Loading...
HomeMy WebLinkAboutCC - Engineer Statement km E N G I N E E R I N G October 26,2022 Project No.22-144 City of Meridian 33 E Broadway Ave.,Ste.210 Meridian, Idaho 83642 RE: S.Benchmark Way and W.Cobalt Dr. Roadway Project Meridian,Idaho To Whom It May Concern: Please accept this letter as certification that the centerline elevations of the proposed streets for the S. Benchmark Way and W. Cobalt Dr. Roadway Project are designed a minimum of three (3) feet above the seasonal high ground water elevation. The groundwater monitoring report, "2021 ground water monitoring final report—Wayfinder project",prepared by Natural Resource Solutions(NRS)and dated November 12,2021, and 2022 groundwater data provided by NRS was used to determine the approximate groundwater elevations relative to the street centerline elevations. Please feel free to contact me at 208.639.6939 should you have questions or require any additional information. Sincerely, KM Engineering,LLP �Ss�p N A L f NG � E F Digitally signed by Lachlin C Kinsella,P.E. 16860 Date:2022.10.26 s� 10/26/22 0 14:59:06-06'00' OF /N C. Y, Lachlin Kinsella, P.E. Project Manger 5725 North Discovery Way 0 Boise,Idaho 83713 • 208.639.6939 • kmengllp.com