26 April 2024
City of Meridian
City Clerk's Office
33 E. Broadway Avenue,
Meridian, Idaho 83642
RE: Biltmore Estates Subdivision No. 5
S. of W. Victory Rd. & S Kentucky Way
New York Irrigation District
Boise -Kona Irrigation District
Sundell Lateral 49+70
Sec. 25, T3N, Rl W, B.M.
Sonya Allen, Planner:
FP-2024-0007
NY-109-001-01
BK-88
OPERATING AGENCY FOR 167,000
ACRES FOR THE FOLLOWING
IRRIGATION DISTRICTS
NAMPA-MERIDIAN DISTRICT
BOISE-KUNA DISTRICT
WILDER DISTRICT
NEW YORK DISTRICT
BIG BEND DISTRICT
TEL:(208) 344-114t
FAX:(208)344A437
The United States' Sundell Lateral lies within the boundary of the above -mentioned location. The
easement for this lateral is held in the name of the United States through the Bureau of Reclamation
under the authority of the Act of August 30, 1890. (26 Stat. 391; 43 U.S.C. 945)
The Boise Project Board of Control is contracted to operate and maintain this lateral. We assert
this federal easement 21 feet Northeast and 15 feet Southwest of the lateral's centerline. Whereas
this area is for the operation and maintenance of our facility, no activity should hinder our ability
to do so.
Boise Project reserves the right to have changes made if our easements are affected in any way
even during the construction phase of this project.
The Boise Project does not approve landscaping other than gravel within its easements, as this will
certainly increase our cost of maintenance. All easements must remain a flat drivable surface. No
variances will be granted.
Any fencing, gates and pathways, as may be required, must be constructed off of any Boise Project
Easements. No variances will be granted.
Parking lots, curbing, light poles, signs, etc. and the placing of asphalt and/or cement over Proi ect
Facility easements must be located outside of these easements.
Utilities planning to cross any project facility must do so in accordance with the master policies
now held between the Bureau of Reclamation and most of the utilities. In any case no work shall
take place within the easement before proper crossing agreements have been secured through both
the Bureau of Reclamation and the Boise Project Board of Control.
Storm Drainage and/or Street Runoff must be retained on site.
Per Idaho State Statutes, title 42, all local irrigation/drainage ditches that cross this property, in
order to serve neighboring properties, must remain unobstructed and protected by an appropriate
easement by the land owner, developer and contractors.
Boise Proiect is also under the understanding that the Home Owners Association will o�yn
and operate any pump station that is associated with this phase.
This development is subject to Idaho Code 31-3805, in accordance, this office is requesting afull-
size hard copy of tall plans and must include irrigation and drainage plans.
If you have any fiirther questions or comments
contact me at (208) 344-1141.
Since• ,
Thomas Ritthaler
Assistant Project Manager, BPBC