Loading...
HomeMy WebLinkAbout2024-04-16 Pathways Amended Reviewer: Kim Warren / Pathways Project Manager Planner Assigned: Stacy Hersh Project Name: Name File No: H-2024-0005 – AZ, PP, Date: 13 March 2024 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. Interactive Pathways Map 2. Prior to final approval the applicant shall dedicate a public access easement for a detached, multi-use pathway (concrete sidewalk) running the length of the Meridian Road frontage. Multi-use pathway and micropath link as depicted on Pre-Plan drawing dated 2-2-2024 fully address these requirements. Easements shall be a minimum of 14’ wide (10’ pathway + 2’ shoulder each side). Easement need only be dedicated for multi-use pathways that lie outside the public ROW. Use standard City template for public access easement. Submit all easements online through Citizen’s Access Portal. 3. Construct multi-use pathways per paving section based on existing site conditions as recommended by project civil engineer in accord with UDC 11-3A-8 and 11-3B-12. Prior to final approval the applicant’s engineer shall provide written documentation that the pathway segment was constructed per the recommended specifications. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. Rev. 03.11.2024