Loading...
HomeMy WebLinkAboutLandscape Plan 5 STORMWATER SWALE REVEGETATION REQUIREMENTS M GENERAL OVERVIEW FIBER MULCH MATERIAL THESE REQUIREMENTS OUTLINE THE RECOMMENDED GUIDELINES FOR REVEGETATION OF SIDE-SLOPES, BANKS, GROW NUTRIBASE FROM QUATTRO ENVIRONMENTAL,A COMPOSTED POULTRY BASED MULCH MATERIAL FREE OF AND BOTTOMS(EXCLUDING SAND INVERT AREAS)OF NEW STORMWATER MANAGEMENT PONDS THROUGHOUT THE GROWTH OR GERMINATION INHIBITING INGREDIENTS. APPLY AT THE RATE OF 2000 LBS. PER ACRE. JURISDICTION OF ADA COUNTY HIGHWAY DISTRICT(ACHD).THE RECOMMENDATIONS AND REQUIREMENTS DESCRIBED ORGANIC SOIL AMENDMENT PLANT SCHEDULE PLANT SCHEDULE HERE ARE TAKEN IN PART FROM THE ACHD STORMWATER MANAGEMENT POND REVEGETATION GUIDANCE MANUAL GROW NUTRIBOOST FROM QUATTRO ENVIRONMENTAL(OR APPROVED EQUAL)APPLIED AT 5 GALLONS PER ACRE. (ASMPRGM)(DATED:APRIL 2014).THE FIVE MAIN GOALS FOR THE REVEGETATION OF NEW PONDS ARE AESTHETICS, NOXIOUS WEED AND INVASIVE SPECIES MANAGEMENT, FIRE HAZARD REDUCTION,WATER QUALITY AND EROSION TACKIFIER SYMBOL CODE QTY COMMON / BOTANICAL NAME PLANTING SIZE MATURITY SIZE CLASS SYMBOL QTY COMMON / BOTANICAL NAME SIZE NOTES CONTROL. REFER TO SECTIONS OF THE MANUAL AS NOTED IN THESE REQUIREMENTS. MULCH TACKIFIER SOIL STABILIZER-ECOLOGY CONTROLS M-BINDER. TACKIFIER APPLIED AT THE RATE OF 80 LBS. PER ACRE. CONIFEROUS TREES GROUND COVERS GENERAL EARTHWORK GRANITE SEED 1697 WEST 2100 NORTH RTF Sod ALL WORK SHALL BE LIMITED TO THE AREA REQUIRED FOR CONSTRUCTION. ALL FINISHED GRADES SHALL BE P.O. BOX 177 L Gold Cone Deodar Cedar 77,218 Sf --- SMOOTH AND ROUNDED TO ENSURE A NATURAL TRANSITION BETWEEN NEW AND EXISTING GRADES. REFER TO LEHI, UTAH 84043 CC 3 Cedrus deodara'Gold Cone' 6 -7 Ht. 25'H x 15 W See Notes Tall Fescue GRADING AND DRAINAGE PLANS FOR ADDITIONAL REQUIREMENTS. IF NATURAL TOPSOIL OCCURS AT VARYING DEPTHS 1-800-768-4433 (D 3,801 Sf See NOteS --- ON THE PROJECT SITE. THE TOPSOIL SHOULD BE EXCAVATED AND STOCKPILED AT DESIGNATED STORAGE AREAS (OR APPROVED EQUAL) Stormwater Swale Seed Mix o PB PRIOR TO THE PROPOSED GRADING OPERATIONS.5 5 Bacheri Colorado Spruce 6' -7' Ht. 18' H x 8' W DRILL SEEDING Picea pungens 'Bacheri' MULCH DRILL SEEDING IS RECOMMENDED IN THE UPLAND AREAS WITH SLOPES LESS THAN 3:1. SEED DEPOSITION SHOULD BE CALIBRATED TO A DEPTH OF 0.25 TO 0.5 INCH. FULL SIZE OR COMPACT RANGELAND 18,528 sf 3" minus Medium Bark Mulch SITE ASSESSMENT DRILLS ARE RECOMMENDED. DEPENDING ON SIZE, DRILLS CAN BE PULLED BY TRACTOR OR ALL-TERRAIN VEHICLE. PC5 5 Colorado Blue Spruce 6' Ht. 45'H x 25'W ............ Bark Mulch CONTRACTOR SHALL ASSESS THE EXISTING SOIL CONDITIONS TO IDENTIFY ANY BARRIERS TO A SUCCESSFUL DRILL SEEDING SHOULD FOLLOW CONTOURS IN TOPOGRAPHY TO MINIMIZE EROSION POTENTIAL. CONTRACTOR'S Picea pungens 'Glauca' ESTABLISHMENT OF THE DESIRED SPECIES DUE TO CONDITIONS AT THE SITE. REFER TO ASMPRGM SECTION 3.3 FOR OPTION TO DRILL SEED OR HYDROSEED UPLAND AREAS. VISUAL AND FIELD ASSESSMENT SOIL CHARACTERISTICS. IF VISUAL ASSESSMENT OF SOIL INDICATES ANY UNUSUAL HYDROSEEDING K PF 11 Vanderwolf's Pyramid Pine 6' Ht. 40'H x 20'W SOIL CONDITIONS,THE CONTRACTOR SHALL HAVE THREE(3)SOIL TESTS PERFORMED BY A QUALIFIED SOIL ANALYSIS MIX SPECIFIED SEED AND ORGANIC SOIL AMENDMENT IN WATER PER MANUFACTURER'S RECOMMENDATIONS. Pinus flexilis Vanderwolfs Pyramid LABORATORY. THESE RESULTS WILL DIRECT THE PREPARATION OF THE SOIL FOR THE REVEGETATION ACTIVITIES. APPLY SEEDED SLURRY EVENLY IN TWO INTERSECTION DIRECTIONS. DO NOT HYDROSEED AREA IN EXCESS OF THAT II CONTRACTOR SHALL ALSO ASSESS THE EXISTING HYDROLOGICAL CONDITIONS IF ANY AND THE PROPOSED WHICH CAN BE MULCHED ON SAME DAY. KEEP OFF ROADS,WALKS,STRUCTURES AND AREAS NOT TO BE SEEDED. Austrian Pine TOPOGRAPHY OF THE PROPOSED POND. REFER TO ASMPRGM SECTION 3.4 AND 3.5 FOR ADDITIONAL INFORMATION AND CLEAN UP THESE AREAS. PN 4 Pinus nigra 6' Ht. 55'H x 30'W CONDITIONS. AFTER HYDROSEEDING IN UPLAND AREAS,TRACK IN SEED USING A CLEATED CRAWLER WITH TRACK MARKS PERPENDICULAR TO THE SLOPE. AFTER TRACKED, MULCH SLOPE WITH 2O00 LBS. PER ACRE OF FERTILE-FIBER MULCH Oregon Green Austrian Pine SITE PREPARATION MATERIAL AND 80 LBS. PER ACRE OF TACKIFIER. PO 5 Pinus nigra'Oregon Green' 6' Ht. 20'H x 15'W TOPSOIL REQUIREMENTS AND PREPARATION AFTER HYDROSEEDING IN WETLAND AREAS, DO NOT TRACK IN SEED USING A CLEATED CRAWLER. AFTER SEEDING, MULCH AREA WITH 2O00 LBS. PER ACRE OF FERTILE-FIBER MULCH MATERIAL AND 80 LBS. PER ACRE OF TACKIFIER. REUSE EXISTING TOPSOIL STOCKPILED ON THE SITE. SUPPLEMENT WITH IMPORTED TOPSOIL WHEN QUANTITIES SEEDING TIME DECIDUOUS TREES ARE INSUFFICIENT. TOPSOIL REQUIREMENTS: ASTM D 5268, PH RANGE OF 5.5 TO 7, FOUR PERCENT ORGANIC MATERIAL THE OPTIMAL SEEDING TIME SHALL BE IN FALL, BETWEEN MID SEPTEMBER AND MID OCTOBER. IF SEEDING IS MINIMUM, FREE OF STONES 1/2 INCH OR LARGER IN ANY DIMENSION,AND OTHER EXTRANEOUS MATERIALS HARMFUL TO APPLIED TOO EARLY OR TOO LATE AND PROPER GERMINATION IS NOT REALIZED PRIOR TO FALL DORMANCY,THEN Flame Amur Maple PLANT GROWTH. RESEEDING SHALL BE APPLIED IN EARLY SPRING,AS SOON AS SOIL IS WORKABLE(NOT MUDDY)BETWEEN MARCH AND AG2 3 Acer ginnala'Flame' 3" Cal. B&B 20 H X 20 W Class I TOPSOIL SOURCE: STRIP EXISTING TOPSOIL FROM ALL AREAS OF THE SITE TO BE DISTURBED. TOPSOIL SHALL BE MID MAY. THIS PLANTING TIME PROVIDES THE OPTIMUM WEATHER CONDITIONS FOR SEED GERMINATION AND SEEDLING FERTILE, FRIABLE, NATURAL LOAM,SURFACE SOIL, REASONABLY FREE OF SUBSOIL,CLAY LUMPS, BRUSH,WEEDS AND SURVIVAL RATE. SEEDING AFTER NOVEMBER 20,'DORMANT SEEDING'INSURES THAT THE SEED DOES NOT GERMINATE OTHER LITTER,AND FREE OF ROOTS, STUMPS,ORGANIC MATTER LARGER THAN 2 INCHES IN ANY DIMENSION,AND PRIOR TO FREEZING WINTER TEMPERATURES AND SEED SHOULD BE IN PLACE FOR THE EARLY SPRING RAINS. OTHER EXTRANEOUS OR TOXIC MATTER HARMFUL TO PLANT GROWTH. TOPSOIL SHALL BE SCREENED TO ACHIEVE THIS • AP 3 Princeton Gold Norway Maple 3" Cal B&B 45 H x 40 W Class II REQUIREMENT. . Acer platanoides 'Princeton Gold' CONTRACTOR SHALL HAVE(3)TOPSOIL SAMPLES TESTS PERFORMED BY A QUALIFIED SOIL ANALYSIS TEMPORARY SUPPLEMENTAL IRRIGATION LABORATORY. REPRESENTATIVE SAMPLES SHALL BE TESTED FOR ACIDITY, FERTILITY AND GENERAL TEXTURE BY A THE CONTRACTOR SHALL PROVIDE SUPPLEMENTAL IRRIGATION IN SITUATIONS WHERE IMMEDIATE VEGETATION QUALIFIED SOIL ANALYSIS LABORATORY AND COPIES OF THE TESTING AGENCY'S FINDINGS AND RECOMMENDATIONS ESTABLISHMENT IS DESIRED,SUCH AS HIGHLY VISIBLE SITES OR EROSION PRONE AREAS OR WHERE IT MAY BE H SHALL BE FURNISHED TO THE LANDSCAPE ARCHITECT'S REPRESENTATIVE BY THE CONTRACTOR. ALL TOPSOIL SHALL NECESSARY FOR SEEDLING ESTABLISHMENT. Pacific Sunset Maple BE AMENDED TO ACHIEVE SPECIFIED PH AND ORGANIC REQUIREMENTS. RE-TEST TOPSOIL PRIOR TO FINAL + AX $ Acer truncatum x platanoides 'Warren red'TM 2" Cal. B&B 30 H x 25 W Class I COMPLETION TO ENSURE REQUIREMENTS HAVE BEEN MET. NO TOPSOIL SHALL BE PLACED WHILE IN A FROZEN OR SEEDED AREAS SHOULD BE IRRIGATED USING OVERHEAD SPRAY OR ROTOR IN-GROUND SPRINKLER IRRIGATION MUDDY CONDITION. SYSTEM. IT IS RECOMMENDED THAT, IF USED,THE IRRIGATION BE CONTINUED FOR AT LEAST TWO(2)SEASONS. SEE PLACE TOPSOIL IN AREAS WHERE REQUIRED TO OBTAIN THICKNESS AS SCHEDULED. PLACE TOPSOIL DURING DRY IRRIGATION PLANS. WEATHER. PROVIDE ADDITIONAL IMPORTED TOPSOIL REQUIRED TO BRING SURFACE TO PROPOSED FINISH GRADE,AS Sienna Glen Maple REQUIRED •• AS 5 p 3" Cal. B&B 50�H x 35�W Class II GENERAL MAINTENANCE AND MONITORING Acer x freemanii 'Sienna' COMPACTED TOPSOIL THICKNESS AT THE FOLLOWING AREAS: THE CONTRACTOR SHALL MAINTAIN THE SITE FOLLOWING REVEGETATION FOR THE PERIOD OF TWO(2)YEARS. -ram GRASSES AND FORBS:6 INCHES MINIMUM THIS INCLUDES REMOVAL OF VOLUNTEER TREES AND SHRUBS, LITTER CONTROL,WEED CONTROL AND MOWING OF y TALL GRASSES AT THE DISCRETION OF ACHD STAFF. MOWING SHOULD ONLY BE PERFORMED WHERE FORBS,SHRUBS ` CR2 6 Royal Purple Smoke Tree 2" Cal. B&B 15'H x 10'W Class I FINE GRADE TOPSOIL TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. REMOVE RIDGES AND AND TREES ARE NOT PLANTED. Cotinus coggygria'Royal Purple' FILL DEPRESSIONS,AS REQUIRED TO MEET FINISH GRADES. G ��,/- SITES SHALL BE VISITED EVERY TWO(2)WEEKS FOR MONITORING AND ASSESSING THE SEEDING SUCCESS. TOPSOIL STOCKPILE LOCATIONS TO BE COVERED COORDINATE WITH EROSION AND SEDIMENT CONTROL PLAN. VISUAL ASSESSMENT BY TRAINED PERSONNEL SHOULD OCCUR SEVERAL TIMES OVER THE THE NEXT TWO(2)GROWING Princeton Sentry Maidenhair Tree SEASONS FOLLOWING THE REVEGETATION PROJECT.VISUAL ASSESSMENTS SHALL INCLUDE ESTIMATIONS OF • GP2 5 Ginkgo biloba'Princeton Sentry' 3" Cal. B&B 50'H x 30'W Class 11 ALL GRAVEL,SUBBASE,AND OTHER IMPORTED FILL MATERIALS OTHER THAN TOPSOIL SHALL ONLY BE VEGATATIVE COVER AND ESTABLISHMENT,VEGETATION SPECIES COMPOSITION,SOIL CONDITIONS AND HYDROLOGICAL STOCKPILED IN PROPOSED IMPERVIOUS AREAS. NO GRAVEL OR ROCK MATERIALS SHALL BE STOCKPILED OR CONDITIONS. VISUAL ASSESSMENT WILL IDENTIFY PROBLEM AREAS WHERE REVEGETATION AND SITE PREPARATION TEMPORARILY PLACED IN PROPOSED LANDSCAPE AREAS TO PREVENT LANDSCAPE AREAS FROM BEING CONTAMINATED EFFORTS WILL BE REQUIRED. SITES SHOULD BE MONITORED FOR PRESENCE OF NOXIOUS WEEDS AND INVASIVE WITH ROCK MATERIALS. CONTRACTOR SHALL SUBMIT A DETAILED STOCKPILE PLAN TO LANDSCAPE ARCHITECT AND Worplesdon Sweetgum OWNER FOR APPROVAL PRIOR TO ANY EARTHWORK OPERATIONS. SPECIES. REAPPLY HERBICIDE AS NEEDED FOLLOWING MANUFACTURER'S GUIDELINES AND MAINTENANCE PERSONNEL + LW 10 Liquidambar styraciflua'Worplesdon' 3" Cal. B&B 40'H x 25'W Class 11 EXPERTISE. OTHER POST-MONITIORING METHODS ARE DESCRIBED IN ASMPRGM SECTION 8 AND SHOULD BE FOLLOWED. TOPSOIL DISTRIBUTION RESEEDING EFFORTS SHALL FOLLOW THE SPECIFIED SEED MIXES FOR THE PROJECT ALONG WITH Bloodgood London Plane Tree ONCE THE GENERAL EARTHWORK IS COMPLETE AND ROUGH GRADING HAS BEEN ACCOMPLISHED,THE TOPSOIL RECOMMENDATIONS FROM ASMPRGM SECTION 6. F - PB4 3 Platanus x acerifolia'Bloodgood' 2" Cal. B&B 50 H x 40 W Class II SHOULD BE REDISTRIBUTED OVER THE AREA TO MINIMUM DEPTHS AS SPECIFIED. WHERE NEEDED,SLOPES SHOULD BE GRADED WITH SERRATION TO HOLD TOPSOIL ADEQUATELY. TOPSOIL SHOULD BE SPREAD AND LIGHTLY COMPACTED UTILIZING A SMALL CLEATED TRACTOR MOVING PERPENDICULAR TO THE CONTOURS OR ANOTHER METHOD WITH EQUAL CAPABILITY. IT IS OUR RECOMMENDATION THAT ANY NECESSARY MECHANICAL MEANS OF EROSION CONTROL BE TR 4 Redmond American Linden 2" Cal B&B 35 H x 25 W Class I IN PLACE PRIOR TO BEGINNING SITE DISTURBANCE. . Tilia americana X euchlora'Redmond' ONCE TOPSOIL HAS BEEN DISTRIBUTED AND GRADED, REVEGETATION SEEDING SHALL FOLLOW IMMEDIATELY. IN ORDER TO ELIMINATE SURFACE CRUSTING AND TO FACILITATE BETTER ROOT PENETRATION,THE SURFACE SHOULD BE SCARIFIED PRIOR TO SEEDING. FLOWERING TREES COMPOST ADDITION TO THE TOPSOIL E MP 9 Prairifire Crabapple 3" Cal. B&B 20'H X 20'W Class I COMPOST ADDITION RATES WILL BE DEPENDENT ON THE QUALITIES OF THE COMPOST AND THE QUALITIES OF THE Malus x'Prairifire' TOPSOIL. COMPOST APPLICATION RATES SHALL BE DETERMINED BY CONSULTATION WITH A QUALIFIED RECLAMATION SPECIALIST,AGRICULTURAL PROFESSIONAL OR A REPRESENTATIVE OF THE COMPOST PRODUCER. CONTRACTOR MS 2 Spring Snow Crabapple 2" Cal. B&B 25'H x 20'W Class I SHALL HAVE ONE(1)SAMPLE OF THE COMPOST TESTED BY A QUALIFIED SOIL ANALYSIS LABORATORY. Malus x'Spring Snow' IF APPLYING COMPOST, LOOSEN SURFACE SOIL TO A DEPTH OF AT LEAST 6 INCHES. PROVIDE WEED ABATEMENT Canada Red Chokecherry PROCEDURE. APPLY SOIL AMENDMENTS ACCORDING TO PLANTING SOIL MIX PROPORTIONS AND MIX THOROUGHLY 0 PC 2 Prunus vi rgi niana'Canada Red' 3" Cal. B&B 25'H x 20'W Class I INTO TOP 6 INCHES OF SOIL. TILL SOIL TO A HOMOGENEOUS MIXTURE OF FINE TEXTURE. APPLY SOIL AMENDMENTS LL DIRECTLY TO SURFACE SOIL BEFORE LOOSENING. n NO. REVISION/ISSUE DATE 0 PC3 8 Chanticleer Pear 3" Cal. B&B 40'H x 15'W Class 11 REFER TO ASMPRGM SECTIONS 4.1.2 AND 4.1.3 FOR ADDITIONAL INFORMATION. D Pyrus calleryana'Glen's Form'TM C" PROBLEMATIC SOIL CONDITIONS SITE INVESTIGATION AND TOPSOIL ANALYSIS MAY INDICATE THE NEED FOR REMEDIATION OF PROBLEMATIC SOIL p°° pF OO� 81 , SYMBOL CODE QTY COMMON / BOTANICAL NAME PLANTING SIZE MATURITY SIZE NOTES o0 PEE �Q' .0 CONDITIONS SUCH AS COMPACTION OR NUTRIENT EXCESSES OR DEFICIENCIES. SEE ASMPRGM SECTION 4.2 FOR SW N SHRUBS ADDITIONAL REQUIREMENTS. or* m�, ♦�O�Q�oo Knowwhaft Call before J - �� 4 U o CALL 2 BUSINESS DAYS E Coral Beauty Cotoneaster WEED ABATEMENT o J ❑ ❑ IN ADVANCE BEFORE o •� CB 25 5 gal. 2'H x 6'W o� Q-�54 �❑ Cotoneaster dammeri Coral Beauty oo7(�i q o YOU DIG,GRADE,OR r O EXCAVATE FOR THE 9 ALL AREAS TO BE PLANTED OR SEEDED SHALL HAVE WEED ABATEMENT OPERATIONS PERFORMED ON THEM PRIOR TO �,o MARKING OF N o � Blue Rug Juniper PLANTING OR SEEDING. Q �� Quo°° UNDERGROUND a ll JW 20 p 2 gal. 0.5'H x 6 W DO MEMBER UTILITIES Juni erus horizontal Wiltonii CONTRACTOR SHALL SPRAY ALL EXPOSED WEEDS WITH ROUND-UP(CONTACT HERBICIDE)OR APPROVED EQUAL. DO 4°0 o�op0000°°°°° 3 C % Compact Oregon Grape NOT WATER FOR AT LEAST SEVEN(7)DAYS. REMOVE EXPOSED WEEDS FROM THE SITE. CONTRACTOR SHALL OPERATE o MC 33 Mahonia aquifolium 'Compacta' 2 gal. 3 H x 4 W THE AUTOMATIC IRRIGATION SYSTEM FOR A PERIOD OF FOURTEEN(14)DAYS. AT CONCLUSION OF THIS WATERING Coppertina Ninebark PERIOD, DISCONTINUE WATERING FOR THREE TO FIVE(3-5)DAYS. APPLY SECOND APPLICATION OF ROUND-UP TO ALL z PM 20 5 gal. 8'H x 6'W EXPOSED WEEDS. APPLY IN STRICT CONFORMANCE WITH MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. DO w p Physocarpus opulifolius'Mindia' s NOT WATER FOR AT LEAST SEVEN(7)DAYS. REMOVE WEEDS FROM THE SITE. IF ANY EVIDENCE OF WEED GERMINATION z Otto Luyken English Laurel w + P03 25 5 gal. 3'H x 6'W EXISTS AFTER TWO(2)APPLICATIONS,CONTRACTOR SHALL BE DIRECTED TO PERFORM A THIRD APPLICATION. AT THE w1. Prunus Iaurocerasus 'Otto Luyken' w w TIME OF PLANTING AND SEEDING,ALL PLANTING AREAS SHALL BE WEED FREE. x v RG2 15 Gro-Low Fragrant Sumac 2 gal. 2'H x 6'W Rhus aromatics Gro-Low SEEDINGtp x � Flower Carpet White Rose THE FOLLOWING INFORMATION PROVIDES MATERIAL AND EXECUTION FOR SEEDING. v z a v o 1. g RN 7 Rosa x'Noaschnee' 2 gal. 3 H x 3 W SEED MIX FOR INTERMITTENTLY FLOODED OR SATURATED SITE Ca a 0 € PERCENT OF z ILI � 9 _O E C-0 Anthonyaterer S iraea POUNDS PER LIVE PURE LIVE a y p RODNEY EVANS + PARTNERS a + + + + + SA2 `28 Spiraea x bumalda'Anthony Waterer' 5 gal. 5 H x 5 W COMMON NAME BOTANICAL NAME SEED PER ACRE SEED IN MIX 3 N - reandpartners.com+208-514-3300+1450 W.Bannock Street,Boise,Idaho 83702 � �I VP 26 Pink Dawn Viburnum 5 al. 8'H x 6'W ROUGH BENTGRASS Viburnum x bodnantense 'Pink Dawn' g Agrostis scabra o.02 .2 i AMERICAN SLOGHGRASS Beckmannia syzigachne 0.27 2.5 E Q CANADA WILDRYE PEBBLEBROOK SUBDIVISION ORNAMENTAL GRASSES Elymus canadensis 3.03 29 �uuG Karl Foerster Feather Reed Grass SLENDER WHEATGRASS Elymustrachycaulus 1.92 18 N. MERIDIAN ROAD 0 T c CK2 17 Calama rostis x acutiflora'Karl Foerster' 1 gal. 6 H x 2 W WESTERN MANNAGRASS Glyceria occidentalis 1.11 11 MERIDIAN ID 83646 �nnc� g MEADOW BARLEY Hordeum brachyanterum 0.77 7 A 0m/'% Malden Grass WESTERN WHEATGRAS Pascopyrum smithii 2.77 27 SUBDIVISION IMPROVEMENTS = MG 15 1 gal. 6'H x 4'W U-) �, � Miscanthus sinensis 'Gracillimus' TUFTED HAIRGRASS Deschampsia caespitosa 0.35 3.4 0 FOWL BLUEGRASS Poa palustris 0.11 1 PERENNIALS ARTICRUSH Juncusarcticus 0.04 .3 PRELIMINARY LANDSCAPE PLAN CE Dolce® Silver Gumdrop Coral Bells SMALL-FRUITED BULRUSH Scirpus microcarpus 0.06 .6 DETAILS W HD 3 Heuchera x'Silver Gumdrop' 1 Gal. 2 H x 1.5 W TOTAL 10.42 100 m Great Expectations Hosta PROJECT SHEET N HG2 2 Hosta x'Great Expectations' 1 gal. 2'H x 3'W 23080 Q N N Upscale 'Red Velvet' Bee Balm N • l) MX 3 Monarda x'Upscale' 1 Gal. 2 H x 3 W DATE o L1 . Goldsturm Black-Eyed Susan it c. • RB 6 1 gal. 2 H x 2 W 02/13/23 4 w Rudbeckia fulgida sullivantn Goldsturm DRAWN BY CHECKED BY T Q LP BSS 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 AGENCY REVIEW