HomeMy WebLinkAbout2024-03-21 ACHD Draft Alexis Pickering,President
Miranda Gold,Vice-President
ACHD Jim Hansen,Commissioner
Kent Goldthorpe,Commissioner
ww�m Dave McKinney,Commissioner
Date: XXXX, 202X
To: Jacob Holmes, via email
Staff Contact: Kara Leigh Troyer, Planner
Project Description: The applicant is requesting approval of a short plat application
for the development of two medical office building lots on 2.53-acres.
Trip Generation: This development is estimated to generate 1,368 vehicle trips per
day and 149 vehicle trips per hour in the PM peak hour based on the Institute of
Transportation Engineers Trip Generation Manual, 1111 edition.
Proposed Development Traffic Impact Study
Meets
All ACHD Policies -
L
Requires Revisions to meet No If yes, is mitigation
ACHD Policies
-•u i red
Area Roadway - - of
Service ACH - •
D• area roadwayseet Improvements
ACHD's LOS Planning
Thresholds?
• Livable Street
Performance Measures
Area •.•
LOS Planning Thresholds in Pedestrian
the future with planned
improvements?
Is Transit Available?
connecting you to more
Ada County Highway District•3775 Adams Street•Garden City,ID•83714• PH 208387-6100•FX 345-7650•www.achdidaho.org
Development Services Department
,--4�'
-T
ACHD
connecting you to more
Project/File: Watts Meridian Medical Partners Subdivision /Trak It Number/SHP-2024-0001
This is a short plat application for the development of two medical office building lots
on 2.53-acres.
Lead Agency: City of Meridian
Site address: 1256 S Rackham Way
Staff Approval: XXXX, 202X
Applicant: Jacob Holmes, via email
Focus Engineering & Surveying
1001 N Rosario Street, Suite 100
Meridian, ID 83642
Staff Contact: KaraLeigh Troyer, Planner
Phone: 387-6391
E-mail: ktroyer(ab-achdidaho.org
Report Summary:
ACHD Planned Improvements — pg.2
1. Conditions of Area Roadways — pg.2
A. Site Specific Conditions of Approval — pg.3
o Vicinity Map — pg.4
o Site Plan — pg.5
B. Findings— pg.6
C. Policies — pg.7
D. Standard Conditions of Approval — pg.9
E. Appeal Guidelines— pg.11
1 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
ACHD Planned Improvements
1. Capital Improvements Plan (CIP)/ Integrated Five Year Work Plan (IFYWP):
• The intersection of Overland Road and Eagle Road is scheduled in the IFYWP to be widened
to 7-lanes on the north leg, 7-lanes on the south, 9-lanes east, and 9-lanes on the west leg
with a construction date yet to be determined.
• Overland Road is listed in the CIP to be widened to 7-lanes from Eagle Road to Cloverdale
Road between 2036 and 2040.
2. Condition of Area Roadways
Traffic Count is based on Vehicles per hour(VPH)
Roadway Frontage Functional PM Peak Hour PM Peak Hour
Classification Traffic Count Level of Service
Eagle Road 0-feet Principal Arterial 1,794 "F"
Overland Road 0-feet Principal Arterial 1,369 Better than "E"
Rackham Way 305-feet Local N/A N/A
* Acceptable level of service for a five-lane principal arterial is "E" (1,780 VPH).
** ACHD does not set level of service thresholds for local roadways.
3. Average Daily Traffic Count (VDT)
Average daily traffic counts are based on ACHD's most current traffic counts.
• The average daily traffic count for Eagle Road south of 1-84 was 41,631 on November 15,
2021.
• The average daily traffic count for Overland Road east of Eagle Road was 29,000 on June
15, 2021.
• There are no existing average daily traffic counts for Rackham Way.
2 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
A. Site Specific Conditions of Approval
1. Construct Rackham Way as '/z of a 36-foot wide local commercial street section with curb, gutter,
an 8-foot wide planter strip, and 5-foot wide detached sidewalk abutting the site. Provide a
permanent right-of-way easement from 2-feet behind back of curb to 2-feet behind back of sidewalk.
2. Construct a 26-foot wide curb-return type driveway located 178-feet south of the site's north
property line.
3. Submit civil plans to ACHD Development Services for review and approval. The impact fee
assessment will not be released until the civil plans are approved by ACHD.
4. There will be an impact fee that is assessed and due prior to issuance of any building permits. The
assessed impact fee will be based on the impact fee ordinance that is in effect at that time. The
impact fee assessment will not be released until the civil plans are approved by ACHD.
5. Comply with all Standard Conditions of Approval.
3 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
Vicinity Map
. .. � + f � �.• �•wnw.w �w•r 1.7Rq,
f i R {far fIEK O ri
l
,a lt�� rs• .Aim
.r All
r Nf
T ,
E erla�Rd �
� r
4 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
Site Plan
1 —I+ -- ——_— NAIL FN�— —
-._ --I_—- --------------- ——I — _____ _______
ff I' r a I o�l 1p .fU j
ll r I reoueeo,.x ne.e I I as I
f f .m>• � I wM: n I
cucemw® + p + I r I I I
sn aM.cs¢, +f '' I eM.cm,zG ure I ® jl
a v e rn ra xxs
s oxii,¢
Ae.r
Ir -J-+-1- - - - = �- - - ----------------- �.��
� I i
,w
A IL � w.. �
r - ------------ --- - -i--- -- J- --- ------------------ - I
mm
__ __�—ttttt
I 11W
II'r a r + vexiw.csw iz I$ �s s
nT
+r r + + rI rill
ti
+ o°uPs er° ox
I
--- -----
r r I xoeco
5 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
B. Findings for Consideration
1. Site History/Oxygen Subdivision No. 3
This site is located within Oxygen Subdivision No.3. On June 22, 2017, ACHD approved a
preliminary plat for Oxygen Subdivision No.3 abutting the unpaved portion of Rackham Way. As
part of ACHD's action, the applicant of the Oxygen Subdivision No.3 was required to improve the
unpaved portion of Rackham Way abutting their site with pavement widening and the construction
of curb, gutter, and sidewalk.
As part of ACHD's January 2018 approval of the final plat for Oxygen Subdivision No.3 that
applicant provided an improvement agreement and financial surety in lieu of constructing the
improvements on Rackham Way. The original improvement agreement expired in January 2019
and was extended for an additional year with an expiration date of January 19, 2020. The
applicant asked for an additional extension of the improvement agreement on January 5, 2021
and the financial surety for these improvements (letter of credit) expired on January 10, 2021.
Because the improvement agreement and financial surety for the improvements to Rackham Way
have expired and have not been constructed, the current applicant of the Watts Meridian Medical
Center, will be required to make frontage improvements on Rackham Way abutting their site.
2. Rackham Way
a. Existing Conditions: Rackham Way is improved with 2-travel lanes and no curb, gutter or
sidewalk abutting the site. There is 59-feet of right-of-way for Rackham Way (32-feet from
centerline).
b. Applicant's Proposal: The applicant is proposing to construct curb, gutter, an 8-foot wide
planter strip, and 5-foot wide detached sidewalk.
c. Staff Comments/Recommendations: The applicant's proposal exceeds District policy and
should be approved, as proposed. The applicant should be required to construct Rackham Way
as '/z of a 36-foot wide local commercial street section abutting the site.
For detached sidewalk, the applicant should be required to provide a permanent right-of-way
easement from 2-feet behind back of curb to 2-feet behind back of sidewalk.
3. Driveways
3.1 Rackham Way
a. Existing Conditions: There is a 15-foot wide unimproved driveway from the site onto Rackham
Way located 210-feet south of the site's north property line (measured centerline to property
line).
b. Applicant's Proposal: The applicant is proposing to construct a 26-foot wide curb-return type
driveway located 178-feet south of the site's north property line (measured centerline to property
line).
c. Staff Comments/Recommendations: The applicant's proposal meets District policy and
should be approved, as proposed.
6 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
C. Policy
1. Federal Accessibility Design Guidelines and Standards
District policy 7203.1.1 states that developers shall follow the current version of the U.S. Access
Board's Accessibility Guidelines for Pedestrian Facilities in the Public Right-of-Way (PROWAG),
36 CFR Part 1190, September 7, 2023; (Also see, https//www.access-board.gov/prowag and
https//www.access-board.gov/files/prowag/planning-and-design-for-alternatives.pdf for additional
information).
2. Minor Improvements
Minor Improvements Policy: District Policy 7203.3 states that minor improvements to existing
Highways adjacent to a proposed development may be required. These needed transportation
facilities are to correct deficiencies or replace deteriorated facilities. Included are sidewalk and/or
bike lane construction or replacement (with physical buffers if missing and needed); construction of
transitional sidewalk segments; crosswalk construction or replacement; curb and gutter
construction or replacement; repair, replacement or expansion of curb extensions; replacement of
unused driveways with curb, gutter, sidewalk, repair or addition of traffic calming or speed mitigation
features; installation or reconstruction of pedestrian ramps; pavement repairs; signs, motor vehicle,
pedestrian and bicycle traffic control devices; and other similar items. The current version of
PROWAG will determine the applicable accessibility requirements for alterations and elements
added to existing streets. ACHD staff is responsible for identifying the minor improvements that
would be proportionate to the size and complexity of the development.
3. Livable Street Performance Measures
District policy 7203.8 states that ACHD has adopted performance measures (level of stress) for
evaluating the experience of bicyclists and pedestrians. ACHD seeks to create a transportation
network that serves all ages and abilities. Bike and pedestrian facilities built through development
should achieve a bike and pedestrian level of traffic stress 1 or 2, with no new bike lane below a
minimum of 5-feet.
4. Rackham Way
Commercial Roadway Policy: District Policy 7208.2.1 states that the developer is responsible for
improving all commercial street frontages adjacent to the site regardless of whether or not access
is taken to all of the adjacent streets.
Street Section and Right-of-Way Policy: District Policy 7208.5 states that right-of-way widths for
new commercial streets shall typically be 50 and 70-feet wide and that the standard street section
will vary depending on the need for a center turn lane, bike lanes, volumes, percentage of truck
traffic, and/or on-street parking.
• A 36-foot street section (back-of-curb to back-of-curb)will typically accommodate two travel
lanes and on-street parking.
• A 40-foot street section (back-of-curb to back-of-curb)will typically accommodate two travel
lanes and a center turn lane.
• A 46-foot street section (back-of-curb to back-of-curb)will typically accommodate two travel
lanes and a center turn lane and bike lanes.
Sidewalk Policy: District Policy 7208.5.6 requires a concrete sidewalks at least 5-feet wide to be
constructed on both sides of all commercial streets. If a separated sidewalk is proposed, a parkway
strip at least 6-feet wide between the back-of-curb and street edge of the sidewalk is required to
provide increased safety and protection of pedestrians. Consult the District's planter width policy if
trees are to be placed within the parkway strip.
7 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
A permanent right-of-way easement shall be provided if public sidewalks are placed outside of the
dedicated right-of-way. The easement shall encompass the entire area between the right-of-way
line and 2-feet behind the back edge of the sidewalk. Sidewalks shall either be located wholly within
the public right-of-way or wholly within an easement.
Half Street Policy: District Policy 7208.2.2 required improvements shall consist of pavement
widening to one-half the required width, including curb, gutter and concrete sidewalk (minimum 5-
feet), plus 12-feet of additional pavement widening beyond the centerline established for the street
to provide an adequate roadway surface, with the pavement crowned at the ultimate centerline. A
3-foot wide gravel shoulder and a borrow ditch sized to accommodate the roadway storm runoff
shall be constructed on the unimproved side.
5. Driveways
5.1 Rackham Way
Driveway Location Policy: District policy 7208.4.1 requires driveways near intersections to be
located a minimum of 75-feet (measured centerline-to-centerline) from the nearest local street
intersection, and 150-feet from the nearest collector/arterial or arterial street intersection.
Successive Driveways: District Policy 7208.4.1 states that successive driveways away from an
intersection shall have no minimum spacing requirements for access points along a local street, but
the District does encourage shared access points where appropriate.
Driveway Width Policy: District policy 7208.4.3 restricts commercial driveways to a maximum
width of 40-feet. Most commercial driveways will be constructed as curb-cut type facilities.
Driveway Paving Policy: Graveled driveways abutting public streets create maintenance
problems due to gravel being tracked onto the roadway. In accordance with District policy,
7208.4.3, the applicant should be required to pave the driveway its full width and at least 30-feet
into the site beyond the edge of pavement of the roadway.
Driveway Design Requirements: District policy 7208.4.3 states if an access point is to be gated,
the gate or keypad (whichever is closer) shall be located a minimum of 50-feet from the near edge
of the intersection and a turnaround shall be provided.
6. Tree Planters
Tree Planter Policy: Tree Planter Policy: The District's Tree Planter Policy prohibits all trees in
planters less than 8-feet in width without the installation of root barriers. Class II trees may be
allowed in planters with a minimum width of 8-feet, and Class I and Class III trees may be allowed
in planters with a minimum width of 10-feet.
7. Landscaping
Landscaping Policy: A license agreement is required for all landscaping proposed within ACHD
right-of-way or easement areas. Trees shall be located no closer than 10-feet from all public storm
drain facilities. Landscaping should be designed to eliminate site obstructions in the vision triangle
at intersections. District Policy 5104.3.1 requires a 40-foot vision triangle and a 3-foot height
restriction on all landscaping located at an uncontrolled intersection and a 50-foot offset from stop
signs. Landscape plans are required with the submittal of civil plans and must meet all District
requirements prior to signature of the final plat and/or approval of the civil plans.
16. Pathway Crossings: United States Access Board R304.5.1.2 Shared Use Paths. In shared use
paths, the width of curb ramps runs and blended transitions shall be equal to the width of the shared
use path.
AASHTO's Guidelines for the Development of Bicycle Facilities 5.3.5 Other Intersection
Treatments: The opening of a shared use path at the roadway should be at least the same width
as the shared use path itself. If a curb ramp is provided, the ramp should be the full width of the
8 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
path, not including any flared sides if utilized. . . . Detectable warnings should be placed across the
full width of the ramp.
FHWA's "Designing Sidewalks and Trails for Access" (1999) reflected common ADA-related
concepts: Chapter 6, Page 16-6: The width of the ramp should be at least as wide as the average
width of the trail to improve safety for users who will be traveling at various speeds. In addition, the
overall width of the trail should be increased, so the curb ramp can be slightly offset to the side.
The increased width reduces conflict at the intersection by providing more space for users at the
bottom of the ramp.
D. Standard Conditions of Approval
1. All proposed irrigation facilities shall be located outside of the ACHD right-of-way (including all
easements). Any existing irrigation facilities shall be relocated outside of the ACHD right-of-way
(including all easements).
2. Private Utilities including sewer or water systems are prohibited from being located within the ACHD
right-of-way.
3. In accordance with District policy, 7203.3, the applicant may be required to update any existing non-
compliant pedestrian improvements abutting the site to meet current Americans with Disabilities
Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), ISPWC, or ACHD
requirements . The applicant's engineer should provide documentation of compliance to District
Development Review staff for review.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number)for details.
5. A license agreement and compliance with the District's Tree Planter policy is required for all
landscaping proposed within ACHD right-of-way or easement areas.
6. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
7. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLINE (1-811-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190
in the event any ACHD conduits (spare or filled)are compromised during any phase of construction.
8. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
9. All design and construction shall be in accordance with the ACHD Policy Manual, ISPWC Standards
and approved supplements, Construction Services procedures and all applicable ACHD Standards
unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and
certify all improvement plans.
10. Construction, use and property development shall be in conformance with all applicable
requirements of ACHD prior to District approval for occupancy.
11. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of ACHD. The burden shall be upon the applicant to obtain written confirmation of
any change from ACHD.
12. If the site plan or use should change in the future, ACHD Planning Review will review the site plan
and may require additional improvements to the transportation system at that time. Any change in
the planned use of the property which is the subject of this application, shall require the applicant
9 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
to comply with ACHD Policy and Standard Conditions of Approval in place at that time unless a
waiver/variance of the requirements or other legal relief is granted by the ACHD Commission.
E. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
10 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001
Request for Appeal of Staff Decision
To request an appeal of a staff level decision, see District policy 7101.6.7 at
https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000
Request for Reconsideration of Commission Action
To request reconsideration of a Commission Action, see District policy 1006.11 at
https://www.achdidaho.org/home/showpublisheddocument/452/638243231708370000
11 DRAFT Watts Meridian Medical Partners
Subdivision / MPP24-0005 / SHP-2024-0001