Loading...
HomeMy WebLinkAbout Landscape Plan 6 Revised 55' 5' 20' 5' ROOT FLARE TO BE AT SOIL LINE M PREVAILING WIND DIRECTION SOIL LINE G REMOVE DEAD/DAMAGED BRANCHES AND \ \ PRUNE TO INTERNATIONAL SOCIETY OF \ ARBORICULTURE STANDARDS; IMPROPERLY / PRUNED TREES(AS DETERMINED BY THE LANDSCAPE ARCHITECT)SHALL BE REMOVED 2' X 2"X 14 GAUGE SQUARE 2"STRIPING,TYPICAL V� AND REPLACED. DO NOT REMOVE MAIN TUBE POST 8'O.C. (WHITE) � LEADER!! L 1"X 1"X 14 GAUGE SQUARE INSTALL PICKLEBALL NET RUBBER CINCH TIE 44" TUBE SUPPORT BOTTOM RAIL PER MANUFACTURER'S 2"x 2"WOOD STAKE(LENGTH AS I", zSPECIFICATIONS i7 REQUIRED)-DO NOT PENETRATE ROOTBALL. 5/8"X 5/8"X 16 GAUGE SQUARE -- - PICKLEBALL POST PER TUBE. SPACING TO BE 4-9/16" SEE NOTE 1. SET STAKES PARALLEL TO - MANUFACTURER'S PREVAILING WIND. O.C. LO SPECIFICATIONS CO 1" " Z REMOVE TREE WRAP TRUNK PROTECTION, to X 1 X 14 GAUGE SQUARE FENCE PER PLANS TUBE SUPPORT BOTTOM RAIL Of AFTER INSTALLATION EDGE OF PAVEMENT Q ()f vv CONSTRUCT 2"EARTH BERM AT EDGE OF :Al FIG K WO ROOTBALL, FILL TREE RING W/MULCH,AS � SPECIFIED. 8"X 24" N Q 3"THICK MULCH LAYER, KEEP MULCH 3"AWAY CONCRETE FOOTING it') m O FROM TRUNK. $ 4_4" FINISH GRADE NOTES: 0 1. CONTRACTORS ARE RESPONSIBLE FOR SHOP DRAWINGS TO BE REVIEWED BY LANDSCAPE ARCHITECT o w /jam//�//�j�// // �% //V//�//�/ �/ A� COMMERCIAL SLOW RELEASE FERTILIZER BEFORE INSTALLATION. WROUGHT IRON GATE TO BE PAINTED W/ELECTO STATIC PAINT-COLOR AS LL_ \/AAA/AAA/�A VA/� / / / //A/AA TABLETS DIRECTED BY OWNER. Q U /V/V/ /\ V /V/ /V/V/ p w \ \\ VA VAj AAjAA V A \� 2. WELD PER AWS D1.1. V) SIDES OF HOLE ROUGH&UNEVEN 3. FENCE PANELS PER ASTM A653. O4. FENCE PANELS TO MEET ASTM FD2408 STRENGTH AND POWDER COAT REQUIREMENTS. III BACKFILL WITH APPROVED TOPSOIL AND 5. FENCE PANELS RATED PER ASCE 7-05,90 MPH WIND. I .SOIL AMENDMENTS AS SPECIFIED. 6. 2"X 2"POSTS CAPS REQUIRED BACKFILL IN 6"LIFTS,WATER EACH LAYER, WIDTH WIDTH WIDTH WIDTH WIDTH TAMP LIGHTLY AS REQUIRED, BACKFILL WROUGHT IRON FENCE PICKLEBALL COURT LAYOUT 3" DEPTH OF MULCH AT PLANTER OF ALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/TOP OF ROOTBALL, BEDS 5' MIN. DIA. DO NOT OVER COMPACT!! 6$� TREE RING SCALE: 1/4"= 1'-0" SCALE: 1"= 10' or SET ROOTBALL ON NATIVE, UNDISTURBED SOIL NOTES: B 1"x6"CEDAR BOARD H \ -III - 1. REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP'/3 OF ROOTBALL. REMOVE ALL NAILS,TIES,AND PLASTIC FROM - __ - - - - - - = APPROVED TOPSOIL AND SOIL ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY AMENDMENTS AS SPECIFIED BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. B' '-"x6"CEDAR TOP RAIL FINISH GRADE, - 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO ENSURE 8 PER PLANS THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR PRESSURE TREATED WESTERNAFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE SECTION A-A' RED CEDAR POST PLANTER BED CUT EDGE WARRANTY PERIOD. 1 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE (TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE ARCHITECT BEFORE PROCEEDING. N 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT MATERIAL. A A' 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING N G METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. 8 x6"x8',#2 OR BETTER, NO 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. HOLE, KILN DRIED INLAND A' A' 8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0"IN WIDTH, PROVIDE TREE ROOT BARRIER(DEEPROOT RED CEDAR TRIM #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS,CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. 71, x6"X6',#2 OR BETTER, NO A=LENGTH,AS SPECIFIED o HOLE, KILN DRIED INLAND OR PER PLANT SCHEDULE DECIDUOUS TREE PLANTING I RED CEDAR PICKETS, SPACE m 1/2"APART B=85%OF'A' 4 NOT TO SCALE 2"x6",#2 OR BETTER, + O DOUGLAS FIR RAIL,TOP RAIL SET 12"BELOW TOP OF POST. F ROOT FLARE TO BE AT SOIL LINE. MIDDLE RAIL TO BE CENTERED BETWEEN TOP PLAN VIEW FINISH GRADE PER PLANS AND BOTTOM RAIL. GROUNDCOVER PLANTING PER PLANTING PLAN PREVAILING WIND DIRECTION _ MULCH, PER PLANS, 3"DEPTH OVER ENTIRE BED. =11 =11 =1 =I.I=1' REMOVE DEAD/DAMAGED BRANCHES AND 1I =11 2"x6",#2 OR BETTER, DOUGLAS FIR RAIL, DO NOT COVER CROWNS OF PLANTS SOIL LINE PRUNE TO INTERNATIONAL SOCIETY OF =11 =1 a = TOP RAIL SET 12"ABOVE FINISH GRADE a ARBORICULTURE STANDARDS; IMPROPERLY TILL SOIL TO A DEPTH OF 12", BACKFILL WITH o _II I'I II I.I APPROVED TOPSOIL AND SOIL AMENDMENTS,AS PRUNED TREES(AS DETERMINED BY THE N -III a =1 SET FINISH GRADE AS SPECIFIED ' -° • LANDSCAPE ARCHITECT)SHALL BE REMOVED =11 ° 1= \ IT\\7TT\TC SPECIFIED. ° \jAjA ��A j�Ajam A • 4 AND REPLACED. DO NOT REMOVE MAIN 1 11- 4"x4",4"X6"OR 6"X6"PRESSURE E = AAV�\VAV7\V�\V�\VAV�\V/�AAVAVA SUBGRADE a, LEADER!! TREATED WESTERN RED CEDAR POST N A/A/A/A/A/A/A/A/�/A/A/ / L �I II II I WITH BEVELED TOP, SET 8'-0"APART _ VAAVAAVAAVAAVAAVAAVAAVAAVA VAAVAAVAAVA [� RUBBER CINCH TIE ELEVATION =1 1- - O.C. X\yy hVAVA��\V�\ ICI I 1 III III 11 III III 11 Ii . ;II11111111111,� III III III III III III III, 2"x 2"WOOD STAKE(LENGTH AS 4"4" 4'> CONCRETE FOOTING AS SPECIFIED • REQUIRED)-DO NOT PENETRATE ROOTBALL. III ° a e SEE NOTE 1. SET STAKES PARALLEL TO 6"AGGREGATE BASE PREVAILING WIND. • G SECTION ° • COMPACTED SUBGRADE o • � NOTE: - - - NOTES: •°� 1. REFER TO PLAN FOR FENCE LOCATION. NO. REVISION/ISSUE DATE CONSTRUCT 2"EARTH BERM AT EDGE OF 2. PANELS OF FENCE TO ALTERNATE SIDES AT EVERY POST. SEE SECTION A-A'. 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. o o ROOTBALL, FILL TREE RING W/MULCH,AS CDD 2. APPLY SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER oo SPECIFIED.BEDS. CEDAR DAR FENCE -� 3"THICK MULCH LAYER, KEEP MULCH 3"AWAY o�° 0F 811 , o C) o FROM TRUNK. SCALE: 1/2"= 1'-0" oo ��P�N SHpP►��� o GROUNDCOVER PLANTING •� °� KnuwwiI below. Q o- -` U o CALL 2 BUSINESS DAYS Z, a o o r- v 4� F-o Call before you dig. E N ADVANCE BEFORE 2 NOT TO SCALE m o� W W ! Ana `- O w 4 �OO IE CAVATE FOR THE 9 - _ F °O YOU DIG,GRADE,OR 5 0o p U)L.� VAVA VAVAV -�� ���0 MARKING OF ti A \ \ \ \ \ \ \ \ \ 000 B �UND _jQw `° DOGIPOT® MEMER UTILITIES I 4C COMMERCIAL SLOW RELEASE FERTILIZER O TABLETS ISMFA 1204)=C ILPET SIGN (ITEM#1203 ° MEM REMOVE ANY PLASTIC, BURLAP, NAILS,OR OTHER ~ ° MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT -III SIDES OF HOLE ROUGH&UNEVEN ALUMINUM DOGIPOT® z ROOT GROWTH I I I N w O • . • ' " BACKFILL WITH APPROVED TOPSOIL AND I O JUNIOR BAG c • • WIDTH WIDTH WIDTH WIDT WIDTH SOIL AMENDMENTS AS SPECIFIED. O DISPENSER(ITEM ;� •• CONSTRUCT 2"EARTH BERM TO FORM A WATER _ U w + •� • �� ° RETENTION BASIN, FILL BERM WITH MULCH,AS OF BALL OF BALL OF BALL OF BALL OF BALL BACKFILL IN 6"LIFTS,WATER EACH LAYER, - #1002-2) w SPECIFIED 5' MIN. DIA. TAMP LIGHTLY AS REQUIRED, BACKFILL 0 v z z 't •`,, SOIL EVEN W/TOP OF ROOTBALL, z • TREE RING MULCH, PER PLANS, 3"DEPTH OVER ENTIRE BED. DO w w v o DO NOT OVER COMPACT!! O NOT COVER CROWNS OF PLANTS STEEL TRASH a a a o Q g ����� SET ROOTBALL ON NATIVE, UNDISTURBED RECEPTACLE WITH LID � zax � _ � � Qati VAVAA VAVAA PROVIDE COMMERCIAL FERTILIZER TABLETS AND SOIL (ITEM#1206 L) Q z o III III V-/ o = \ BIOSTIMULANT,AS SPECIFIED, FOR EACH SHRUB a C7 a co - \ \\\i\ NOTES: TELESCOPIC RODNEY EVANS + PARTNERS a . . . + IVY GALVANIZED STEEL reand artners.com+208-514-3300+1450 W.Bannock Street,Boise,Idaho 83702 X BACKFILL WITH\\VAA/ A�AAA� AMENDMENTS AS SPECIFIED. TOPSOILD KFILLDIN 6�LIFTS, 1. REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP%3 OF ROOTBALL. REMOVE ALL NAILS,TIES,AND PLASTIC FROM MOUNTING POST(ITEM p _ / / //// ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY - #1301-P) _ L WATER EACH LAYER, DO NOT TAMP OR OVER BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 00 COMPACT. 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO ENSURE - _ _ \ 1 \ i 11i1 PEBBLEBROOK SUBDIVISION Q "' THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR N =11 IIIII ° i 12" WIDTH OF 12" CONSTRUCT 6"MOUND OF TOPSOIL AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE I I11I I� MIN. ROOTBALL MIN. WARRANTY PERIOD. \ 1I N. MERIDIAN ROAD \ 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ! III =11 MERIDIAN, ID 83646 = NOTES: I A ARCHITECT BEFORE PROCEEDING. I I IIII=III- 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT -1111111 \119 \ COMPACTED SUBDIVISION IMPROVEMENTS 1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. - - SUB-GRADE MATERIAL. 1 I' o 2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING s 0 3. THIN BRANCHES AND FOLIAGE BYY3. METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. PRELIMINARY LANDSCAPE PLAN 5. FOR CON LINE R GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. DETAILS Ir Ir o CD SHRUB PLANTING CONIFEROUS TREE PLANTING DOGIPOT® PET STATION PROJECT SHEET 0 3 NOT TO SCALE 5 NOT TO SCALE 8 SCALE: 112"= 1'-0" 23080 a MODEL #1003-L N DATE 02/13/23 Ll ° 5 0 it DRAWN BY CHECKED BY T Q LP BSS 0 N 1 2 3 1 4 5 6 1 7 8 9 10 11 12 13 14 15 AGENCY REVIEW