I ---- Ti 4t -xau..ue�e �,.. I.. _, , Ep�o��� Subdivision ra.mc.un... �� -p 13 Heli®nn9 Plat --. Y 6 � mu'�v,�urmu �i I n'wam acusarxn umxlleclux[ocvsrenus �'- � ..... _ III _ E .wwure..0 I n.ecm.ewn ,.mu�n.��m. Nay 3. mwa„mrl�. V�1 Page 4 B. Final Plat(dated: 5/3/2024) a r •, a � •• gg�-�Cj - _ G 5 G G G c � 9 0 m m H W v 3 � S 8 9 & � R C � & ;4: m�9€�A��� m b „ 9s g' e I$I s"�a.v o ' r £ v m �, E SPRINEl STREET $sae• r- sl m00 o e i WE L $I L_Rea•"s _erg —mg�er_wm•— � i=Q �y --- a v E sv.r;.J L-_560'36'S5•W 1]5.26-_' 1 C'�']2 19 n u O r ———— 3 rn <�m G ® $ --------------,' n m L NW 55'E BGST_J L_____Rgg•.b•gE ,y,.n____ =m D�A g o N - I0sf„ qt can I I L sao•sa'ss'w saeo•.J 1 3 C ————— — —"�1—I ----- !SI ® 18 I I I L L ses ¢f'w 5aea•.J p. bl I L m 7c c0 Z. [A Page 5 C. Landscape Plan(dated: 5/1/24) LANDSCAPE REQUIREMENTS LANDSCAPE PLAN-OVERALL: STACr ROCK —D— To! L101—E"AI-I LANDSCAPE MATERIALS LEGEND ---- -------- ji F -10 TREE PROTECTION NDWS In c" L --- LIWI DSC PEPLANAREA2 L F L I I I.- JP oll1 +1 T L-——————————- Page 6 D. Common Driveway Exhibit(dated: 5/3/2024) f V � � a� _w Q 5 t � � �. €•� e b o� � �1 s o hh��II 9�pl�pp�q� Hu a r 9�q p e� I ee `I z w I I I I C j1 I I - 4) i I I�� —A TT�<� - - - - - - - - - -._ _._�._ 'l0-1- r tea Page 7 LI 1,21 11& aE � EL e RHQ uN p W -------------- FF v, - - - - - - - - - - - - - - - - - - - - C j AkMeO x�i V p� w a� g¢ g Qss o Min 4 � �a 4 Page 8 E. Open Space Exhibit (dated: 5/3/2024) • �� �lxW "EEO 11111H .MM Pi 0 z ! MAN €a�qa��� e� z `��� gge U ti c ------- —————————————— Al — NNI _ - i 7'°`'a I � 1 s° � F -I Fr- I I F 7 p kl � L � LL _ JL_ IL IL _ IL— a°� Page 9 F. Emergency Access Exhibit(Approved by Fire Dept.) -------- ---------- Q�S88+9'W45"E E.VICTORY ROAD 30.0V \ qv o � r y e I � I ' I y , lid a I o i iOf p -- I.L Page 10 VI. CITY/AGENCY COMMENTS & CONDITIONS A. Planning Division Site Specific Conditions: 1. Applicant shall comply with all previous conditions of approval associated with this development [H-2022-0089,DA Inst. #2023-0238481. 2. The applicant shall obtain the City Engineer's signature on the subject final plat within two years of the date of approval of the preliminary plat(by April 18,2025), or apply for a time extension,in accord with UDC I I-6B-7. 3. Prior to submittal for the City Engineer's signature,have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. The final plat, signed and stamped by Eric Howard on 5/3/24, included in Section V.B, shall be revised prior to submittal of the final plat for City Engineer signature,as follows: a. Update the year of platting in the situate statement. b. A perpetual ingress/egress is required for the common driveways on Lot 1,Block I and Lot 6,Block 2, either by a recorded easement or as a note on a recorded final plat. The easement or plat note shall include a requirement for maintenance of a paved surface capable of supporting fire vehicles and equipment in accord with UDC 11-6C-3D.8.Plat note#7 could be amended to include this information. 5. The landscape plan prepared by Stack Rock Group, dated 5/1/24 included in Section V.C, shall be revised prior to submittal of the final plat for City Engineer signature,as follows: a. Depict landscaping(i.e. shrubs, lawn or other vegetative groundcover)within the 5- foot wide strips along the common driveways on Lot 1,Block 1 and Lot 6, Block 2 in accord with UDC 11-6C-3D.5. Also, depict fencing along the common driveways if proposed. b. Depict 5-foot wide landscape strips on each side of the 10-foot wide multi-use pathway on Lot 5, Block 1, landscaped per the standards listed in UDC 11-3B-12C per preliminary plat condition#3c. c. Include mitigation calculations on the plan for existing trees that are proposed to be removed in accord with the standards listed in UDC 11-3B-1OC.5. d. Include calculations that demonstrate compliance with the pathway landscape standards listed in UDC 11-3B-12C. e. Include calculations that demonstrate compliance with the landscape standards for common open space areas listed in UDC 11-3G-5B.3. f. Include a detail for the children's play equipment proposed for the tot lot. g. Remove the perimeter fencing along the west boundary of the common lot at the southwest corner of the development where it adjoins common area in Teakwood Subdivision ifthe Applicant is able to coordinate with the adjacent developer to arrange no fencing on that development in the same area. h. Depict a 6-foot tall open vision fence(wrought iron) fence between the pathway and the lateral for public safety in accord with preliminary plat condition#3j. Page 11 i. Depict landscaping within the storm drainage area on Lot 1,Block 2 in accord with the standards listed in UDC 11-3B-11C; also depict slopes less than or equal to 3:1 for accessibility and maintenance. j. Depict a minimum 5-foot wide landscaped strip between the shared property line of Lots 10& 11, Block 2 and the pathway and depict landscaping along the pathway per the standards listed in UDC 11-3B-12C. 6. The existing home proposed to remain on Lot 5, Block 2 shall connect to City water and sewer service within 60 days of it becoming available and disconnect from private service, as set forth in MCC 9-1-4 and 9-4-8 per requirement of the development agreement. 7. The address for the existing home on Lot 5, Block 2 is required to change since access will no longer be provided from Victory Rd. The Applicant should coordinate the new address with the Land Development Dept. (kiohnstonkmeridiancity.org). 8. Construction traffic for the re-development of this property shall access the site via the future extension of E. Springloyd St.; access via the existing easement from E. Victory Rd. is prohibited per requirement of the development agreement. 9. The homes constructed on Lots 7-9,Block 2 shall be restricted to single story only per requirement of the development agreement. 10. The Developer shall install a"no trespassing"sign at the end of the multi-use pathway along the east boundary of the site that stubs to the DeChambeau property(parcel #S 1129120742)per requirement of the development agreement. 11. The common driveways on Lot 1, Block 1 and Lot 6, Block 2 shall comply with the standards listed in UDC 11-6C-3D and the exhibits in Section V.D. The driveways shall be paved with a surface with the capability of supporting fire vehicles and equipment. 12. Prior to the City Engineer's signature on the final plat, all existing structures that do not conform to the setbacks of the R-8 zoning district shall be removed. 13. Access for the existing home on Lot 5,Block 2 shall be provided solely from internal local streets;the existing driveway via E.Victory Rd. shall be used solely for emergency access. 14. Submit a 14-foot wide public pedestrian easement for the multi-use pathway required along the northern portion of the eastern boundary of the site prior to City Engineer signature on the final plat. 15. The Applicant shall coordinate with the Parks Department to determine if the existing bridge can be used as a pedestrian crossing. The bridge across the Eight Mile Lateral shall be widened or a separate pedestrian bridge constructed to accommodate the 10-foot wide multi-use pathway as required by the Park's Dept. with the NMID's consent. 16. "No Parking Fire Lane" signs shall be installed per ACHD standards along the common driveways per requirement of the Fire Dept. The CC&R's shall include restrictions for parking along common driveways. 17. Staff s failure to cite specific ordinance provisions or conditions from the preliminary plat and/or development agreement does not relieve the Applicant of responsibility for compliance. B. Public Works https:llweblink.meridiancily.orglWeUink/DocView.aspx?id=342423&dbid=0&redo=Meridi anQU&cr--I Page 12 C. Idaho Transportation Department(ITD) https:llweblink.meridianciU.orglWebLink/DocView.aspx?id=340114&dbid=0&repo=Meridi anCiU&cry I D. Nampa Meridian Irrigation District(NMID) https:llweblink.meridiancily.orglWebLinkIDocView.aspx?id=342124&dbid=0&repo=Meridi 9nC E. Department of Environmental Quality(DEQ) https:llweblink.meridiancily.orglWebLinkIDocView.aspx?id=33801 S&dbid=0&repo=Meridi 9nC Page 13