HomeMy WebLinkAbout9/5 Memo from Planning
Project: Mussel Corner
RECEIVED
SEP - 5 2006
City of Meridian
City Clerk Office
Location: NE comer of Victory and Meridian Road
Applications: DA modification
Highlights of Proposed Development: The City required, through a DA, detailed CUP approval for all
future uses in the development in order to evaluate details of each building/phase to ensure that
development met the City's expectations regarding use and design. The applicant is proposing to amend
Section 4 "Uses Permitted by This Agreement" and Section 6 "Conditions Governing Development of
Subject Property". If approved, each building on the subject property will still be required to obtain
Certificate of Zoning Compliance (CZC) approval from the Planning Department prior to construction of
any building, but not necessarily a CUP. To support this request, the applicant has submitted a Master
Site Plan, nine pictures of what the future buildings will look like on this site, and detailed elevations for
the next building within this development.
Current Site Development: 23 acres located on the northeast corner of Victory Road and Meridian Road,
in the C-G (General Retail and Service Commercial) zoning district. There is currently a combination
feed store and gas/convenience station, a landscape nursery, and a sprinkler contractor's business (2M) on
this site. Structures facing Meridian Road are subject to administrative design review.
2M Building and use: The 2M use is housed in an existing metal building that does not conform to the
design standards proposed by the applicant. The applicant is proposing to retain this building (with
limited upgrades) and the use of the building for wholesale warehousing/contractor's yard. The existing
use is not allowed within the C-G district; during the time of annexation, Staff viewed the sprinkler
contractor's business as accessory to the nursery business remaining on the site. Both of the uses were
considered non-conforming.
The applicant proposes to expand the non-conforming wholesale/warehousing/contractor's yard at this
site. Because 2M is an industrial use, staff was very concerned that their building(s) would not fit in with
the character of the area. Staff suggested to the applicant that the only means of expanding the use at this
site might be to construct a flex building that could be used by a single tenant at this time. This way
should 2M ever decide to relocate, the building could be converted to multi~tenant flex space. Although it
appears that the proposed 2M building could be modified to accommodate future users, staff does not
believe that the proposed building looks like a "flex" building as it is a metal-sided building with only one
overhead door.
The proposed changes to the DA are as follows:
Section 4.1 of the recorded DA currently states:
"4.1 The uses allowed pursuant to this Agreement are only those uses allowed under
"City's" Zoning Ordinance codified at Meridian City Code Section 11-7-2 (K) which are
herein specified as follows: a) Construction and development of a commercial subdivision
that includes a combination feed store and gas/convenience station in a proposed C-G
zone. All future uses on proposed lots or parcels within the annexation area shall be
approved through the Conditional Use permit process."
Replace the language noted above with the following:
"4.1 The uses allowed pursuant to this Agreement are only those uses allowed under
"City's" Unified Development Code codified in Table 11-2B-2 and herein
specified as follows:
a) Principally permitted uses on the subject property shall be allowed without
Conditional Use Permit approval, provided all future buildings have: sloped metal
roofs with overhanging eaves that are supported by posts; are oriented toward the
public street (front door facing street); siding visible from a street containing at least a
three-foot tall wainscoting constructed of stone, brick, or other similar materials; that
each building will provide a variety of building materials and colors; and each
building is generally consistent with the nine pictures submitted with MI-06-005, as
determined by the Planning Director. If a future proposed building is not consistent
with the above-mentioned provisions, then the building and use shall be required to
obtain Conditional Use Permit approval prior to construction and operation.
b) Future construction on the subject site shall be generally consistent with the Master
Site Plan submitted with MI-06-005, as determined by the Planning Director. All
buildings with frontage on Victory Road or Meridian Road, will be limited to a
maximum 11,000 square foot building footprint and no building on this site shall have
a building footprint larger than 20,000 square feet. If a future proposed building is not
consistent with the Master Site Plan, then the building shall be required to obtain
Conditional Use Permit approval.
c) That all future buildings on the subject property will be required to submit a
Certificate of Zoning Compliance (CZC) application prior to construction. And all
future buildings adjacent to Meridian Road will be required to obtain Design Review
approval prior to construction."
. Section 6 - Conditions Governing Development of Subject Property
This section of the recorded DA sets forth additional conditions and restrictions for the
property .
Section 6.Bla of the recorded DA currently states:
"a) All future uses on proposed lots or parcels within the annexation area shall be
approved through the Conditional Use Permit process."
Replace the above-mentioned language with the following:
"a) All future uses on proposed lots or parcels within the annexation area shall be required
to comply with the amended Section 4 of the Development Agreement and tlle Unified
Development Code."
Elevations: Yes
Staff Recommendation: approval; please direct the City's Legal Department to draft modifications to the
recorded development agreement for Mussell Corner (as proposed and/or modified).
Outstanding Issue( s) for City Council:
· Do you want to require additional modifications to the existing 2M building at this time?
· Should the proposed flex building be allowed to house the expansion ofthe non-conforming 2M
use?
· Is the concept plan sufficient to remove the CD requirement? Please note that the proposed
access at the north end of the site is not consistent with the UDC and was only approved as a
temporary access for the Victory Greens business only. Any decision you make regarding
the concept plan should note that the northern access needs to be removed.
· Are the proposed design standards sufficient to remove the CU requirement?
Notes: