Loading...
HomeMy WebLinkAboutLandscape Plan 6 ROOT FLARE TO BE AT SOIL LINE M PREVAILING WIND DIRECTION SOIL LINE G REMOVE DEAD/DAMAGED BRANCHES AND PRUNE TO INTERNATIONAL SOCIETY OF Z ARBORICULTURE STANDARDS; IMPROPERLY PRUNED TREES(AS DETERMINED BY THE 2"X 2"X 14 GAUGE SQUARE LANDSCAPE ARCHITECT)SHALL BE REMOVED TUBE POST 8'O.C. � AND REPLACED. DO NOT REMOVE MAIN L LEADER!! 1"X 1"X 14 GAUGE SQUARE RUBBER CINCH TIE 4A" TUBE SUPPORT BOTTOM RAIL 2"x 2"WOOD STAKE(LENGTH AS 5/8"X 5/8"X 16 GAUGE SQUARE REQUIRED)-DO NOT PENETRATE ROOTBALL. TUBE.SPACING TO BE 4-9/16" SEE NOTE 1. SET STAKES PARALLEL TO O.C. PREVAILING WIND. CO 1"X 1"X 14 GAUGE SQUARE REMOVE TREE WRAP TRUNK PROTECTION, `n TUBE SUPPORT BOTTOM RAIL of 00 AFTER INSTALLATION Ld Q U CONSTRUCT 2"EARTH BERM AT EDGE OF FIG K v ROOTBALL, FILL TREE RING W/MULCH,AS N SPECIFIED. 8"X 24" N Q 3"THICK MULCH LAYER, KEEP MULCH 3"AWAY CONCRETE FOOTING icy m O FROM TRUNK. $ H- NOTES: 4" FINISH GRADE 0 1. CONTRACTORS ARE RESPONSIBLE FOR SHOP DRAWINGS TO BE REVIEWED BY LANDSCAPE ARCHITECT o w /jam//�///jam// // ��V //V//�//// // /A/ COMMERCIAL SLOW RELEASE FERTILIZER BEFORE INSTALLATION. WROUGHT IRON GATE TO BE PAINTED W/ELECTO STATIC PAINT-COLOR AS Q v \///\�//\�// / �//j\ TABLETS DIRECTED BY OWNER. p W \ \\ VA VA/ /AAjAA V A \ 2. WELD PER AWS D1.1. 0- U O -III \ SIDES OF HOLE ROUGH&UNEVEN 3. FENCE PANELS PER ASTM A653. 4. FENCE PANELS TO MEET ASTM FD2408 STRENGTH AND POWDER COAT REQUIREMENTS. III BACKFILL WITH APPROVED TOPSOIL AND 5. FENCE PANELS RATED PER ASCE 7-05,90 MPH WIND. SOIL AMENDMENTS AS SPECIFIED. 6. 2"X 2"POSTS CAPS REQUIRED BACKFILL IN 6"LIFTS,WATER EACH LAYER, WIDTH WIDTH WIDTH WIDTH WIDTH TAMP LIGHTLY AS REQUIRED, BACKFILL WROUGHT IRON FENCE 3" DEPTH OF MULCH AT PLANTER OF BALL OF BALL OF BALL OF BALL OF BALL SOIL EVEN W/TOP OF ROOTBALL, BEDS 5' MIN. DIA. DO NOT OVER COMPACT!! 6 $ TREE RING SCALE: 1/4"= 1'-0" SET ROOTBALL ON NATIVE, UNDISTURBED SOIL =III-� - - NOTES: B 1"x6"CEDAR BOARD H ^ -III o j III - 1. REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP 2/3 OF ROOTBALL. REMOVE ALL NAILS,TIES,AND PLASTIC FROM - _- - - - - --_ - - APPROVED TOPSOIL AND SOIL ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY AMENDMENTS AS SPECIFIED BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. B 7" FINISH GRADE, - - - - - 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO ENSURE $x6"CEDAR TOP RAIL PER PLANS THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR PRESSURE TREATED WESTERNAFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE SECTION A-A' RED CEDAR POST PLANTER BED CUT EDGE WARRANTY PERIOD. 1 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE (TYPICAL AT TREES IN TURF AREAS) NOT TO SCALE ARCHITECT BEFORE PROCEEDING. 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT N MATERIAL. A A' 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING N G METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. $"x6"x8',#2 OR BETTER, NO 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. HOLE, KILN DRIED INLAND A' A' 8. FOR TREES LOCATED WITHIN ROADSIDE PLANTERS LESS THAN 8'-0"IN WIDTH, PROVIDE TREE ROOT BARRIER(DEEPROOT RED CEDAR TRIM #24-2 OR APPROVED EQUAL). LOCATE ROOT BARRIER AT BACK OF CURB AND EDGE OF SIDEWALK. ALL TREE INSTALLATIONS SHALL CONFORM TO ALL AGENCY APPROVAL REQUIREMENTS,CONTRACTOR SHALL VERIFY PRIOR TO ANY INSTALLATIONS. 8"x6"X6',#2 OR BETTER, NO A=LENGTH,AS SPECIFIED o HOLE, KILN DRIED INLAND OR PER PLANT SCHEDULE DECIDUOUS TREE PLANTING I RED CEDAR PICKETS,SPACE m 1/2"APART B=85%OF'A' 4 NOT TO SCALE 2"x6",#2 OR BETTER, + O DOUGLAS FIR RAIL,TOP RAIL SET 12"BELOW TOP OF POST. F ROOT FLARE TO BE AT SOIL LINE. MIDDLE RAIL TO BE CENTERED BETWEEN TOP PLAN VIEW FINISH GRADE PER PLANS AND BOTTOM RAIL. GROUNDCOVER PLANTING PER PLANTING PLAN PREVAILING WIND DIRECTION _ r')I� MULCH, PER PLANS, 3"DEPTH OVER ENTIRE BED. -III=III=1 =1 =1 REMOVE DEAD/DAMAGED BRANCHES AND 1I=11I 1 2"x6",#2 OR BETTER, DOUGLAS FIR RAIL, DO NOT COVER CROWNS OF PLANTS TOP RAIL SET 12"ABOVE FINISH GRADE PRUNE TO INTERNATIONAL SOCIETY OF _ =III=1 SOIL LINE a ARBORICULTURE STANDARDS; IMPROPERLY p TILL SOIL TO A DEPTH OF 12", BACKFILL WITH I APPROVED TOPSOIL AND SOIL AMENDMENTS,AS PRUNED TREES(AS DETERMINED BY THE N 1=1 :a 1=1 SET FINISH GRADE AS SPECIFIED LANDSCAPE ARCHITECT)SHALL BE REMOVED =1I1 I- TFTT - SPECIFIED. . =11I �. 4"x4",4"X6"OR 6"X6"PRESSURE /j\/\ j\j/ \ e Q AND REPLACED. DO NOT REMOVE MAIN -1II E = ///%/%j/\// '/ /\// SUBGRADE LEADER!! C14 //AA//AA//AA//AA//AA//AA/�A/AA/AA/AA/AA/ / o 1=1 TREATED WESTERN RED CEDAR POST _ WITH BEVELED TOP,SET 8'-0"APART RUBBER CINCH TIE E L E VAT I O N O.C. VV��j/�A��A��A��j/�A�\.�A��A/�A� - i�i i 1 iii iii li iii iii li ii '=III-III- II III III III III III III III, 2"x 2"WOOD STAKE(LENGTH AS 4"4" 4" CONCRETE FOOTING AS SPECIFIED REQUIRED)-DO NOT PENETRATE ROOTBALL. III d o a e SEE NOTE 1. SET STAKES PARALLEL TO 6"AGGREGATE BASE PREVAILING WIND. � a SECTION ° • NOTE: COMPACTED SUBGRADELL o . NOTES: 1. REFER TO PLAN FOR FENCE LOCATION. NO. REVISION/ISSUE DATE CONSTRUCT 2"EARTH BERM AT EDGE OF 2. PANELS OF FENCE TO ALTERNATE SIDES AT EVERY POST. SEE SECTION A-A'. p 1. ALL GROUNDCOVER PLANTS TO BE PLANTED ON CENTER AND IN A TRIANGULAR PATTERN. o o ROOTBALL, FILL TREE RING W/MULCH,AS 2 BEDS. CEDAR SPECIFIED PRE-EMERGENT PER MANUFACTURER'S RECOMMENDATIONS TO ALL GROUNDCOVER SPECIFIED.CD CjEDAR FENCE oQ0000000 -� ° 3"THICK MULCH LAYER, KEEP MULCH 3"AWAY 7 SCALE: 1/2"= 1'-0" 0000°°�E OF ��0� 811 , o FROM TRUNK. oo°°c��P \N SHpP►��� ��� N o o GROUNDCOVER PLANTING o * m�' •� � Knawwtmft below. n Call o ,g. 2 NOT TO SCALE _ .` nrA J W o IN ADVANCE BEFORE o o �" 4 U 0 CALL 2 BUSINESS DAYS ~ W ! PETWASIE v� 4 Oo EXCAVATE FOR THE 5 o A \ \ \ \ F DE - - pI/� �� YOU MARK MARKING OFGRADE, OR / / / / /X// V////\ / / / / °ice 000 Q Q W _ - //� //� I DQGIPQT® °IN�SC���O�Do MEMBER UTILITIESO G m VAj j j \ -i COMMERCIAL SLOW RELEASE FERTILIZER p� PET SIGN (ITEM#1203/ °oQooppp0000 j O - _ _// TABLETS >Hi KIMP �� 1204) 3 MATERIALS FROM THE ROOTBALL WHICH MAY LIMIT III III III REMOVE ANY PLASTIC, BURLAP, NAILS,OR OTHER - SIDES OF HOLE ROUGH&UNEVEN = D° T • �N D�®, ALUMINUM DOGIPOT® W z ROOT GROWTH p • BACKFILL WITH APPROVED TOPSOIL AND I JUNIOR BAG s :. �• •'+ �• CONSTRUCT 2"EARTH BERM TO FORM A WATER #1002-2 w WIDTH WIDTH WIDTH WIDT WIDTH SOIL AMENDMENTS AS SPECIFIED. O DISPENSER(ITEM Z •� • C• RETENTION BASIN, FILL BERM WITH MULCH,AS OF BALL OF BALL OF BALL OF BALL OF BALL BACKFILL IN 6"LIFTS,WATER EACH LAYER, c0 �1N ) w � �� �• SPECIFIED 5' MIN. DIA. TAMP LIGHTLY AS REQUIRED, BACKFILL v z z • •`,, SOIL EVEN W/TOP OF ROOTBALL, TREE RING MULCH, PER PLANS, 3"DEPTH OVER ENTIRE BED. DO w w U 6 DO NOT OVER COMPACT!! O NOT COVER CROWNS OF PLANTS STEEL TRASH a Q a o Q g / SET ROOTBALL ON NATIVE, UNDISTURBED RECEPTACLE WITH LID � zax � � � Qati III III j�A// /V�/ PROVIDE COMMERCIAL FERTILIZER TABLETS AND SOIL (ITEM#1206 L) Q o = \ /� / BIOSTIMULANT,AS SPECIFIED, FOR EACH SHRUB a C7 a ° / /\\i\ NOTES: TELESCOPIC RODNEY EVANS + PARTNERS a + + + + o C"IV//VA/� ////III III- GALVANIZED STEEL reand artners.com+208-514-3300+1450 W.Bannock Street,Boise,Idaho 83702 III //VA/� /VAA/V III- AMENDMENTS AS SPECIFBACKFILL WITH IED. TOPSOILD KFILLDIN 6�LIFTS, 1. REMOVE BURLAP,TWINE,AND WIRE BASKET FROM TOP%3 OF ROOTBALL. REMOVE ALL NAILS,TIES,AND PLASTIC FROM MOUNTING POST(ITEM p ROOTBALL. IF SYNTHETIC BURLAP IS UTILIZED TO WRAP THE ROOTBALL, IT SHALL BE COMPLETELY REMOVED. ONLY - #1301-P) 3 _ III III j L WATER EACH LAYER, DO NOT TAMP OR OVER BIODEGRADABLE BURLAP SHALL BE LEFT ON THE BOTTOM OF THE ROOTBALL. 00 COMPACT. 2. THE STAKING OF TREES IS TO BE THE CONTRACTOR'S OPTION; HOWEVER,THE CONTRACTOR IS RESPONSIBLE TO ENSURE II - - - E PEBBLEBROOK SUBDIVISION THAT ALL TREES ARE PLANTED STRAIGHT AND THAT THEY REMAIN STRAIGHT FOR LENGTH OF WARRANTY PERIOD OR 1 YEAR flf-] ':" liv I I � I=11 IIIII I i 12" WIDTH OF 12" CONSTRUCT 6"MOUND OF TOPSOIL AFTER SUBSTANTIAL COMPLETION WHICHEVER IS GREATER. ALL STAKING SHALL BE REMOVED AT THE END OF THE E(0 1= I IIIIII-I MIN. ROOTBALL MIN. WARRANTY PERIOD. 10 1� II 1i itli N. MERIDIAN ROAD III- =III- 3. IN THE EVENT OF A QUESTION OR LACK OF CLARITY ON THE DRAWINGS,THE CONTRACTOR IS TO NOTIFY THE LANDSCAPE I!' =11I =1 MERIDIAN, ID 83646 = I-"t III A NOTES: ARCHITECT BEFORE PROCEEDING. 1I =III-III- 4. LANDSCAPE CONTRACTOR IS TO NOTIFY THE LANDSCAPE ARCHITECT AND OWNER PRIOR TO INSTALLATION OF PLANT -IIIIIIII 119" 1111111= COMPACTED SUBDIVISION IMPROVEMENTS 1. SHRUB SHALL BEAR SAME RELATIONSHIP TO GRADE AS IT DID IN NURSERY. MATERIAL. - SUB-GRADE 2. WATER SHRUB TWICE WITHIN FIRST 24 HOURS. 5. WRAP RUBBER CINCH TIES AROUND THE TREE TRUNKS AND STAKES USING EITHER THE STANDARD OR FIGURE EIGHT TYING s 0 3. THIN BRANCHES AND FOLIAGE BY%3. METHOD. SECURE THE TIES TO THE STAKES WITH GALVANIZED NAILS TO PREVENT SLIPPAGE. L 4. DO NOT CUT LEADERS TO RETAIN NATURAL SHRUB SHAPE. 6. WATER TREE TWICE WITHIN THE FIRST 24 HOURS. PRELIMINARY M I NARY LANDSCAPE PLAN S FOER CONTA LINE GROWN PLANTS THAT ARE ROOTBOUND, SPLIT THE ROOTBALL WITH 3 EQUAL SPACED 7. IN THE EVENT HARDPAN SOILS PREVENT TREE PLANTING AS DETAILED, NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY. DETAILS Ir SHRUB PLANTING CONIFEROUS TREE PLANTING DOGIPOT® PET STATION PROJECT SHEET 323080 NOT TO SCALE 5 NOT TO SCALE 8 SCALE: 1/2"= V-0" a MODEL #1003-L N DATE 02/13/23 Ll . 5 _ I it j DRAWN BY CHECKED BY T Q LP BSS 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 AGENCY REVIEW