Loading...
HomeMy WebLinkAboutCC - Staff Report for 5-14 STAFF REPORT C� E IDIAN -- COMMUNITY DEVELOPMENT DEPARTMENT DATE: 5/14/2024 legend _ 93EB 0 TO: City Council Project Location FROM: Sonya Allen,Associate Planner 208-884-5533 f" SUBJECT: Millwood Subdivision FP-2023-0011 PROPERTY LOCATION: 1975 E.Victory Rd., in the NW 1/4 of WWffl Section 29 T.3N. R.IE. (Parcel C g #S1129223095) t 1 � i kdE I. PROJECT DESCRIPTION Final plat consisting of 17 building lots and three(3)common lots on 4.11-acres of land in the R-8 zoning district. II. APPLICANT INFORMATION A. Applicant Truman Mathews,Epic Development— 1831 E. Overland Rd.,Meridian, ID 83642 B. Owner: Ted Burke,EDM Partners—2185 East 3300 South, Salt Lake City, UT 84109 C. Representative: Same as Applicant III. STAFF ANALYSIS Staff has reviewed the proposed final plat for substantial compliance with the preliminary plat(H- 2022-0089). Although the lot configuration has changed slightly and the turnaround at the south end of the site changed from a cul-de-sac to a hammerhead,the proposed final plat depicts the same amount of building lots and a greater amount of common open space(from 0.27 to 0.55-acre)as the approved preliminary plat. Therefore, Staff finds the proposed final plat is in substantial compliance with the approved preliminary plat as required by UDC 11-6B-3C. Page 1 An emergency access license agreement(Inst. #2024-011423)was approved that grants emergency access only for the development from E. Victory Rd. across the DeChambeau property(Parcel #S 1129120742). Therefore, fire sprinklers are not required for any of the proposed units. Right-of-way for E. Springloyd St. is proposed to be dedicated to the east property line to allow for future construction of a stub street if necessary in the future; however,however,no improvements are required east of S. Tamayo Pl. at this time per the ACHD staff report(condition#2). IV. DECISION A. Staff: Staff recommends approval of the proposed final plat with the conditions of approval in Section VII of this report. Page 2 V. EXHIBITS A. Approved Preliminary Plat(dated: 2/10/23) Millwood Subdivision Apmcd 1/4 ofi6.NW 1/9 ot5exvau29,Towmhp 3Nmy Rye IPay R.:.e AlenAaq A�Umi9�Sd.h.. 1 L9ISC4� rvRo�A.Tfendi.%IDS'16a2 �6 li Millwood Subdivision m _ .*nxoaao acm.•ccr cy C-1 Page 3 Revised(dated: 5/3/2024) Millwood Subdivision p aor,.m Moaem. / / zs,rommmp -_�, was it I . s I OHM FFFF LIU 4t GIVIUSITE ENGINEER I �I Subdivi ion a41 y -1 C Page 4 B. Final Plat(dated: 5/3/2024) a r •, a � u gg�-�Cj - _ G 5 G G G c � 9 0 m m H W v 3 � S 8 9 & � R C � MCI u { LiNP W WE F IR m b „ 9s g' e ICI .s"�a.v -------------se ss+x�ee n' N E SPRIH[lA1V STREET s gTam IN- � $sae•se'sYr au.m- r7- WE r � �a slImoeL_Reo•"s erg Q J N V ^tl WE sv.r;.J L-_560'36'S5•W 1]5.26-_' 1 C'�']2 W n u O r ———— 3 rn <�m G ® S L ry $ --------------NW srBGT_J m L_____Rgg•.b•gE , ___ x D�A g o N - I an 0sf„ qt c I I L sao•sa'ss'w saeo•.J 1 3 C ————— — —"�1—I1� !S I ® I$ I I I x L ses_¢¢-w saea•.J i bl I L -m IST m I7c go' gmm Noy A V Page 5 C. Landscape Plan(dated: 5/l/24) LANDSCAPE REQUIREMENTS LANDSCAPE PLAN-OVERALL: STACC ROCK PLANT­D­ F F L101—E—NA-1 LANDSCAPE MATERIALS LEGEND ---- -------- -------- F L OL TREE PROTECTION N0WS T In— L C' L ++_ L102 LANDSCAPE PLANAREA2 L F L - p o ­E L--—————————— —— — L100 Page 6 D. Common Driveway Exhibit(dated: 5/3/2024) f V � � a� _w 5 t �. �� g•i a s o m hh��II �9 �19 ��� g �Wj� B z, 3gag9 4a�$ a 3 MIRIII9,1111g1 2 W • V!!' '� �Z Oa4? 9d� G�egG� 'e €@884az r 9�q p e� I @ ee w I I C4 j1 I I - TT�<� r a 11 Page 7 Yy 9 1,21 JI& a� k yg 9 +EL uN -------------- FF pp� i_ s� g� - - i - - - — — - - — — — — — — — — — — - - - — — — — C 10 j AkMeO x�i V p� w a� g¢ g 4 � �a 4 Page 8 E. Open Space Exhibit (dated: 5/3/2024) a0. hFM Uhfl F 0 z V B e� IN��a��� 6 c ------- —————————————— — _ - - - - i air L LL L- t ELL � L JL _ JL _ IL IL — IL -1 ----J ' I, Page 9 F. Emergency Access Exhibit(Approved by Fire Dept.) -------- ---------- Q�5�8+9�5O'95'E E.VICTORY RWD ff� 3D.00' � II�II l Li \ ov � II Of p atiis mg � go -- ? a�rN Page 10 VI. CITY/AGENCY COMMENTS & CONDITIONS A. Planning Division Site Specific Conditions: 1. Applicant shall comply with all previous conditions of approval associated with this development [H-2022-0089,DA Inst. #2023-0238481. 2. The applicant shall obtain the City Engineer's signature on the subject final plat within two years of the date of approval of the preliminary plat(by April 18,2025), or apply for a time extension,in accord with UDC 11-6B-7. 3. Prior to submittal for the City Engineer's signature,have the Certificate of Owners and the accompanying acknowledgement signed and notarized. 4. The final plat, signed and stamped by Eric Howard on 5/3/24, included in Section V.B, shall be revised prior to submittal of the final plat for City Engineer signature, as follows: a. Update the year of platting in the situate statement. b. A perpetual ingress/egress is required for the common driveways on Lot 1,Block 1 and Lot 6,Block 2, either by a recorded easement or as a note on a recorded final plat. The easement or plat note shall include a requirement for maintenance of a paved surface capable of supporting fire vehicles and equipment in accord with UDC 11-6C-3D.8.Plat note#7 could be amended to include this information. 5. The landscape plan prepared by Stack Rock Group, dated 5/1/24 included in Section V.C, shall be revised prior to submittal of the final plat for City Engineer signature, as follows: a. Depict landscaping(i.e. shrubs, lawn or other vegetative groundcover)within the 5- foot wide strips along the common driveways on Lot 1,Block I and Lot 6,Block 2 in accord with UDC 11-6C-3D.5. Also, depict fencing along the common driveways if proposed. b. Depict 5-foot wide landscape strips on each side of the 10-foot wide multi-use pathway on Lot 5,Block 1, landscaped per the standards listed in UDC 11-3B-12C per preliminary plat condition#3c. c. Include mitigation calculations on the plan for existing trees that are proposed to be removed in accord with the standards listed in UDC 11-3B-IOCS. d. Include calculations that demonstrate compliance with the pathway landscape standards listed in UDC 11-3B-12C. e. Include calculations that demonstrate compliance with the landscape standards for common open space areas listed in UDC 11-3G-5B.3. f. Include a detail for the children's play equipment proposed for the tot lot. g. Remove the perimeter fencing along the west boundary of the common lot at the southwest corner of the development where it adjoins common area in Teakwood Subdivision if the Applicant is able to coordinate with the adjacent developer to arrange no fencing on that development in the same area. h. Depict a 6-foot tall open vision fence(wrought iron) fence between the pathway and the lateral for public safety in accord with preliminary plat condition#3j. Page 11 i. Depict landscaping within the storm drainage area on Lot 1,Block 2 in accord with the standards listed in UDC 11-3B-I IC; also depict slopes less than or equal to 3:1 for accessibility and maintenance. j. Depict a minimum 5-foot wide landscaped strip between the shared property line of Lots 10& 11,Block 2 and the pathway and depict landscaping along the pathway per the standards listed in UDC 11-3B-12C. 6. The existing home proposed to remain on Lot 5, Block 2 shall connect to City water and sewer service within 60 days of it becoming available and disconnect from private service, as set forth in MCC 9-1-4 and 9-4-8 per requirement of the development agreement. 7. The address for the existing home on Lot 5,Block 2 is required to change since access will no longer be provided from Victory Rd. The Applicant should coordinate the new address with the Land Development Dept. (kiohnstonkmeridiancit�org). 8. Construction traffic for the re-development of this property shall access the site via the future extension of E. Springloyd St.; access via the existing easement from E.Victory Rd. is prohibited per requirement of the development agreement. 9. The homes constructed on Lots 7-9,Block 2 shall be restricted to single story only per requirement of the development agreement. 10. The Developer shall install a"no trespassing" sign at the end of the multi-use pathway along the east boundary of the site that stubs to the DeChambeau property(parcel #S 1129120742)per requirement of the development agreement. 11. The common driveways on Lot 1, Block 1 and Lot 6, Block 2 shall comply with the standards listed in UDC 11-6C-3D and the exhibits in Section V.D. The driveways shall be paved with a surface with the capability of supporting fire vehicles and equipment. 12. Prior to the City Engineer's signature on the final plat, all existing structures that do not conform to the setbacks of the R-8 zoning district shall be removed. 13. Access for the existing home on Lot 5,Block 2 shall be provided solely from internal local streets;the existing driveway via E.Victory Rd. shall be used solely for emergency access. 14. Submit a 14-foot wide public pedestrian easement for the multi-use pathway required along the northern portion of the eastern boundary of the site prior to City Engineer signature on the final plat. 15. The Applicant shall coordinate with the Parks Department to determine if the existing bridge can be used as a pedestrian crossing. The bridge across the Eight Mile Lateral shall be widened or a separate pedestrian bridge constructed to accommodate the 10-foot wide multi-use pathway as required by the Park's Dept.with the NMID's consent. 16. "No Parking Fire Lane" signs shall be installed per ACHD standards along the common driveways per requirement of the Fire Dept. The CC&R's shall include restrictions for parking along common driveways. 17. Staff's failure to cite specific ordinance provisions or conditions from the preliminary plat and/or development agreement does not relieve the Applicant of responsibility for compliance. B. Public Works https:llweblink.meridiancioy.or lWebLink/Doc View.aspx?id=342423&dbid=0&repo=Meridi anCity&cr=1 Page 12 C. Idaho Transportation Department(ITD) https://weblink.meridianciU.orglWebLinkIDocView.aspx?id=340114&dbid=0&repo=Meridi anCiN&ct--I D. Nampa Meridian Irrigation District(NMID) https://weblink.meridiancity.oty WebLink/Doc View.aspx?id=3 4212 4&db i d=0&rep o=Meridi anCi E. Department of Environmental Quality(DEQ) https://weblink.meridiancity.orzlWebLinkIDocView.aWx?id=33801 S&dbid=0&repo=Meridi anCi Page 13