Loading...
HomeMy WebLinkAboutChange Order 1 with Star Construction, LLC for Linder PRV City of Meridian Public Works Dept. Memo RECEIVED To: Will Berg; Tara Green From: Kyle Radek, P.E., Staff Engineer KIZ- CC: File Date: August 29, 2006 Re: Proposed Agenda Item for September 5, 2005 City Council Meeting 4UC S 'i~VUO City of Meridian City Clerk Office The Public Works Department respectfully requests the following item be placed on the September 5 City Council agenda, under Consent Agenda, for Council's consideration: Chanqe Order Number 1. Linder PRV: This change order covers upgrading 40 linear feet of 12-inch storm sewer to water class pipe required over two unforeseen crossings, extending paving and sidewalk restoration limits as needed, and adding reducers, valves and fittings for a 10-inch main. Recommended Council Action: The Public Works Department recommends that City Council approves Change Order Number 1 for the Linder PRV with Star Construction, LLC for a cost of $10,897.77, and authorizes the Mayor to sign it. This change order covers upgrading 40 linear feet of 12.inch storm sewer to water class pipe required over two unforeseen crossings, extending paving and sidewalk restoration limits as needed, and adding reducers, valves and fittings for a 10.inch main. Thank you for your consideration. Please contact me if you have any questions regarding this item. . Page 1 CHANGE ORDER NO.1 No.1 DATE OF ISSUANCE EFFECTIVE DATE OWNER City of Meridian CONTRACTOR: Star Construciton, LLC. CONTRACT: Linder PRV Description: This change order consists of the following work: . Upgrade 40 linear feet of storm sewer to water class pipe and extend paving and sidewalk restoration limits as appropriate. Add 12 x 10 inch reducers. Change valves and fittings as needed. CHANGE IN CONTRACT PRICE: Original Contract Price $ 55,872.00 Net Increase (Decrease) from previous Change Orders No. ~ to ~ $ 0.00 Contract Price prior to this Change Order: $ 55,872.00 Net increase (decrease) of this Change Order: $ 10,897.77 Contract Price with all approved Change Orders: $ 66,769.77 RECOMMENDED APPROVED CHANGE IN CONTRACT TIMES: Original Contract Times: Substantial Completion: Ready for final payment: (days or dates) Net change from previous Change Orders No. _ to No. - Substantial Completion: Ready for final payment: (days) Contract Times prior to this Change Order: Substantial Completion: Ready for final payment: (days or dates) Net increase (decrease) this Change Order: Substantial Completion: Ready for final payment: (days) Contract Times with all approved Change Orders: Substantial Completion: Ready for final payment: (days or dates) ATTEST Kyle Radek, PE Staff Engineer William G. Berg, Jr., City Clerk Tammy de Weerd, Mayor Date: Date: Approved by City Council: Date: EJCDC 1910-8-6 (1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute. t~B/~2~B6._. BB: 36 2082857947 STAR CONSTRUCTION PAGE 01 . STAR CONSTRUCTION, L.L.C. . ~ P.O. Box 157 Star, ID 83669 ~ Bus: (208) 286..9198 ADeil.. Cell: 867-7082 Fax: (208) 286..7947 :~ Date: 8-29..06 Fax Number of Pages including oovtf sheet: 1 To: CilY-ofMeridian Attn: Kyle Radek From: Anell Irmiul!er Phone: uLI116 Fax: 89s..'!!l BE: 1,indpr/GI'Pp.nh"...d PRV rhll-.g,41 CC: REMARKS: Urgent 0 For Your~ Reply.t\SAP 0 Please Colll1ntJtt D Kyle, "fbe changes {(om having to extend the paving and sidewalk limits, adding 12 X 10 reducers, changing valves and fittings, instal1.ing 40 If of 12 jncb wlllct class pipe on stOlID drain system are as fullQWS: Materials Sub conuactors StaT Contlt. E&L 2354.31 1693.30 63.50.00 'total 10,897.77 Total cOst increase Rq1Jt'St(d to contract amount ]f yOU have any questions please give me a call. Thank's Ancil Irminger 10,897.77