HomeMy WebLinkAboutChange Order 1 with Star Construction, LLC for Linder PRV
City of Meridian
Public Works Dept.
Memo
RECEIVED
To: Will Berg; Tara Green
From: Kyle Radek, P.E., Staff Engineer KIZ-
CC: File
Date: August 29, 2006
Re: Proposed Agenda Item for September 5, 2005 City Council Meeting
4UC S 'i~VUO
City of Meridian
City Clerk Office
The Public Works Department respectfully requests the following item be placed on the
September 5 City Council agenda, under Consent Agenda, for Council's consideration:
Chanqe Order Number 1. Linder PRV: This change order covers upgrading 40 linear feet of
12-inch storm sewer to water class pipe required over two unforeseen crossings, extending
paving and sidewalk restoration limits as needed, and adding reducers, valves and fittings for
a 10-inch main.
Recommended Council Action: The Public Works Department recommends
that City Council approves Change Order Number 1 for the Linder PRV with
Star Construction, LLC for a cost of $10,897.77, and authorizes the Mayor to
sign it. This change order covers upgrading 40 linear feet of 12.inch storm
sewer to water class pipe required over two unforeseen crossings, extending
paving and sidewalk restoration limits as needed, and adding reducers, valves
and fittings for a 10.inch main.
Thank you for your consideration. Please contact me if you have any questions regarding
this item.
. Page 1
CHANGE ORDER NO.1
No.1
DATE OF ISSUANCE
EFFECTIVE DATE
OWNER City of Meridian
CONTRACTOR: Star Construciton, LLC.
CONTRACT: Linder PRV
Description: This change order consists of the following work:
. Upgrade 40 linear feet of storm sewer to water class pipe and extend paving and sidewalk restoration limits as
appropriate. Add 12 x 10 inch reducers. Change valves and fittings as needed.
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 55,872.00
Net Increase (Decrease) from previous Change Orders
No. ~ to ~
$ 0.00
Contract Price prior to this Change Order:
$ 55,872.00
Net increase (decrease) of this Change Order:
$ 10,897.77
Contract Price with all approved Change Orders:
$ 66,769.77
RECOMMENDED
APPROVED
CHANGE IN CONTRACT TIMES:
Original Contract Times:
Substantial Completion:
Ready for final payment:
(days or dates)
Net change from previous Change Orders No. _ to
No. -
Substantial Completion:
Ready for final payment:
(days)
Contract Times prior to this Change Order:
Substantial Completion:
Ready for final payment:
(days or dates)
Net increase (decrease) this Change Order:
Substantial Completion:
Ready for final payment:
(days)
Contract Times with all approved Change Orders:
Substantial Completion:
Ready for final payment:
(days or dates)
ATTEST
Kyle Radek, PE Staff Engineer
William G. Berg, Jr., City Clerk
Tammy de Weerd, Mayor
Date:
Date:
Approved by City Council:
Date:
EJCDC 1910-8-6 (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the
Construction Specifications Institute.
t~B/~2~B6._. BB: 36
2082857947
STAR CONSTRUCTION
PAGE 01
.
STAR CONSTRUCTION, L.L.C. . ~
P.O. Box 157 Star, ID 83669 ~
Bus: (208) 286..9198 ADeil.. Cell: 867-7082 Fax: (208) 286..7947
:~
Date: 8-29..06
Fax
Number of Pages including oovtf sheet:
1
To: CilY-ofMeridian
Attn: Kyle Radek
From: Anell Irmiul!er
Phone: uLI116
Fax: 89s..'!!l
BE: 1,indpr/GI'Pp.nh"...d PRV rhll-.g,41
CC:
REMARKS:
Urgent 0
For Your~ Reply.t\SAP 0
Please Colll1ntJtt D
Kyle,
"fbe changes {(om having to extend the paving and sidewalk limits, adding 12 X 10 reducers, changing valves and
fittings, instal1.ing 40 If of 12 jncb wlllct class pipe on stOlID drain system are as fullQWS:
Materials
Sub conuactors
StaT Contlt. E&L
2354.31
1693.30
63.50.00
'total
10,897.77
Total cOst increase Rq1Jt'St(d to contract amount
]f yOU have any questions please give me a call.
Thank's Ancil Irminger
10,897.77