Loading...
HomeMy WebLinkAboutCC - Engineer Statement ENGINEERING P. C . Civil Engineering * Project Management DATE: March 8, 2024 TO: City of Meridian 33 E. Broadway Ave Ste 102 Meridian, ID 83642 RE: Horse Meadows Subdivision To whom it may concern: Based on the geotechnical engineering report, all roads in Horse Meadows Subdivision have been designed with the centerline of the road at least 3 feet above seasonal high groundwater. If additional information is needed, please do not hesitate to call me. Respectfully submitted, NAL FTELKS N��y 2356 03-00�`o `'F,pFgrf of�oaS�� MYS. �O Jeremy S. Foster, P.E. CK Engineering, P.C. CK Engineering 1300 E.State St Suite 102 Eagle,ID 83616 208.639.1992 Office chad@ck-engineers.com