HomeMy WebLinkAboutCC - Staff Report for 5-7 STAFF REPORT C�I
w IDIAN --
COMMUNITY DEVELOPMENT DEPARTMENT .►A H O
HEARING 5/7/2024 Legend t
DATE: .
Project LocationTO: Mayor&City Council
FROM: Linda Ritter,Associate Planner __
208-884-5533 - -
SUBJECT: FP-2024-0005
Alamar Subdivision No. 2 FP AL—V
11
LOCATION: 4380 W. Franklin Road,approximately ' ' -
1/4 east of N. Black Cat on the north side '
of Franklin,in the SE 1/4 of the SW 1/4
of Section 10,Township 3N, Range 1 W.
I. PROJECT DESCRIPTION
Final Plat request for Phase 2 development to include 1 single-family detached building lot, 32 single-
family attached building lots, 2 common lots and 2 common driveway lots on approximately 1.91
acres of land in the TN-R zoning district,by Jeff Wrede,Noble Rock Development Inc.
II. APPLICANT INFORMATION
A. Owner/Applicant:
Jeff Wrede,Noble Rock Development Inc— 13601 W.McMillan Road, Ste. 102-162, Meridian,
ID 83642
B. Representative:
Same as Applicant/Owner
III. STAFF ANALYSIS
Staff has reviewed the proposed final plat for substantial compliance with the approved preliminary
plat(H-2022-0005) as required by UDC 11-6B-3C.2. The submitted plat includes the same number of
buildable lots permitted for phase 2 as outlined in the conditions of approval for the preliminary plat.
parkways,temporary access to Franklin, and the correct amount of common open space as previously
approved for this phase.
Staff finds the proposed final plat is in substantial compliance with the approved preliminary plat as
required.
Page 1
IV. DECISION
A. Staff-
Staff recommends approval of the proposed final plat with the conditions of approval in Section
VI of this report.
V. EXHIBITS
A. Preliminary Plat(date: 6/1/2022)
PRELIMII\ARY PLAT FOR _ �J
ALAMAR SUBDIVISION
BE V4 OF THE SW IM OF SECTION 10,T.W.RAW.,B.M.
MERIDIAN,ADA COUNTY,IDAHO — PROJEU 6TE
2022
EP
, ... A ,u,.. 4Tcmtrsntnr Y 1�l
0d
L
w
F F-
r
6 —
1 _ Y
F
I Wo
1
a
Page 2
B. Final Plat(date: 3/8/2024)
ly,AT yrOMk'G oP AG
ALA WAR SUBDIVISION NO, 2
W7 LOL'AW V 9W W 1/4 OF 7NE SiY I��OF SFCAfX1 rC
r 7 N4 R f M:du.,AN Cd N OANa
" � r
� I sL`n,mirrne.
null �r I Y i n r� p/
Y9 I j � •xue mh-av nrr
SVAVE}VR'S NAAAA-FI4'E �9}'o'�'e'Yu^^ I I __ i Y. ���ry oa•�-_ �____
X.Y iE[3frarc,o-=,s,n cw
v e v
""" —' I, ' wssM
66 I x n'.rnurc Srnr,[r� j
4 ,1 Lam_-_�.�_ wmrvsx oa�mwrlK
A
6 n xuffx
6auNL.A4Y CURVF ILtTh
SVNVFI"S,PLLC.
w
r3�. ��_ _ _ •�}bWs�iwuECTsV�vu7�Waa�pnGtPUrWuAcUN.oe»v ao.�.e.v
+W3f�f0.]-1�0.0.0 FL4 Pk.ahr-- -
Page 3
C. Landscape Plans(date: 3/28/2024)
rtAIE I HA I
ww!
Mom
Flkn6n➢` .,Y. 3Y�n�bx LpNOnM����0. T.'BB ftA��i1P HnfBB
�rw.r*� _ ,reull.r+r.R..r wun.ws
Page 4
D. Common Drive Exhibit(date: 3/28/2024)
N
�W
r.W
COMMON �A
DRIVEWAY
xl✓ s! .p.p £
iDi 1! j 19S u w!i4
I I 9L9CN 3 I I
Fexu� lm n I EO-0 K u 2R0 �tl
xo I xv xv a�
r --- ---- ---- ----- CDMHDN psi
sv I DRIVEWAY �$«'
6"
s p � I �i I I Rio Sp I
II I
II I I
I rib y
W ATOMIC STREET Ifi$,
m m e �e Ia ae g
G
SCALE. INCH=40 FEET
Page 5
E. Temporary Fire Turnaround(date: 3/15/2024)
4
IF THE EXTENSION R2AD FRU01 THE NEWKIRK ti q
SLBDIVISIUN CaLLECTOR ROAD CAVIATOR ROAD)IS lv
NOT COMPLETED,A TEMPMARY 96' DIAMTTER p Z
7URN-AROLWD VILL RE PROVIDED AS SHIIVN. a U
+' THE SECTIDN OF ROAD CONNECTING TO THE ASCENT y a
I SLBIVISION aN THE EAS7 VRL BE COMPLETED•
*cwurwrx r OQ 4 LJ
ruxr-weaxe
ac•aWrR�e �X
�z
Nr�,
PHASE I a�auADrNG LDTS
II
PHASE II ITS g
�� �• use w■ urs "'��
w� PHA M Fn irFFaee�
imtr
lwy
wa we ur �� h�
wt K dd
wr n
�v nw.R run msoco ----�
A 19®If'Jmld
Ip6 N1i � � � •� �' Y
P AS I w. A
is■ 9 4]
w a ! flp
ASCW
wr u E
yW� H
M RNi ACCM M F�M� W
Page 6
VI. CITY/AGENCY COMMENTS & CONDITIONS
A. Planning Division
Site Specific Conditions:
1. Applicant shall comply with all previous conditions of approval associated with this
development: H-2022-0004 (AZ,PP,DA Inst. #2022-065010).
2. The applicant shall obtain the City Engineer's signature on the final plat by June 21, 2024,
within two(2)years of the date of approval of the preliminary plat findings (June 21,2022),
in accord with UDC 11-6B-7, in order for the preliminary plat to remain valid or a time
extension may be requested.
3. Prior to submittal for the City Engineer's signature,have the Certificate of Owners and the
accompanying acknowledgement signed and notarized.
4. Prior to building permit submittal,Administrative Design Review approval is required for the
single-family attached lots within this phase of development(Lots 18-25,Block 1, &Lots 7-
25,Block 3).
5. The final plat shown in Section V.B,prepared by Engerbritson Land Surveys, stamped on
3/28/24 by Michael R. Engerbritson,is approved with the following conditions to be
completed at the time of Final Plat Signature:
a. Plat note#7: add recorded instrument number.
b. Plat note#12: add recorded instrument number.
6. The submitted landscape plans, as shown in Section V.C,prepared by Rock Solid Civil, dated
8/8/23,is approved as submitted.
7. Staff's failure to cite specific ordinance provisions or conditions from the preliminary plat
and/or development agreement does not relieve the Applicant of responsibility for
compliance.
B. PUBLIC WORKS
https://weblink.meridiancity.org/WebLink/DocView.aspx?id=342872&dbid=0&repo=MeridianCi
t &y cr=1
C. IDAHO DEPARTMENT OF ENVIRONMENTAL QUALITY(DEQ)
https://weblink.meridiancity.org/WebLink/DocView.aspx?id=343055&dbid=0&repo=MeridianCi
iy
D. IDAHO DEPARTMENT OF TRANSPORTATION(ITD)
https://weblink.meridianciiy.org/WebLink/DocView.aspx?id=343171&dbid=0&repo=MeridianCi
ty&ci-1
Page 7