Loading...
HomeMy WebLinkAboutPublic Utility Plan -- -- 6 Keyed Notes <�> 24 RC -_ 1. DOUBLE WATER SERVICE PER W1 &W3 WITH 4" METERS AND 1" 6PI ' SERVICE LINE SIZE. r�6\_ 4P 24 RC 24 R-6P% __ __ \ \ I 2. SINGLE WATER SERVICE PER W1 &W2 WITH 4" METER AND 1" 24 6P/ \ 4 RC 2 RC l 6P- _ SERVICE LINE SIZE. 4PI_ 24 RC 6P'' - _ _ � ' \ 3. RE-COLLAR EXISTING WATER VALVE PER W11. 4P/_ 224 RC �pl_ 4. REMOVE EXISTING BLOW-OFF AND CONNECT TO EXISTING 8" PVC ' WATER. 4P/� RC R- __- x 4� 24 6P/ 1-- 24 _ _ 1 5. C-900 STORM DRAIN -ADJUST WATER DEPTH TO CLEAR STORM _5 tp RC 24 RC ___ s25202. 1 DRAIN (8" MIN . CLEAR). SEE SD SHEETS FOR ADDITIONAL 4PI 24 RC 24l=6- -_ I INFORMATION. C PI � ti \_ 6. MAINTAIN 18 OF VERTICAL SEPARATION BETWEEN WATER LINE 4 . _ � � / 1 \ \ I I \ 1 PI 24 RC 40 1 AND NON-POTABLE LINE. SEE WATER NOTES 2 & 3 ON SHEET C1.1. 4PI_ - 4 � 1 O » __ 7. BACKUP PRESSURE IRRIGATION SUPPLY- 2" WATER SERVICE, I \\ I I _ 4p/ " 14.39 LF 8" 3 5-1 ---__ METER AND SETTER PER W4. \ \ 10768 SF 1 I \ I I I 24 R� g N:726590.6124 E:2453850.5173 \ v __ 1 I) 6PI 6-1 \ \ I I I s\ 1 I 3-t 8"X 6"TEE 12.89 LF 6" 3C RC i 15482 SF V A I I 7007 sF a v i 6PI N: 726532.5945 \ I s I 6 GV 258�. P/ -____ 1 Notes E:2453594.8844 loss sF �\ ` / I L-4l I 30 RC 6PI I 8"11.250 BEND I _ \\\\ 7.95 LF 8" N: 726588.0306 I� 61'I� __ N: 726535.5665 1 1. ADJUST WATER METER VALVES AND METER TILE LID TO MATCH \I\ \\ \\ 19.77 LF 6" I 8"22.5° BEND I \ E: 2453863.1466 3p RC 6P/ -E:2454078.7014 1 FINISHED GRADE AND SLOPE. I I \\ \ \ 18"X 6"RED. I � \\ �\ / 6 / FIRE HYDRANT PER W8 . � � ` -'--_ 11.25°BEND -_ 1 ° \ \ I 30 RC 6PI ---__ 1 2. ADDITIONAL FITTINGS MAY BE REQUIRED FROM THOSE SHOWN ON 6"GV) co N:726582.8268 N:726533.3080� - 6P --- _ 1 THE PLANS - IT IS THE CONTRACTOR'S RESPONSIBILITY TO _ _\ / E:2453848.9256 \\ E:2454038.1983 ` 30 N: 726538.1890 ---- O - DETERMINE ALL NECESSARY FITTINGS REQUIRED TO CONSTRUCT , \ RC 6P/ \-- E:2453575.9208 \\ \ \ I \ I Iv 11 \\\\ / 11.25°BEND \\\�� 45°BEND _ - 7 THE PROJECT AND INCLUDE ALL WORK AND MATERIALS IN THE \ FIRE HYDRANT PER W8 \ O - - \ I I 1\ \\\ / / 4-3 22.5°BEND " .' _ _ 30 RC 6P/� PROJECT BID - NO SEPARATE PAYMENT SHALL BE MADE. ' \\ 1 1 \ 2-1 � O/ 5260 SF / \ o _ 3. CONTRACTOR SHALL ASSESS THE PROJECT SCOPE OF WORK AND \ 5421 SF xJ / \ / \ \ \ / \ \ \\ / J (\\ sd� / 6 \\\ / 40.57W 8 8w - _ ALL EXISTING CONDITIONS PRIOR TO BID, AND INCLUDE ALL WORK \/� / \\\ � L----- -------�-- / •• � / •: 6 � .:.� \\ / / 5 � ' : ' . � 1 (INCLUDING SURFACE RESTORATION) IN THE BID. 5 8W 191.S7LF `;,' ..: _ _ 1 CONTACT DKYJNE 4. RETAIN & PROTECT ALL EXISTING UNDERGROUND UTILITIES - ---------------- 6 \ \\\ \ / / : / / \\\ \\ / /.,`. ' \ 3 8W PROVIDE TEMPORARY SHORING AND SUPPORT AS NEEDED TO �"��� \� \ / / \ 00 W, C L -i 8w RETAIN AND PROTECT WITHOUT DISRUPTION - NO SEPARATE BEFORE DOING HI LA LLS ST- `�� o a7 ~ PAYMENT SHALL BE MADE. 1- 0-342-1585 I , \\ ���.� '.a• � ,,T\ / // \\ \\ s "�1 80w 1\ / I 6 _ : : • ati '` `. 1 �2 5250 SF V 7-1 I I \\ I s ' `\ � t�s / s I I--_--- ) 6712 SF I \ ' Lu \ 10631 SFLLI 1 � Z I\\8s •6,cP Q7 U O L------- I C7 :/ \\� \\� 4P/ I > 726428.3607 E:2453653.5508 6 -J 1 �ip 1 45°BEND O\ 2-3 > \\ I \ / / '• / \ 5250 SF / Q 19'1333 F '.."/ \\ I I I 1 Y Q LL I 0 \ s 5 0 l 10- \� l \\ I 1 1 p O w' _ O m Lu 6 N / / \\ / / / \ \ 5�94 3 F I I II Q 7 1 1 m lip/ 1 \ I I I 1 W m // / \�O S �sw \\ wLu / // 1 \ = 8W' N: 726384.2810 \\\\ J� / 4P, I \ � 1 I 1 F 8-1 / r \ N l\\ I I \ I 11 F n331 SF / / / \ :. •• 13 �E:2453779.3629 \ / / `v / \\\ \ 1 1 w 331\g 1-3 / s V \\ I I \ I z W 8 TEE \ l I` t-4 1 1 O 6 5...Sr / S� 23107 SF > I 8"GV(N)) \ 1� - \ 1 O a 6 8"GV W \ / s0, / / \\ I 1 1 \ / 8 N: 726348.9025 I o \ \\ / / / \ 6 •• \\\\ \\ E:2453919.6560 .00/ / /' l 4P/ s J L 1 SS�ONAL ENG \`2584 /// / / / \ 6 gW FIRE HYDRANT PER W8 / / / \\ 4P 1 Q� Q-� RFO FF \ / \ \\ / : J G\STE \ / / \ 9107,E 8 :� v " W 13.00 LF 6 1 0 8 1 3 \ / / \ / l / ` �LE4 14 \ N: 726319.8034 D \\\\ \\ /J SONS 4'O`F8„BW... / \ . : f �O .,4p \\ / // 61ao-tF\ // / / \ %.E: 2453963.3945 % / / / �p TF OF OHPMH o / `\\�\ / / / \ �s 8"CROSS - ��l ass /( ER\C�So MH D WE / "sTop UILT6 \\\\\ \ -•. v W \ �� 8"GV(N) / 00 // _--\\ / / �\ \ \ 8„GV(E) / /' / / 19-4 / / LO 't LO • , • \�1 l l \\ \ �'• \ \ SO 8W / �/ / 5249 SF / 1 • • • ss�55F \\ gs 90GF / '� .. '; '; 8' l l l 1 • v . •.. .. .. N:726336.6337 ; / / / / / 6p \ / O eW / , / 18-4 1 .. .. .. • \ _ / / / / / / E:2453915.3575 \ / / / / 5418 SF 1 • • • • // / / ,25a� / / / t2-1 / // / / \\\\\ 8"X6"TEE \ 8J �' \8�' • W l3 / l 11 / 11 1 � , 6615 SF / \\ \\ 6"GV 3 6 \ Z� o ,\ �o // ; 1 / / S 46PI 6615 SF / 1 C .• Q 6pl \k\\\ \\� �/ / /l / /l / l // / �o - 3 \ 6 ?8�4�� 6 O \\ \ / Q �o \6P \\ \ / \�\ // 14-1 // / �� W / 8 8W 1 ao \\\ / / 7114 SF / \ \ ¢a / G` \\ \ Fq S 1 z 6 ONS 8W 6 `m \\\ \ � r. \ / o zu U 6p/l\ \\\\\�\\\ 11 / 11s9(MgTCNFX/gT/ //l / // \ \\\\\\ gs ?g g8�F88W\I N m \ _ 1 /l WgTFRq / l /l zz oN 1 0 7' / /G/yti1 / 6 1 L LJ o \t 2 FHTJ / LJJ 6pl / 7,as�sF l l 258g 1 1 1 r 1 = as 6p/ \\\ �\ \� / / / O Lu w w Lu \\\ 6 / 622E 5 io \/ ^zszseE• s \ \�\ \\ l \\ l l l l / / 1 l zo 00 6615 SF / �w 4 6PI J / \\ ow 3 4p / / / / low i h 6p \ // / ;5 4-2 o 6615 SF 3 b-3 Z / 3 1 6pi 5 / cb 6p/ \ s \\\_ / / / 1 Z 2ILE \ _ 6p/ P \\\ \�\� / 1 W z v � v w Y �co v m 6p \\ 0 z WATER PLAN - WEST 6 z 6 , a 0- WIL LL0 30 60 1 FEET 1 JOB NUMBER: / 1 IDB2338 DATE: 3-14-24 W SHEET NUMBER: ui a Wol _ � 1�6PI I 3 _ x O I Keyed Notes �30 RCS BPI _ 1 -`�-__, N: 726509.9332-6pl '-- __ I� � o 1 E: 2454268.9974 6PIl _ FIRE HYDRANT PER W8 ---__ 2, o 1. DOUBLE WATER SERVICE PER W1 &W3 WITH 4" METERS AND 1" _ 0 RC 6p1 -- - -------------------_ N: 726491.8373 SERVICE LINE SIZE. � 1 - _6p/ E: 2454618.0522 W 1 - -13.00 LF 6" 30 "� 2. SINGLE WATER SERVICE PER W1 &W2 WITH 3" METER AND 1" W 1 _ RC BPI BPI WR,ER-2-A 4"BLOWOFF PER W13 I 8 4 W_8W _ EST WRIER IEWE 2MC66' I \ 4 SERVICE LINE SIZE. O 1 120.64LF8„ a o; N: 726473.0337 3C r - -- -- -- -_ __ __ __ __ __ __ 3. STEEL CASING CENTERED ON WATER PER SW1 & SW2. _ _ o W 1 Sg' 8W E-2454384.5900 4PI 4PI °O \ 4. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN WATER LINE 2 _ :. ,.• - - / U- N: 726471.3375 +F" +PI ��` I I W s8� Sg 8Hr - ,•'• 11.250 BEND - - 3 - - - f-o- / -----__ AND NON-POTABLE LINE. SEE WATER NOTES 2 & 3 ON SHEET C1.1. (/) N:726497.1966 _ :. o j.. o E:2454617.9038- -- - fl \ E: 2454266.3936 S8 _ _8W /'. 33 32 LF 8" N a + 8�,TEE \- L 2• 4 / II N \ _ 8"X 6"TEE a S� 8W- SW o 8W MV 8W�8W 8"GV(N) O 6"GV(N).•: . .. : .. W CH o z/ �, 1 1 a 8.,GV(W) 1 21-2 OC� �Q _ I / 5775 SF AHIL�SST. S S S \ 4 4 � S2/ S8 00 - 2588 S l\ Notes I 1 I -- - ----- II ;..�,. - --- -J m 1. ADJUST WATER METER VALVES AND METER TILE LID TO MATCH 1 I I I 1 I 1 FINISHED GRADE AND SLOPE. N: 726437.3379 1 I I -- ----------- Fi 1 \ - 2. ADDITIONAL FITTINGS MAY BE REQUIRED FROM THOSE SHOWN ON E:2454617.6578 / I '.. .': I o c 1 1 I I I ------- I ------ o 1 ' I / I I I N THE PLANS - IT IS THE CONTRACTORS RESPONSIBILITY TO I 1 I I r---------� 8 X6 TEE I � - I I II I __ 4 1 / 1 DETERMINE ALL NECESSARY FITTINGS REQUIRED TO CONSTRUCT 1 1 1 1 I 1 ----- - 6"GV(N) 1 418 S I I 1 I / l l I I / N:726437.2439 I I 5418 SF I I I 1 I 1 1 I I � 1 1 I I I \ I `• I I l THE PROJECT AND INCLUDE ALL WORK AND MATERIALS IN THE 1 9-4 1 E: 2454630.6575 I I I I I PROJECT BID - NO SEPARATE PAYMENT SHALL BE MADE. v l w 1 FIRE HYDRANT PER W8 I I sss4 SF S �� 3. CONTRACTOR SHALL ASSESS THE PROJECT SCOPE OF WORK AND 1 5588 SF I I I I ALL EXISTING CONDITIONS PRIOR TO BID, AND INCLUDE ALL WORK 13.00 LF 6" I I 5-4 1 1 "• -- I --_------- I I„ I I 1 (INCLUDING SURFACE RESTORATION) IN THE BID. 1 1 1 1 I 5757 SF , m 11 i I 4. RETAIN & PROTECT ALL EXISTING UNDERGROUND UTILITIES - \ 596677 SF 1 I I I I \I I - - - / - I , ;E` ' PROVIDE TEMPORARY SHORING AND SUPPORT AS NEEDED TO 1 \\ 1 1 I 1 I / 1 1 I / I •, ) III I --------- --�---- : ' cn 00 1 I s II I RETAIN AND PROTECT WITHOUT DISRUPTION - NO SEPARATE 6469 4E I I II� '1 \\ a 4 \\ H ' �°" ° �I o l PAYMENT SHALL BE MADE. 19-2\ II I 5250 SF \ 1 I I I�\ I I CONTACT DIGLINE 10-4 48-HOURS ;�� \ I I 1 _ I 1 1 I I 1 ;• \ I I _--------/ I 1 .., 1 \\ I I \ I I BEFORE DIGGING 1 � • - 1 1 I .. °..: I I I � I \ I � / 1 00 \ I rR \ I - - ------------ � .. 1� II I � I 1800-3421585 L__ / - - - - \--- ' I I 1 o \� ----------- ---� :r W ---------------\__ I I I I I u R 1 I - - > \ J I L I 1- --I------ ------- W 1 \\ I o / Ih I I II 1 I- 1 4p/ 5 I I / \ 1 4 ' I to l \\ \� 1 Z . z 4PI \J \\ \ \\ 18-2 �� I .': .:• II II II I I (� O � 1 5250 SF \ 1 I I II I J 4p \\\\\\ 2504 I J \\ I I I I I I I J > •'•. O N I •.: I I II 1 I I I I I � V / '88�F / / �s�j / / / / 4p/ 1\ \\\\\\ m o I m - 1 ��\ �---------- Q cn Z N �------------- -I - \ - - - - ��� 1 . I I I i Y Q - / / / / 575�F \\ / / / / I - - - - I -- ------------ \ / III W 0 - --------- MIN. Q W / N: 726239.0001 -I--\ -- \ 4 a 4 \ m II 11 lol 00 1/ E:2454233.3390 �s� / \\ 1564 / / I 00 \\\\ \ 1 j I 1 �_ o II I I II I � I Lu Y \ / o N \\ \ I J10.50: I I 1 17-2 Q FIRE HYDRANT PER W8 / / \ / / / \ \ I 5250 SF I 1 m 4-4 1 I \ I 1 II I I I I W m 52oSF 3 ) \ II I H ui W 13.000 0 LF 6" / / / / \ / Boss SF / \ \ \ m r _ / / / 1 \\\ 9a 12.50' I / I O I n I cn I I Lu 8-4 I \\ \\ I /-----I-��\- Lu 4 O / / \j / / 22157SF I L------ - \L- -� /- - - - 11 I I I I z o '. _ / / \ \ \4. __ \ o _ _ / / / / \\ cn 1 � I I 1IWL I � / i I I I I I ��S NGj 18-2/ m 1 I I O �G\ST ERF �F W 4 1 \\ \ \ 5250�F / 1 0 `/ W 4 8w.. 1 / // I I 525 \\ �� \\ I A. \\ \\� •. y • CDs - J 1 0 8 1 3 8W 4 1 1 o I \ �\\ > � -� 1 ' II I I I I 1 N: 726225.4087'' 4 �. 1 �\ 1 ------ -- --�---I J 11\ 22F 11 GC 1 I I s� �o E: 2454232.8155 L \ \ C �' 2 - - / - 4 1 - I I 1 I I 9TF �QP s 8w a; ; . 8.,X6"TEE :: S �. \\\ --�-- -- I �So 1 / 6"GV(N)� 8 �iy I N: 726127.4512 //- ��\ 1 I r // I / I � 1 I /( ER\G 1 8W y \ I I E: 2454551.7213 \ \ FIRE HYDRANT PER W8 \ \�\\\ f ' 4 'T _J // �/ y/ I I I I Lu om j . . ; . . r .• .• 1/ / / // - . •;. . . -- J 8 0\8 I C/30 N: 726115.1824,_ \\ N: 726137.0594. \ v \ s155a 2F i \ 1 m 1 • ' I _ Z II • 4 S 3 �364F�' :: _ \E: 2454547.4228 __ E: 2454615.4849 \ / o I I la- 1 �' I I I .. .. .. . 8 \ 0 4p 22.5°BEND' \ Iw 1 n I • . . . co 8S 8 8"90 BEND / _ \ 1 � ` I I 1 n I 1 I W ,E ;. ',. II ' 8 X 6 RED.(N) CI30 _ I - 1 I 1 1 6615 SF 8S_ \8 6"GV(N) \\ 3 co ___---_____ :�. I I I \l �. JN S 8S 8W \ew _ _ 1 I to :. ... \ " �� �� � � '13.00LF6 � \ � 1 / / 66115SF / / / / 8S / 4PI 4PI II I I 4 8 S��OLF8../ \ 4 I I 1 NI III I a �o 01,30 7-2 \6615 SF / 8S V. 1\< ` / / \\ / / / / / / 1 _ : 4 S 4 O/ \ 34-2 u1 1 O \ \ Z. N:726096.3351... C 3 I I \ I N 1 4P / / / \ / / 661152E / / / / / : E: 2454601.2166 / \\\ \ \ _ 1 o 6p/ / a� 2587 -- \� // / // // / // �7- 2 900 BEND zQ 0 \6p/ �� I l l\/, /l l / / , �_____� --- ---\ \ \ �_ \ i \ � I � I \ of \ \ / -- - -- --__ 0 3 I 9-2 R, -�--- \ \ \\ \ \ - I I I I a= / / m //�--_�� \ \ 1 \ I I z 6615SF / / ryh IIII--_� /- - ---__ \ / \ II 1 cvn I \ I I o� / / / / / II / / / / \ 7 Z 1CI-2 =N 66156E I 10l10 5390?F // // III I �s� \�/ I I ' '. 11 1 i 1 rl� I a 4pl �l /ll l 11 III 1 i--\/ 1655SF \ / L\\ W N i I i N3 Y k 5� I/ I / / / / / I I_� /// - \� 1 cn o s89 0 0 IL-1- // �/ 1 11 1 I II I Z 00 27SF s W 11 1 Iol m I p sue_/ // I I I 1 I I I w > w U) a .. 6 ., Y z r Z W � o�co W z _ I w II 1 n I I I On O w W o-L a a o \ qp/ \ I :• 1 I 1 I \ /h� I JOB NUMBER: IL IDB2338 DATE: 3-14-24 WATER PLAN EAST ` / ' \\ / I SHEET NUMBER: I W 0 30 60 ��4 I N 1 1 I I Lii FEET Icl) 11 I I III I I F Wm2 II�R� I I III I I = � d \ RRAMO NT PP 7 0 PPPPI V1S10N \ w PPP 14797 4 1 N0. 24 R 6P, — 2 RC 6pI - 4 79 9 l 24 RC I---_ 4PI R --_ 4PI 24 RC 6PI i I 24 RC 24 RC 6P _ 4PI 24 24 RC 6pjco \ r_ 24 RC 6P _ I \\\\ 1 1 I � r-_4PI=C 6 li- _ Pq N I \ 1 I I 1 -__ 4PI . --- �A I� I MO N \\ \ 107881SF I _--_1 ° ' 1 ' — T SRD1 UNPLATTED \\ IN 1 _ Q- - BK 8 PG l/jS� N N 154482 SF \\ \ ' ' ' ' 07 ♦ Ih SF 3p RC 6PI_op/ -___ 150 7 I \\ ♦� 4-1 1 �� ♦ / / -4PI 3 _�I --_- l6 150 Q \\ ♦♦ I 1 1 ♦ 7096 SF 1 ♦ cb • • _ C C 6pI - 4 U \\ c _ PI 6 _ Z ° i \\ \\ ♦♦♦♦ 1 I ♦♦♦ I I ' � ♦ ! • \ 30 RC z , \ ♦♦ 1 ♦ 1 I SSMH-1 • \\ r 6PI �1 _ cci1 I- O N I ♦♦ �/ ' I �S\ \tom\ Co • 4-3 �� Q _ 30�6P�■.■ - I ♦♦♦ , ;:... ... \ ♦♦ J I 2-1 C8, 41, 5260 SF / - _ _6p�■ ::_• _ \ ■ m , .����, _ ■■jam-�_ 8 s ------�- ♦ > ♦ /. / / �■ SSMH-11 - _ 1 ♦ SSMH-4 ♦ ,' / \ ���/ / .`.`/ j �� ::8w.... C sd ■■I �NEEN■■■EEN� ■■■■■■■■■■�■■■■■■■■■■■■■■� , • / ; cry 3-3 � - _ - HEET 1 • . : 1 7-1 ♦♦ I I ' tt // )r♦, / / ♦ tJ 1 5250 SF i l HG NlL _ S• o Rc 25 ----------�- --- ---------- -- - 6712 SF / ♦ _ .- , r. _ - LS .8 88 4PI 9� ♦ ... <� / � ♦ / ♦ ..- � ..�' ♦ CAS l l l � ' l / . — 8� — _81A: �—�— � I I O ♦ 9 ♦ •� / / /: / / _ _ _ SSMH-10 ■ 1 ♦ so / ,-t • Q ♦ / / ■ _ - 8W . 8W 8W • BW 8W SSMH-9 ■ I I - L_ y / q/ ♦10631 SF • _ • ,, / / / ! _ 21-2 I I CONTACT DIGLINE - O / /:'. Q7 / / .. _ _ _ _ ■ - , ■ 5775 SF "..• 1 m -----------♦ \ it , /� �� /.;: .. ♦ � � l /l l % ;l I Wit is ' I _� _ _ ■ I �I I I I N , 48-HOURS Q ♦ \ / • • 5250 SF / 195-3 F / / / / 1 I ■�• ■ 1 r - __ - ■ ■ 1 1 1 I BEFORE DIGGING : •• w ♦♦ _'.':. - �11.11 / •,, i l l.. •■■�Y�i •� 1 - --., . - _ - -_---_ - N I 1-800-342-1585 SSMH 3 �� ♦// /\ ,....� ♦ • � `. �, •� � / N - Q / �//�'� / ' 2-4 I I III• ■111■ � �_ -- -- -- --------- ■ I ■ -------� I 5249 � I 1 3-74 1 ' '7 ■■■■■■ `1 1 1 'i l 1 Ir ■� 1 V+ ■ 20-2 1 / /♦ 8w • �� a 1 1 1 5418SF I 1 1 ' I I ■■■■ r■■■■■ I ■ ■ ■■■■ ■■ ■ ■ ■ ■ ■1 1 1 1 ■ ` 5250 SF 1 1 I I I I I r � � 8-1 / / ♦ �1�• � � � J�I� 1 1 I I I 4-4 I I I � I � s � 1 11331 SF / ♦ / • • 13 �f ' I 1 I ' 5588 SF I I I ' I I b �� ■ I ■ I 0 / / ♦ / / • SSMH-2 / \• � 1.86 / = z31o7 S��/ S-4 I ' 1 I ' h`b I ■ I ♦ = :'. 1. I I 1 1 1 I ■ I `1 I I ``' I ■ I I I 1 Z 1 / / •• / 11 / l ' l l 4P/ -_JI ' I ' I ' I I 1 ' 6-4 1 ' ' 1 - - - ■ ■ 1 U 1 / ♦�• / 1• l l ` I I 1 1 1 1 1 j 7-4 1 1 1 1 1 r----------■- ■ 1 ° 1 J Cn / / 9-1 / / •1 ♦ j l l 4 I _J I I 11 I 6469 SF 11 I ■ I 9107 SF , •• �F . ♦ •, l l l , I I I I 1 . ,9-2 h� I c1 III I > L / / / l •• 8 • ' i l \4P I 1 1 I I I I 1 I I �, ■ 1 1 !, ■ Sz5o SF 1 1 10-1 l l l 1•• R ♦ \ / l l l l ' 1 I I I 1 Lc) 1 5250 SF ■ 1 1.., co W ■ ill I 1 (, j - 6788 SF / / •� , ., 8 '' / •• / / / / / 4 / -- I I I " ■ _ 1 Z \ / / 1 " ------ Q / • ..:. • •1 / / / /l l / // /l � �\\ _ 4pl ,\19-4 JI W Y 0 1.1 814 •� / 5249 SF � _ I r -■-� : , I III N I Q O 6p // ss,5 SF // ••/ ♦ l • 1 rl l / 18-4 / / /// `�'_- �I I ■ ■ 18-2 O 7 / / ��`\.: . ��` SSMLu H-5 1,�, /l /l /l l / 4P � Ill 4pl l 1 R / 5418 SF / / / - ■ :r : 5250 SF co Lu 12-1 , ♦1 �FqS l l l •1 / l l t7-4 / l \\-- I 5250 SF ■ 1 1 if J 6615 SF / 11 - - - \�N Sj ♦ / 1• / / l ( 4P/ I I W ■ III I l • \ 8w \ 1• , / 5588 SF , / // / // / 7 O r Q - - ----J h / / / / / • -' .. ;. .a / • / / / / / / L--------- w - - W w 13-1 / •1 / 1 / / 16-4 / I - - - ■ -.- --- 1 6615 SF / / •11i .?t'..' 8 \ \ ••/� / 5757 SF w - sp l • �- �.. , l l 111 / 11 �s� / // 15-4 / i i l 1 1 ■ Z i i 1 I 1 ~ pl l I l l l / 1 g J / ♦ / 5926 SF / 1 ■ O 1 17-2 I 1 1 I � U / / 14-1 / w ` / // / / � I I I m ■ 5250 SF I Ill W Lu / / 7114 SF / • / / / / , 12-4 ■ '':, I I I II Z O / /: •A y / 1• / / / / 14-4 N _U 5250 SF ■ I I W' l 4p/ / l / Q0 / •1 �� 6065 SF / O I I ■ I N O d / l / l l:. '� / 111 / • *,• / / // / 1 0 1 ■ 1 Z I -■------ - N I -- - - 0 ��•• • �\, \ \ 2 8 ,.• \�\J C 11•4w, / l // 22157 SF , -------—■- uj --------� I:a:: I I ANAL 1-2 / l/l �•• l s86 / �1• // 1 r ■ W ■ 1 - �SS� 7105 SF / / 11/• l 8w l •1NO ■ 1 I ■ ,e-2 1• 13-4 ■ 1 i 1 ■ 5250 SF • '' / 1 0- 2-2 / / / ••• / \\ _ \ 'v �, 1•• 5250 SF ■ •( ■ 9 •_. j L\ ( SSMH-6 • ■ - - - 6615 SF / / 1• / '>. I'I/• 1 I O I ■ I W I 1 f7 • � ' � ` ` �,.. • I M I ___ ■ I _ 108 1 3 .. / / 1/• •• O ■ 16060 SF Ill 3-2 6615 SF / 11 / 11 ._i ■ ;:*: 1 0 9� �pP \ / / / / / 11• \ 8w I L_ •1• ■ 1 ... ■ 1 n ' w l I l Woo �� r :: - 4pL•1• ■ ■ I I 12 {( ERG 6615 SF / / 1 l 8w '. CI3Q _2Jr `,�♦ \ ■ soaa SF II z �� / \4p /l l/ l 11• R 2 88� �11• SSMH-8 ■ I �� 1 I 1 I 665152E / / ••• / / / 8w I ■ -__-_ 1 - 1 I • • 6-2 / / •At 6615 SF / •••/ / \. .,. III I u u .• • 4p/ \\ / / / / 7-2 / / / ••1• _ 0000 8 C/3o \ ill 1 / I 1 1• S' s �� III ♦ \ G/ O \ • �•/•114-2 Art,* • \,. / \ \ \\6 SF .3 \ co ,V 4p/ \Jl /l /// // 6615 SF // 1111 / \� ♦\\SSMH-7:' :.. ...r \\ ��\\ _1 • OU�/T4p/ Jl / / / // 6615 SF / // 11.1 / > > ♦ \ \\ (\� / / +• / --\ \ \ \\ \ I I IIII S l 11 / l • �� I `,i I w m OV' /1rn' �VO/I/ A \ \ // ,/ 1l)-2 11• / / • \ \1 \ \ ill N Q to GS V V V p\ / / / 6615 SF� 1� 71* 1 O II I v' <& �23 N0. J / / / �`�� / 7 2, / / , 11-2 42�� 4p/ J l / / 5390 SF I I I 1,6352E 1 I 1 1 ''. oU 0 go 12-2 I , , o ill g_ 8127SF 1 I I I '`• oz ° o wZ 4p/ 0 � J • � I � (n o ti I w "' N> o sN -u N ¢� C o UNPLATTED �� Ci O Z to —VI IT' > Ud OW y U¢ � ¢3 wj o c 3 Y' II Z �3 (n II 0 O I ® U z I` � ED W rn m N Q p}p Z W Cn H W O N N m O U < U Y Z O W W o- af af W i- i- W JOB NUMBER: N >O IDB2338 DATSEWER OVERALL SHEET NU-24 SHEET NUMBER: W 0 50 100 FEET � Lu ssmo w !w , �// SEE SHEET SS.2 1 co I 1 II i ids 1�t7 idt7 I z It Keyed Notes I I I `' N I 1 co I 1 y --- 1. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN WATER LINE I n I m w AND NON-POTABLE LINE. SEE WATER NOTES 2 & 3 ON SHEET C1.1. w --- 2. CONNECT TO EXISTING SEWER -VERIFY AND MATCH EXISTING I I N z �� I INVERT ELEVATION AT POINT OF CONNECTION PRIOR TO START OF W CONSTRUCTION - NOTIFY ENGINEER IMMEDIATELY IF PLAN 1 t I I I .. �: DISCREPANCIES ARE NOTED. I 1 4-3 1 1 3-3 1 1 2-3 1 1 1 1-3 1 W 1 M 5260 SF 5250 SF 5250 SF 1 5664 SF 1 1 II k fAI I 1 1 I I I 1 1 1 I I I I 1 1 1 � 1 1 J I 1 I 1 1 ,� o I Lq I 2.00' Notes I 1 � � zco v "vZc" 1 v zco 1 1 v ;cr I cJ N ri J � N r; -i -i 1 N o ,i; N o W 1 1 o W 1 1 1. SEWER MANHOLES SHALL BE 48" DIAMETER ECCENTRIC STANDARD (O OD Q1 N N N N - ti Lq N - N - L--- o cl a d N N I M J MANHOLE TYPE A PER THE ISPWC STANDARD DRAWING SD-501. 63.66 OF 8 SDR 35 PVC @ 0.723/° 1 1 1 1 I 10'MIN. INSTALL MANHOLE FRAME AND COVER PER ISPWC SD-507 AND -X 1�. ,9.a4 �---- 4IE:2580.42 4"IE:2579.96 4"IE:2579.54- ® � 4"IE:2580.85 � I MANHOLE COVER PER ISPWC STANDARD DRAWING SD-508. I FG:2586.85 FG:2586.42 FG:2585.96 FG:2585.54 co V1 2. INSTALL STANDARD SEWER SERVICE "TYPE-D" PER ISPWC SD-511. 1 1 INSTALL STANDARD SERVICE MARKER PER ISPWC STANDARD 1 I DRAWING SD-512. ALL SEWER SERVICES SHALL BE 4" OR 6" PVC EXISTING SEWER w 8W 81"0 0 8w N.GARBO AVE. 8w 8w I SDR 35, D-3034 AS NOTED. SEWER SERVICES WITH LESS THAN 33.27'OF 8"SDR 35 PVC @ 0.721%ne 1 1 N 1 18-INCHES OF VERTICAL CLEARANCE FROM POTABLE WATER SHALL 2+00 3+00 i S�� 3+77 83 USE C-900 PVC WATER CLASS PIPE. , 1 N 172.91'OF 8"SDR 35 PVC @ 0.400% 3. 8" GRAVITY SEWER MAIN SHALL BE PVC SDR 35, ASTM D3034 PER 1+00---I N �� 1 9 SSMH-2 1 - S I E 2 YO SEWER LINE A � �� 1 THE CITY OF MERIDIAN STANDARDS. 1 1 SSMH-1 ...: :. - °o 4. SEWER STATIONING IS BASED ON THE SEWER CENTERLINE. EX-SSMH I 4"IE:2580.65 4"IE:2560.17 : 5. CONTRACTOR IS RESPONSIBLE FOR INSTALLING SEWER SERVICES 1+00.00,0.00 I -FG:2586.65 ---- -FG:2586.17 5-FEET BEYOND JOINT TRENCH SEWER EASEMENT. CONTACT DICaLINE RIM:2586.54 ® o ---- 1 6. SEWER SERVICE STATIONING, OFFSETS, LENGTHS AND INVERT 8"IE IN:2572.07(S) I��p o ( z 1 I z 1 j ELEVATIONS ARE IN REFERENCE TO THE END OF THE PIPE ON THE 48-HOURS N 1 I � �, � � � I `•' � m 1 1 BEFORE DIGGING to J e I I M e N LOT. INTERMEDIATE SEWER SERVICE PIPE INVERT ELEVATIONS C7 tq N W r) u, N "! W I 1-800-342-1585 or; to Z I ARE PROVIDED AT THE 10-FOOT PUID EASEMENT. I , I + I 1 7. ADJUST WATER METER VALVES AND METER TILE LID TO MATCH I I `" I w l z FINISHED GRADE AND SLOPE. o I 8. ADDITIONAL FITTINGS MAY BE REQUIRED FROM THOSE SHOWN ON 2-1 1-1 �� a 1 1 THE PLANS - IT IS THE CONTRACTOR'S RESPONSIBILITY TO I N N I 3-1 I 5421 SF 10631 SF �� J 1 Z 7007 SF 1 I 1 L___ DETERMINE ALL NECESSARY FITTINGS REQUIRED TO CONSTRUCT O 12.50' _ _ THE PROJECT AND INCLUDE ALL WORK AND MATERIALS IN THE J to 1 I 1 I I I �' PROJECT BID - NO SEPARATE PAYMENT SHALL BE MADE. J > I a I 1 1 1 1 F------------------------ F_ - Q I 1 I 1 1 2.00' I 9. CONTRACTOR SHALL ASSESS THE PROJECT SCOPE OF WORK AND m - 1 ALL EXISTING CONDITIONS PRIOR TO BID, AND INCLUDE ALL WORK U _ Z II 1 1 � 10, (INCLUDING SURFACE RESTORATION) IN THE BID. Q I � - --- MIN. I 10. - 1 I 1 PROVIDE ALL TEMPORARY IRRIGATION DITCHES AND PIPES AS LLl O � � 1 REQUIRED TO COMPLETE THE NEW IMPROVEMENTS ALL EXISTING DITCHES SHALL HAVE TEMPORARY REROUTING PROVISIONS SUCH 0 00 2 2PI o / Lu THAT THE FLOW OF IRRIGATION WATER, AND DRAINAGE OF Q SURFACE WATER ACROSS THE SITE REMAIN UNINTERRUPTEDLIU 00 m THROUGHOUT THE DURATION OF CONSTRUCTION. J LU 11. RETAIN & PROTECT ALL EXISTING UNDERGROUND UTILITIES - F I PROVIDE TEMPORARY SHORING AND SUPPORT AS NEEDED TO ------- ui RETAIN AND PROTECT WITHOUT DISRUPTION - NO SEPARATE z o SEE SHEET SS.2 PAYMENT SHALL BE MADE. 10 �SS�ONAL ENG� SEWER LINE A - STA 1+35.26 TO 3+77.83 �� ��G\STERFO 2 0 30 60 FEET 1 0 8 1 3 Ads TF OF S K ER\�� • • . . • . . .. :. .. .. .. .. . 0+80 1+00 2+00 3+00 4+00 4+20 • co .. C\l co • 2592 y ti 2592 co N O p Ln N LnW CD O ti CDL N to �O M O Z = O N Z O p L7 Lf) N 0 0� CO) p N O W W O r N N H w U) cm O0 = O N Z - 0 + a s W !Y 00cn ti W w W z a U) M co 00 co 2588 APPROXIMATE EXISTING 2588 g� GRADE @ PIPE ClL g? oN 00 zQ 0 U� �Z 1 I W 0 �D I I !q o 0 2584 2584 of FINISHED GRADE @ PIPE CIL Z .o 'Y �U aW O jU O zD 5� '-2 + oa ow I I rK 2580 2580 0 w3 I I � I I YY O o3 Z N 2576 2576 r XISTING SEWER Lu 3.27'OF 8" SDR 35 PVC @ 0.721% O¢ U � °° w � w m Z11ODof 0.400°/ L o � } 72.91'OF 8 SDR 35 PVC ~ w Y w Q U Y Z L_-- --- a d wd1� ___ c W 2572L_J 2 VERTICAL SCALE: "=3' 2572 z JOB NUMBER: 8+35.26 IE 2 72.31 63.66'OF 8"SDR 35 VC @ 0.72 % 'Z I DB2338 FIELD VERIFY AND ATCH EXIS ING DOW STREAMS WER SLOF E DATE: 2-8-24 2570 2570 0+80 1+00 2+00 3+00 4+00 4+20 SHEET NUMBER: W _j W SS. l Lm _ U) co \\ \\ 1 I I ---------------------- F \ \ 5-1 I I I \r---------------------- ;. \ \ mae SF I 96 I 5 \ I a 7o9s SF I I I \\ cli 77 I 523-3 SF N:726561.6312 I 111 11 I II 2_, I 2Sc9j 4P1 Keyed Notes I \ 5421 SF CD\\ \\ E:2453597.5937 \ \ 4"IE:2581.23 \\\ I 1. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN WATER LINE -----� I L J I �` \ \ 4"IE:2579.19 4"IE: '.X° a'`���0'`� 1 I \\ I - - - - - - 5-3 AND NON-POTABLE LINE. SEE WATER NOTES 2 & 3 ON SHEET C1.1 \ \ FG:2585.19 ��0 1°\° 1`� I L------------------\ -J 91335E 4P1---- \\ \ FG:2585.07 ��4P1� AND DETAIL 1/SS.1. 38.77LF4" 2%MIN. I Co w - - - - - - \ r --------------------� Ld ------- @ � / ------- > ±• 23107 SF CD / 15482 SF \\ \ \ // / s �`- N Q o .. -■ 34.15LF4"@2%MIN .\\\ / / _ ��/ / / ■ w I 2-3 I ■ Notes 4"IE:2579.14 \ 11 b' Q` \ I 5250 SF F_ ■ FG:2585.14 \ m Z w ■ - \\ ■ 1. SEWER MANHOLES SHALL BE 48" DIAMETER ECCENTRIC STANDARD N:726539.8609 / \ Q J . : �\ o-R z ■ MANHOLE TYPE A PER THE ISPWC STANDARD DRAWING SD 501. E:2453554.5514 1 \ "1 -�-----------------J ■ INSTALL MANHOLE FRAME AND COVER PER ISPWC SD-507 AND 4"IE:2581.13 / _ _ _ _ .' CO ■ MANHOLE COVER PER ISPWC STANDARD DRAWING SD-508. Lu cl \\ / SSMH-4 > > 1os31�sF � \\ ■ 2. INSTALL STANDARD SEWER SERVICE "TYPE-D" PER ISPWC SD-511. 2585 _ 48 �S C \ I ■ INSTALL STANDARD SERVICE MARKER PER ISPWC STANDARD 0,�. �'9S+ I \ I ■ DRAWING SD-512. ALL SEWER SERVICES SHALL BE 4" OR 6" PVC _, T1 1+00 B,SO Oi/iC I 2s8s •' \\\ 2586 I . SDR 35, D-3034 AS NOTED. SEWER SERVICES WITH LESS THAN T - 18-INCHES OF VERTICAL CLEARANCE FROM POTABLE WATER SHALL s,A \ 5643E \\ '• r I ■ USE C-900 PVC WATER CLASS PIPE. ' I G / \ \ �� \\ ■ �p - /� 10' �\ \\ I ■ 3. 8" GRAVITY SEWER MAIN SHALL BE PVC SDR 35, ASTM D3034 PER \\ \ I sOo , MIN. � \ --------------\�---J I u `� THE CITY OF MERIDIAN STANDARDS. ' 4"IE:2578.86 E' - FG:2584.86 \ 1\ c h� p 0 296.00'OF 8"SDR 35 PVC @ 0.405/o ■ 4. SEWER STATIONING IS BASED ON THE SEWER CENTERLINE. \\ 7_1 ova \\ \^ry ■ M 5. CONTRACTOR IS RESPONSIBLE FOR INSTALLING SEWER SERVICES , \\ s7,z SF °4al*v< \� 5-FEET BEYOND JOINT TRENCH SEWER EASEMENT. ° °° o SSMH-5 °h' ti\ y°� gw 8w Bw o 8w 8w W. GLEASON ST. 8 �_ 8W W. GLEASON ST. gW gW ■ 6. SEWER SERVICE STATIONING, OFFSETS, LENGTHS AND INVERT a"IE:z578.7s 13g, 0,0 1199. o z � u ■ ~ ELEVATIONS ARE IN REFERENCE TO THE END OF THE PIPE ON THE \\ a F�2584.76 ;.': 1 121.54'OF 8"SDR 35 PVC @ 2.032% 3+00 `V _ - - 4+00 - - - - 5+00 276.00 OF 8 SDR 35 PVC @ 0.403/0 - 6t00 - _ _■ W LOT. INTERMEDIATE SEWER SERVICE PIPE INVERT ELEVATIONS 4"IE:2578.60 \ = ARE PROVIDED AT THE 10-FOOT PUID EASEMENT. CONTACT DMINE FG:2584.60 \ 0 1 SEWER LINE B 1 \ Do 1 SEWER LINE B 180, 1 ■ SSMH-3. . `� \\ ■ 7. ADJUST WATER METER VALVES AND METER TILE LID TO MATCH 48-HOURS h \ SSMH-2 ■ W FINISHED GRADE AND SLOPE. BEFOFE DIGGING L/ -J l ■ W 1-800-342-1585 v °�` w cv. \ - - - - - - - - - - - - - - - - - - - - - - (n 8. ADDITIONAL FITTINGS MAY BE REQUIRED FROM THOSE SHOWN ON 0 4"IE:2578.59 4"IE:2578.80 4"IE:2579.11 4"IE:2579.43 4"IE:2579.74 4"IE-2580.08 ■ 2584.59 FG:2584.80 FG:2585.11 FG:2585.43 FG:2585.74 � -- - FG_2586.08 --- THE PLANS - IT IS THE CONTRACTOR'S RESPONSIBILITY TO rFG: ---- ------ ------------ ----- --- "° .• :.• : -- -■ DETERMINE ALL NECESSARY FITTINGS REQUIRED TO CONSTRUCT A ^ W N ^ ^ ^^, ^ \ ■ THE PROJECT AND INCLUDE ALL WORK AND MATERIALS IN THE \ / \ \G t ? \G 4m + - \G T + - \G T + ? \G c" + \ \ / / \ A W Q1 / / \ ,,, o N N • N <„ N �„ , N �„ 1 ,,, Ll o PROJECT BID - NO SEPARATE PAYMENT SHALL BE MADE. \ / !?� o NOD m �" m CD a m �4 m co m cm / \ Ln -n "' i T w c T W c - w � ncl' c -n I ■ 9. CONTRACTOR SHALL ASSESS THE PROJECT SCOPE OF WORK AND z / \ a, - I 1 Z A P 0 Z A W � Z ? W � Z A W � Z A W co Z A W I ■ U O p _ c A - � _ � I o ALL EXISTING CONDITIONS PRIOR TO BID, AND INCLUDE ALL WORK J o N o p o �' I I " ■ INCLUDING SURFACE RESTORATION IN THE BID. I I o q \ „33, SF I ' > I I I ■ 10. PROVIDE ALL TEMPORARY IRRIGATION DITCHES AND PIPES AS �_ p 9-, s1a sF\\ OQ I �� REQUIRED TO COMPLETE THE NEW IMPROVEMENTS. ALL EXISTING () \ / / s1o7 SF \ /' 11-1 12-1 13-1 14-1 I I ,-2 I _ �/ ssls SF ssls SF ssls SF 71,a SF 7105 SF I ■ DITCHES SHALL HAVE TEMPORARY REROUTING PROVISIONS SUCH < U) Q \ / / \\ I/' \ Q I ----- ■ THAT THE FLOW OF IRRIGATION WATER, AND DRAINAGE OF Y - / / I I \ ■ SURFACE WATER ACROSS THE SITE REMAIN UNINTERRUPTED p Z \ ---\ / / I I I I / I I I I I I I I \I I ■ w CONSTRUCTION. THROUGHOUT THE DURATION OF � pp � \\ \\ \ / / // I \� ■ 11. RETAIN & PROTECT ALL EXISTING UNDERGROUND UTILITIES - W \ / I I I I I I I I I I I \ I ■ J PROVIDE TEMPORARY SHORING AND SUPPORT AS NEEDED TO Q m \ \ / I I I I I I / I I I / I I I I I I I I I T ■ \ \ \ / / / / I I \\ ■ RETAIN AND PROTECT WITHOUT DISRUPTION - NO SEPARATE W 00 PAYMENT SHALL BE MADE. ~ F 00 ---------� /\ L--------------------- L------------J L_---___::===J -L=_� -- ------J L------------J L-----------J -----------J L-- masaas PI 4PI p�-----4P� 4P----- � 4P1 4P1 4P1 ---- ----- -----4PT ----- 4P1 ---- 4P1 - Pt--� w W 0 11 SEWER LINE B STA 1+00 TO 6+60 �SS�ONAL ENG� N - �� ��G\STEREO /fiFF 0 30 60 1 0 8 1 3 FEET Ads TF OF S K ER\�� • . . . • .. . . 0+80 1+00 2+00 3+00 4+00 5+00 6+00 6+60 .. .. .. .• 00 .• • . . . .. co 2592 2592 • _ z w w ' fq7 WLq coo ti -cov CR Ocj ti N W m co M W O CD ti ti N C Ln N Q t o C 00 L7 P_ Z p .4 N N Lp N 0 Z 0 0 ow N LLY N N M Z Z Ln N W W a N C to <o LO _ N 0 y + �_ - - p p }a 2588 � O N Q Z O M inn N - W w y (0 co co 2588 moo W W M �CD LnZ fnM co co co z N � N W W APPROXIMATE EXISTING ool U :` - - GRADE @ PIPE CIL zG CO) + - - N N Q: co co K N 00 o 0 U 03 og z w 2584 2584 ° oz FINISHED GRADE @ PIPE CIL w w_r K U ZZ o 'o �U J W Q lo Ci o Z� 2580 2580 O ow or ♦ U¢ w3 o o c 3 O yY O o3 115.7 OF 8"SDR 35 PVC ° ~ Z 0 2576 2576 O 21 'OF8„S T35 pVC C 2.032% � z 27 .00'OF 8" DR 35 PVC @ 0.403% `° Q W rn " //�� Q O}0 Z co °D U) U w O N N m U v u Z m p w w � 2572 2572 L- a d o W HORIZOP TAL SCALE: "=30' z JOB NUMBER: VERTI AL SCALE:1'=3' 2570 2570 J ID62338 0+80 1+00 2+00 3+00 4+00 5+00 6+00 6+60 DATE:SHEET NUM NUMBER: W W W SS.2 Lm SEE SHEET SSA l- - r•. I \ � I I I I I I I 1 1 1 I I I \\ � o-� \\��\�\ --'-� --- \ \\ I _ -j- -- \ �\ \ • • .•r. :\ II \\\` 11 II II II I II I 1 I I I I II 1 \ \\ \\�\\\�>�'- - � '-- \\ \ ? -I- - ' -' _\ \\ � \\\ \ •: � _-� �_------- 4PI \ O 89 \ \ \ I I I - - - 4PI \ y\�' 1� \ �44PI:- _L44P1�4P1 \ - \\\\\ \\\ _- - -� \\\ \ 1'� \ 5250 SF \ I \ \ / / 4PI \ � G) �_ � I ,6-2Keyed Notes I 4P--- �4P1 4PI _ - s \ � s \ \ \\\\ 120S4 I - \ -____� \ eo \ \ \\\\ 5250SF y \ _ 1. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN WATER LINE I 4PI4PI s ___ \� ,- � \ � - 1 �� - I\ tAND NON-POTABLE LINE. SEE WATER NOTES 2 & 3 ON SHEET C1.1. 4PI - - \ ------- r \ \ \ \\\\ \` \ / - - \ \ NIO \\\\�\ \ _ \ ---J \ \ ■ 1 I �'' Notes \ \ Il l - 15-2 \\ \ ■I I I \ r \\ \\\\\ \ / \ -- 6044SF ■ 1 \\ 8-4 \ \ 13-4 \ \\\ \ \ \ �0 \ \ \ 22157 SF \ 5250 SF \ \\\ \ \ \ : \N• \ \ -o \ •. 1. SEWER MANHOLES SHALL BE 48" DIAMETER ECCENTRIC STANDARD ■ 1 1 14-4 \ \ \ \\\\� \ MANHOLE TYPE A PER THE ISPWC STANDARD DRAWING SD-501. ■I 1 1 1 17-4 757 S \� 5 2�F sons SF 1 \ \\ _, INSTALL MANHOLE FRAME AND COVER PER ISPWC SD-507 AND ■ 1 1 19-4 1 1 18-4 1 1 5588 SF 57s7 SF \\\ \ \ --- \\\\ \ \ \ __ \ 5418 SF \ - \\\\ •• \ ___ _ _ MANHOLE COVER PER ISPWC STANDARD DRAWING SD-508. ■II 1 1 1 5249SF 1 ■I 1 I I I 1 I I I 1 I � I I I \ I I I \ \ -- 2. INSTALL STANDARD SEWER SERVICE "TYPE-D" PER ISPWC SD-511. \ \ - / \ \ \ INSTALL STANDARD SERVICE MARKER PER ISPWC STANDARD ■I 1 1 + I I I + I I I � 1 I � 1 I � \ 1 I � I •; \ / \ \\ ■ 1 p I 1 A p p 1 A \� ? \ o \\ / \ \ -. 'p ; DRAWING SD-512. ALL SEWER SERVICES SHALL BE 4" OR 6" PVC ■ m 0 o p 1 Fn Cep o A 1 m 0 o A I I rn p0 o a I I in (e� o a 1 1 m Ce7 o A.__1 \ � \ / \� \ � SDR 35, D-3034 AS NOTED. SEWER SERVICES WITH LESS THAN Ncn A N NON ? 1 N Noy^ a 1 ,�, N �„ - \ N �„ \ V \. \ o A 1--- N a A I ' -__---_---f --- W---------------- - ■I 1 N e o o c" e o o toe o o L" 1 �, e o o \\\\ ----- 18-INCHES OF VERTICAL CLEARANCE FROM POTABLE WATER SHALL ■ 1 1 N ; 0 1 1 N ; o CO - 0 1 1 N ; 0 1 1 CO ; g 1 w - g / \\ \\ 4PI_ __-4w -- 4PI o USE C-900 PVC WATER CLASS PIPE. ■I 1 CD ZAr � Z4 r mzA 1 1 zp z -___-- w 1 1 1 1 1 1 1 I \ GI Z \ G130 0130 G1��2 G13 ■ 1 ---- _--------J 1 L---_ ---- ____ ____� L---_ ____ ____ ____� I GI30 - \ 3. 8" GRAVITY SEWER MAIN SHALL BE PVC SDR 35, ASTM D3034 PER L---- \ 2588_GI3o � � J \\\\ 6306 SF \ ■ 1 4"IE:2580.04 4"IE:2580.26 4"IE:2580.44 4"IE:2580.64 4"IE:2580.84 4"IE:2581.04 I - \ GI30 \\� THE CITY OF MERIDIAN STANDARDS. ■ 1 -� +' ' w 250 ---- --------------------- --- FG:2586.04 FG:2586.26 FG:2586.44 FG:2586.64 FG:2586.84 - FG:2587.04 I .. \ ___----- / \ / w 1 ' �\\\\ I �\ \ 0 4. SEWER STATIONING IS BASED ON THE SEWER CENTERLINE. j, / 5. CONTRACTOR IS RESPONSIBLE FOR INSTALLING SEWER SERVICES 1 8w 8w AV8 w 8w 8 8w 8w 8 aw w aw 8w aw _ �w gw 8w _ � / \\ \ / \\ \ 5-FEET BEYOND JOINT TRENCH SEWER EASEMENT. 1 1 1 _ z 1 0 �° '-\ �4"IE:2582.27 \\\ J\\� 6. SEWER SERVICE STATIONING, OFFSETS, LENGTHS AND INVERT W j - 7+00 - - 1 8+00 - 1 -9+00 - 180° - o - �// 10+00 - 286.84'OF 8"SDR 35 PVC @ 0.403% 11+00 N - - - 12+00 4 'oo Fc_z5ss\\\ \\� - i � / ELEVATIONS ARE IN REFERENCE TO THE END OF THE PIPE ON THE S S sS- 8 S- 8S / �\\\\\\ \ LOT. INTERMEDIATE SEWER SERVICE PIPE INVERT ELEVATIONS 1 296.00'OF 8"SDR 35 PVC @ 0.405% SEWER LINE B 1 / W. GLEASON ST. 1 1 -; ` . / / N �26pgs \\� \ _ -� / CONTACT DICLINE 2586 1 2587 - o / E'2q s 152�'�i ---- ------V ARE PROVIDED AT THE 10-FOOT PUID EASEMENT. 48-�"�OURS W - SSMH-7 38o9�F48?427��> ` 7. ADJUST WATER METER VALVES AND METER TILE LID TO MATCH BEFORE DIGIANG / 2 r °M/ - \ \ / W f N \ FINISHED GRADE AND SLOPE. - ;.I'•�•I S G S O 4'� 1 800-342 1585 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . .4"IE:2582.12 2$83 \ \ \ ■ 4"IE:2579.86 4"IE:2580.05 4"IE:2580.30 4"IE:2580.55 4"IE:2580.79 4"IE:2581.04 4"IE:2581.29 4"IE:2581.53 4"IE:2581.81 FG:2588.12 \ 32/ \ \ / \ 8. ADDITIONAL FITTINGS MAY BE REQUIRED FROM THOSE SHOWN ON \ 1- \ \ I \ ■ fFG:2585.86 FG:2586.05 FG:2586.30 FG:2586.55 FG:2586.79 FG:2587.04" FG:2587.29 FG:2587.53 FG:2587.81 �� - --�- -1-' \ \ \ THE PLANS - IT IS THE CONTRACTOR'S RESPONSIBILITY TO F------ ------------ -------------I ------------ ---------/L -1 L------------ -------------1 ------------ --------��--� 4;m2 I / \ i (p� �,, -A--- \ ,- L DETERMINE ALL NECESSARY FITTINGS REQUIRED TO CONSTRUCT 36.50 LF 4" I I I I I I ___ _ N 7 p m + p A Aim \ 2 ? (n o ? ; T ? - 1 ' - �+ P A o 1 \ 13-2 THE PROJECT AND INCLUDE ALL WORK AND MATERIALS IN THE @ 2%MIN. 1 ,�, �, N ,�, �„ to I �, �„ t�, I ,,, �„ I ,�, Z, -4 I ,�, 1a + I ,�, �„ + I ,�, Ln + --I' I - -m o 1 \ \ \ 11655 SF ■ T o G V T o p 0 T o p GJ T o p Q1 \ T o p co T a p ? T o p 0 T o p co -- N ?,-n tp \ \ -\ / 6+59.76,36.50'R I 1 1 1 I I N I U I ==f -I'� ,r - p N a l I \ \ / PROJECT BID - NO SEPARATE PAYMENT SHALL BE MADE. ■ w n cn T vNi �+ T vNi �+ T \ v �+ T " r- r vNi rr'I r 10 rr'I r _= ao Z \ \/ ) - Z 4"IE:2581.89 w w I tb I tb \ I , tb I tb I w p I w o _ _r _ ■ 00 z A N z A N z p w N z p � \ ry to z a w to z a w �, z a w �, z a w( m �` \ \ \ \ / / /- 9. CONTRACTOR SHALL ASSESS THE PROJECT SCOPE OF WORK AND U O I I� I I I I v m 1 1 1 o cn oo �, o �, is rn rn e° rn \ \ \ \ / / J ■ o o I o o I \ U o I o o I A g I N I I o l I I \\ \ / / ALL EXISTING CONDITIONS PRIOR TO BID, AND INCLUDE ALL WORK J ■ z z I � I J X I I I I 1 I I \\ \ / / /// INCLUDING SURFACE RESTORATION IN THE BID. > ■ I I \\ I I I \ 10 I I \\ \ // �/ / O p 0 ■ I I I \ I I I \ III 1 I I \\ \ -' ,/ 10. PROVIDE ALL TEMPORARY IRRIGATION DITCHES AND PIPES AS - m - l2-2 1 1 3-2 4-2 1 5-2 1 1 6-2 1 \\ 7-2 1 8-2 1 9-2 1 10-2 I I1 1 -\- r U � 1 1 1 „-2 I I 1 / �� \�' REQUIRED TO COMPLETE THE NEW IMPROVEMENTS. ALL EXISTING Z 775 SF 6615 SF 6615 SF 1 6615 SF 1 6615 SF 1 \�6615 SF 1 6615 SF 1 6615 SF I 6615 SF I I\ \ 1 5390 SF 1 / �, \ \ \ 1 Q Y Q ■ I I I \\\ I I I \ C1 I I \ I I 1 1 1 / I \ \ \ DITCHES SHALL HAVE TEMPORARY REROUTING PROVISIONS SUCH 0- I I I \\ I I I \ti'I 1 1 \\ I I / I \\ \ I �- j THAT THE FLOW OF IRRIGATION WATER, AND DRAINAGE OF 00 0-�, I I I \ I I I \ I I I I 12 S \ \ I I I SURFACE WATER ACROSS THE SITE REMAIN UNINTERRUPTED Lu ■ I I I \\ I I I \ 1 j 1 1 1 I e127 SF I \ O 00 ■ I I I I I I I I I I \I, I I I I I \ I 1 1 I �� I I I / I \ � I I I I THROUGHOUT THE DURATION OF CONSTRUCTION. m2 ■ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I �y/ 1 1 1 1 1 1 \ I 1 1 1 1 /1 I // I \ �\� 11 II / 11. RETAIN & PROTECT ALL EXISTING UNDERGROUND UTILITIES - Q ■ 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 \ 1 1 ,I 1 1 1 1 1 1 \ I 1 1 1 1 / 1 1 / �I-�\ \ \ I \----J PROVIDE TEMPORARY SHORING AND SUPPORT AS NEEDED TO W m ■ I I I - \ I / I I 1 1 I / I / \\� \ ® RETAIN AND PROTECT WITHOUT DISRUPTION - NO SEPARATE F J- L------------J L----- ------J L------------J \ ---J �____--------A L-------------1 L�-===--_-=-f�-_ J- L---------� ---�---------- - -'t� --- - PAYMENT SHALL BE MADE. F ■ --------------- _ ___ ---------- ------------ 5 5 ___ =47----- FF 4PI 4PI 4PI 4PI 4 4PI 4P 4P1� �P -- G -----4PI---- -4PI 4PI 4 4PI 4PI 4PI 4PI 4P 4PI 4PI _ 4 w w -- -- Y- -- - ----- ==------ --- = \ - z 0 O d �SS�ONAL ENG� N - �� ���\STEREO /fiFF SEWER LINE B STA 6+60 TO 12+16.10 0 30 60 1 0 8 1 3 FEET -Aos TF OF S K ER\�� • • • • 1) 1) .. . . 6+60 7+00 8+00 9+00 10+00 11+00 12+00 13+00 .. .. .1 2596 2596 .• •• .• • _ .. C\l co W • W • Z W Z cY� 6 fA v Z th M Z 0 .Jr ti O O cq U') CV N � O ^ N C N N w m 2592 _ o N _ 0 2592 Q w „ z z z 10 ti � o w www o o0 + off_ - w ti rn N + - - - - , p ti N r 00 00 a s O O O CO CV zJ to CO a z = N N Z Z� N I :ig W W 3 0 APPROXIMATE EXISTING co m co 0o zG 2588 GRADE @ PIPE CIL 2588 m N 00 Z Q 0 U 03 og z of 0 � oz FINISHED GRADE @ PIPE C/L K U ZZ O U'Y 2584 2584 1W O 10 Ci o Z� U d OW N ■ Yk T U¢ ¢3 N w O �3 2580 2580 O a0 O o3 Z O 86.84'OF 8'SDR 35 P C @ 0.403°/ + !A U 00 2576 '� 0. 05% - 2576 a z r V Cp < m z 00 w O N N m ' U Q Z M Q W W d L� Q a d o W ORIZONTAL SCALE:1"= 0' z JOB NUMBER: VERTICAL CALE:1"=3' 2572 2572 J ID62338 6+60 7+00 8+00 9+00 10+00 11+00 12+00 13+00 DATE: SHEET NUM NUMBER: W W Lm W SS-3 SEE SHEET SS.5 - - - - - F---------------- - I F-- ---- El- - I I 5 G r dti -J pill 10-4 N 5250 SF I a 11 1 I 1 1 I 19-2 "'5250 SF > l Keyed Notes7-4 0 W I 1 I 646F I 1 1 1 1 I I dt _ / 1. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN WATER LINE ------------J I I 1 I l l co w Z I 1 \�� / AND NON-POTABLE LINE. SEE WATER NOTES 2 & 3 ON SHEET C1.1. ---- ----------� z - - - - - - I I 1 59�F 1 i I I 1 I 11 ram_ dt L - - - - - - J -----� � I I I I 1 1I 2. STEEL CASING PER SW1 & SW2.0 ----------- ----- w 00 5-4 I 5757 SF I I I I I d uj uj I I Z I I 11 1 1 1 co I I „ * I I 4-4 I (n 9-4 I I I I !?� rn w 1 I H I I 5588 SF I I I I I I Notes 20-2 I I 5664 SF I I I cNr+ o 0 1 I m0 rn 5250 SF 00I I � r w _tg c I I I I 3-74 wT = ­4 I 1 0 12.50' N ? A 5418 SF o I I I N I 1. SEWER MANHOLES SHALL BE 48" DIAMETER ECCENTRIC STANDARD I I U I I ?? I I o �' I „ + 11 1 I I MANHOLE TYPE A PER THE ISPWC STANDARD DRAWING SD-501. •.•. ---- ------------J - - I 1 o w I I w I I I 1 2-4 I 2.00' -- - _ I I I rn 3 ' N I I I I 5249 SF 1 INSTALL MANHOLE FRAME AND COVER PER ISPWC SD-507 AND 4"IE:2581.60 -- nt(� w MIN. qj - - - - - - LO - - 2587 , - 46 � w � I '' I I c. MANHOLE COVER PER ISPWC STANDARD DRAWING SD-508. ---- ------------ ry Q so F _ v Z o I 2. INSTALL STANDARD SEWER SERVICE "TYPE-D" PER ISPWC SD-511. FG•2587 4"IE 2581 75 �ii FG• 7s � I I I I 1 0,0 90, 2 SSMH-10 _ FGI2587.682 I --__ j 1 I w 3�rn INSTALL STANDARD SERVICE MARKER PER ISPWC STANDARD 1 °J 1 00 218.04'OF 8"SDR 35 PVC 0.400% 1 v ? p o I I N r>w 1 DRAWING SD-512. ALL SEWER SERVICES SHALL BE 4" OR 6" PVC I @ SEWER LINE C 3+00 a-IE:2582.02 I I o o w 1 SDR 35, D-3034 AS NOTED. SEWER SERVICES WITH LESS THAN _ _ g� �gS o _ FG:2587.47 --__ W o 1 21-2 (SSMH-9 0 z 1 169° _ N : ., -a"IE:2582.32 I ? I I 18-INCHES OF VERTICAL CLEARANCE FROM POTABLE WATER SHALL 5775 SF a W. CHOLLA HILLS ST. FG:2587.27 I USE C-900 PVC WATER CLASS PIPE. M8 M8 M8 M8 8 M8 M8 M8 h- 4+pp 1 t `'' '' - 4"IE:2582.24 3. 8„ GRAVITY SEWER MAIN SHALL BE PVC SDR 35, ASTM D3034 PER Ma _ FG:2587.06 THE CITY OF MERIDIAN STANDARDS. - -----JI t 1 - - - - - - - - - - - � Ma 2Q.25,0- _ 2S8 ._••,°•-• � _ _ •' ' ''' 8 SEWER STATIONING IS BASED ON THE SEWER CENTERLINE. a dti dt dt 2588 " Ma 5 p-60s� 5+00 1 0° 50 @2"� M CONTRACTOR IS RESPONSIBLE FOR INSTALLING SEWER SERVICES M a SDR 3 � ' .;••• 1 ° _ 34. LF ° ------------------- - ---------------------- ----- 5. _ Ma 9 4" I_- 5-FEET BEYOND JOINT TRENCH SEWER EASEMENT. , U� Ob 0� FOg _ _ .. _ Id9 Id9 d9 - - _Ma 6. SEWER SERVICE STATIONING, OFFSETS, LENGTHS AND INVERT SSMH-11 ,91599Z=M3LYM H o� - ELEVATIONS ARE IN REFERENCE TO THE END OF THE PIPE ON THE �Ma 5+32.28 -___ LOT. INTERMEDIATE SEWER SERVICE PIPE INVERT ELEVATIONS o ARE PROVIDED AT THE 10-FOOT PUID EASEMENT. CONTACT DICLINE 48-OF - Ma_Ma_ 7. ADJUST WATER METER VALVES AND METER TILE LID TO MATCH H�� ---___-_ dd9_Id9 �� - _ _ ; : FINISHED GRADE AND SLOPE. 8FBEF� - NC.� _Id9 8. ADDITIONAL FITTINGS MAY BE REQUIRED FROM THOSE SHOWN ON _Id9 0� 1585 00 - THE PLANS - IT IS THE CONTRACTOR'S RESPONSIBILITY TO _I DETERMINE ALL NECESSARY FITTINGS REQUIRED TO CONSTRUCT �9 Id9 THE PROJECT AND INCLUDE ALL WORK AND MATERIALS IN THE _ PROJECT BID - NO SEPARATE PAYMENT SHALL BE MADE. Id9 Z 9. CONTRACTOR SHALL ASSESS THE PROJECT SCOPE OF WORK AND U O ----___ ALL EXISTING CONDITIONS PRIOR TO BID, AND INCLUDE ALL WORK J U) (INCLUDING SURFACE RESTORATION) IN THE BID. j 10. PROVIDE ALL TEMPORARY IRRIGATION DITCHES AND PIPES AS 0 O Q REQUIRED TO COMPLETE THE NEW IMPROVEMENTS. ALL EXISTING U J DITCHES SHALL HAVE TEMPORARY REROUTING PROVISIONS SUCH Q U) Q � � I / n � , W Y 0 ^� THAT THE FLOW OF IRRIGATION WATER, AND DRAINAGE OF O SURFACE WATER ACROSS THE SITE REMAIN UNINTERRUPTED p IY Lu THROUGHOUT THE DURATION OF CONSTRUCTION. Q 00 11. RETAIN & PROTECT ALL EXISTING UNDERGROUND UTILITIES - W PROVIDE TEMPORARY SHORING AND SUPPORT AS NEEDED TO W 03 m SEWER LINE C STA 1+00 TO 5+32.28 PAYMENT SHALL BE MADE.RETAIN AND PROTECT WITHOUT DISRUPTION - NO SEPARATE ~ _j 0- 0 30 60 U FEET z O N o �SS�ONAL ENG� C,\STERFO 10813 0+80 1+00 2+00 3+00 4+00 5+00 5+60 s� �o 2596 2596 ,posy OF R c�So� u� . t zow o O o w w 00 : • M• 0 O O 0) O O O N N O N � C O M O co M• M• • rn 2592 c 06 N N N c c O w o 2592 • • • N Ncu0j Z Z O Z O 1` N N 0 0 N O , W W W W O N Z = p N ; O O Op fn � Qr CO e0 e0 -e N W W 2 N N CO Z APPROXIMATE EXISTING � N _ w • GRADE @ PIPE CIL N m 00 00 + �-Q. co 'IT 2588 2588 Q =_ to UU K o O a� a a< z FINISHED GRADE @ PIPE CIL z U O O 3� g �m 2584 GIR 2584 U 30"DIA. og CLASS V RC az Z �'� SEE GI. o Ln 61; ih >� c M 0.606% W W J 2 6.25'OF 8"SDR 35 PV @ z K U Z o �U 2580 218.04'OF 8' SDR 3 2580 Jw aLL ,O 1� CID zo NU 0 LF STEEL.CASING PER SW1 &SIN27 N ow M Y k U¢ + w 3 HORIZONTALSCALE:1"=30' VERTICALS ALE:1"=3' 3 2576 2576 0+80 1+00 2+00 3+00 4+00 5+00 5+60 1­ Z U3 O U Z Q Ln - W � rn� 1• /� Q °}0 Z °D w U oo L O N N m U Z ♦♦ p W w d W V a 0- o W Z JOB NUMBER: J IDB2338 DATE: 2-8-24 SHEET NUMBER: W W Lm W SS.4 SEE SHEET SS.3 SEE SHEET SSA \ /• // / / / I iuv iuv� iuv iv lav IqV IdV Idv�IdV �J I \ / I-----------I F-- -----I r --- -I F-----------I I F------- / Notes Keyed y O IF o / l I I I I I I I I / I � I x 1. MAINTAIN 18" OF VERTICAL SEPARATION BETWEEN WATER LINE "' O i AND NON-POTABLE LINE. SEE WATER NOTES 2 & 3 ON SHEET C1.1. 13-4 1 1 12-4 1 1 11-4 1 1 10-4 1 1 9-4 1 m 5250 SF 5250 SF I 1 I > I I 2. T-TYPE CLEANOUT PER S1. � 5250 SF 5250 SF 5664 SF lVQ / I 1 1 1 I I 1 1 1 I m r o ' 3. STEEL CASING PER SW1 & SW2. / I W I \ l / ai a I I A I cn m (� rnW I mC� rna�o I 1 m (P� rnrn I m (P7 � � 1 mCP7 � � I -1 1 i \/ N e o W I N \ O W rn N \ O W I N \ O W 4' It.2582.12 70' / / a _� -n o _� -n � r �„ I co r N I r � I I cozA I ozA � I I ozA � I cwz � � I I iazA � 10' FG:2588.12 M/q/ / / I m = r m = r I P. r I cor I co r / 1 MIN. 5390SF N.,726055.4115 I y •,`yr, L ---- ----� L---- � I ---- Notes E:2454582.2499 11+00 - ---- - :` 1 4"IE:2582.89 4"IE:2583.09 / 4"IE:2582.99 4"IE:2582.81 4"IE:2582.50 ' .' 31.40 LF 4" FOR FG:2588.89 FG:2589.09 FG:2588.99 FG:2588.81 FG:2588.50 1 48„ DIAMETER @ 2%MIN. I $ - - - - - - - - - - - - N: 726458.9287 STANDARD :... . .•x. k .. SEWER MANHOLES SHALL BE AMETER ECCENTRIC 4"IE:2584.15 �WFR�//(F 3 '1 E: 2454605.5525 MANHOLE TYPE A PER THE ISPWC STANDARD DRAWING SD-501. \ \\\\ SSMH-7 : 1tJ1° o D o� 161° 0 2 ° 1 INSTALL MANHOLE FRAME AND COVER PER ISPWC SD-507 AND S88 �, 8 I E:2579.23 SEWER LINE D 315.71'OF 8"SDR 35 PVC @ 0.403% N 4+00 �� 900 T-TYPE CLEANOUT MANHOLE COVER PER ISPWC STANDARD DRAWING SD-508. " _�$ 5+00 5+06.28,0.00 2. INSTALL STANDARD SEWER SERVICE "TYPE-D" PER ISPWC SD-511. \4"IE:2582.27 - - - - - - - - S FG:2588.27• \ o - - u o z ° INSTALL STANDARD SERVICE MARKER PER ISPWC STANDARD SSMH-8 N. BORGNINE AVE. SSMH-9 °�° 2 DRAWING SD-512. ALL SEWER SERVICES SHALL BE 4" OR 6" PVC �^ 8 W 8W 8W 8W 8W 8W 8W 8 8W 8W m Al �a SDR 35, D-3034 AS NOTED. SEWER SERVICES WITH LESS THAN o ^ ?' o�o�;r 18-INCHES OF VERTICAL CLEARANCE FROM POTABLE WATER SHALL :. .0 tiyc 4"IE:2582.62 a^IE:z58z.85 - - - - - - - - - - - - - - USE C-900 PVC WATER CLASS PIPE. / / 4"IE:2582.40 4"IE:2583.01 4"IE:2582.91, 4"IE:2582.71 4"IE:2582.51 4"IE:2582.30 j / FG:'588.62 FG:2588.85 FG:2589.01 FG:2588.90 I 3. 8" GRAVITY SEWER MAIN SHALL BE PVC SDR 35, ASTM D3034 PER , FG:2588.40 ---- ---- FG:2588.71 FG:2588.51 FG:2588.30 / � I F -- ---- ----� r- - ---- I ---- ----� F---- -- - --- ------I I THE CITY OF MERIDIAN STANDARDS. 1 �o a A A , 1 I a ^ o + I I o + 11 A o + 1 I I I I i 4. SEWER STATIONING IS BASED ON THE SEWER CENTERLINE. � F m oZ^ � I _ Nod I m N �, „ I I _ oNm _ N ��„ -4 I I _ � � n+a I � °° � ------ // .e, M� 'i. / / I N � ti m I � � m � � r^ e c) m I Fn o au r^ !Z = P I/ 40 H N / Tao I 1 N �_ T oo N r a, N r a, N r .. ' .5 90 N '` iv I 5. CONTRACTOR IS RESPONSIBLE FOR INSTALLING SEWER SERVICES _------- // � j l I I CO Z O CO Z A A 1 0o Z A A oo Z A A 1 I ou'o �'1 I cr T I er 17 / I �, I 1 " = o ? ? A CD co z A I z a P 5-FEET BEYOND JOINT TRENCH SEWER EASEMENT. �, 1 1 �, 1 I 1 1 I I A . 1 I I I CONTACT DMINE o I o I o N o I A o I W o p o I 6. SEWER SERVICE STATIONING, OFFSETS, LENGTHS AND INVERT 48-HOURS i ELEVATIONS ARE IN REFERENCE TO THE END OF THE PIPE ON THE o I I I 1 1 1 I I 1 1 1 I I I BEFORE DIGGING 49.57'OF 8"SDR 35 PVC @ 0.400% I I I I I LOT. INTERMEDIATE SEWER SERVICE PIPE INVERT ELEVATIONS / I I ARE PROVIDED AT THE 10-FOOT PUID EASEMENT. / / I I 16-2 17-2 I 18-2 19-2 I I 5250 SF 5250 SF I 5250 SF 5250 SF 5250SF I 2152 15-2 I I I I I I I I 6044 SF I I I I I I I I 1 T" I 7. ADJUST WATER METER VALVES AND METER TILE LID TO MATCH 13-2 / / / 1 1 1 I I i FINISHED GRADE AND SLOPE. 11655 SF I 11 I 14-2 I I i 8. ADDITIONAL FITTINGS MAY BE REQUIRED FROM THOSE SHOWN ON 6306 SF / I I I I I I I �S� I I THE PLANS - IT IS THE CONTRACTOR'S RESPONSIBILITY TO z DETERMINE ALL NECESSARY FITTINGS REQUIRED TO CONSTRUCT (� O J I I q,�, I I I I I I THE PROJECT AND INCLUDE ALL WORK AND MATERIALS IN THE J to L`' I I I 1 1 1 I PROJECT BID - NO SEPARATE PAYMENT SHALL BE MADE. > �---------- J I L---- J I L-- ---I I L--- I / -----� L- ----� L------ L---------� O I I 9. CONTRACTOR SHALL ASSESS THE PROJECT SCOPE OF WORK AND U m 0 ALL EXISTING CONDITIONS PRIOR TO BID, AND INCLUDE ALL WORK Q Z ids - - idt// - ^�;dt idti --id i t�idti id ids��dt ids�-Idt � idt Ids id Q idt - � (INCLUDING SURFACE RESTORATION) IN THE BID. Q Y - / 10. PROVIDE ALL TEMPORARY IRRIGATION DITCHES AND PIPES AS Lu O 9 REQUIRED TO COMPLETE THE NEW IMPROVEMENTS. ALL EXISTING DITCHES SHALL HAVE TEMPORARY REROUTING PROVISIONS SUCH 0 000 2 THAT THE FLOW OF IRRIGATION WATER, AND DRAINAGE OF Lu Q Lu Q SURFACE WATER ACROSS THE SITE REMAIN UNINTERRUPTED m SEWERLINE D STA 1+00 TO 5+06.28 THROUGHOUT THE DURATION OF CONSTRUCTION. J LU Z 11. RETAIN & PROTECT ALL EXISTING UNDERGROUND UTILITIES - ~ 0 30 60 PROVIDE TEMPORARY SHORING AND SUPPORT AS NEEDED TO U FEET RETAIN AND PROTECT WITHOUT DISRUPTION - NO SEPARATE w w z PAYMENT SHALL BE MADE. o a �SS\0AL ENG� \STERFO 0+80 1+00 2+00 3+00 4+00 5+00 5+20 1 0 8 1 3 2596 2596 -p�s TF OF S K ER\�� p Z 0 Z O W • . _ M O • LLJ m _ I� ti ti • • • • • • J.W W M O �1'> p O L0 L N G ,� ' �• •• •• ZZ ZlAcn M ONE N pvti J M O O O pp N O N r � 1� H 0 N N • • . . • O ti 0 ^Ln O a0 •• •• .• 2592 ppp � ^ � ^ N = � NZ 0 xNOZZ 0 - 2592 N .• •• .• • O O 1� N N N � rL• W W W_ W W W • • • • co Oao - - - - - o N Z Z Z to 00 00 fq 1 C� 0 00 00 � • O + W W W W �•co oC co "v v 00 FINISHED GRADE @ PIPE C/L • co • 2588 2588 W ,n �o o0 _T 0 a APPROXIMATE EXISTING za GRADE @ PIPE CIL `m o Z. O O 1. 3 2584 2584 0 N 30 DIA. 0 zQ CLASS RCP SE G1.1 og 0 .z wD 0 �D � oti > �z r W w d Q' w K U z 2580 M 2580 U Q 0 315.71'0 8"SDR 35 PVC @ 0.4 3% N z in ■ >w Za ZZ 31.00'0 8"SDR 35 VC @ 0.42 % "3 r 2576 EL 5+06.28 2576 8"IE:2579.23 0 d0 Z o3 49. 7'OF 8"S R 35 PVC 0.400% HORIZONTAL SCALE:1"= 0. VERTICAL SCALE: 1"=3' C 2574 2574 O 0+80 1+00 2+00 3+00 4+00 5+00 5+20 + U Z W � rn 00 � 1• /� Q O}0 Z W °D �/♦ U � O N N m U Z 0 p w wdw IL 0- o W Z JOB NUMBER: J IDB2338 DATE: 2-8-24 SHEET NUMBER: W W Lm W SS-5 Lu Lu U)