HomeMy WebLinkAboutVienna Woods Subdivision No. 3 FP-00-027BEFORE THE MERIDIAN CITY COUNCIL
C/C 02/06/01
IN THE MATTER OF THE
APPLICATION OF SIO/LINE
DEVELOPMENT COMPANY,
FOR APPROVAL OF FINAL PLAT
FOR VIENNA WOODS NO. 3,
LOCATED ON THE EAST SIDE
OF LOCUST GROVE BETWEEN
CHINDEN AND McMILLAN,
MERIDIAN, IDAHO
CASE NO. FP-00-027
ORDER OF CONDITIONAL
APPROVAL OF FINAL PLAT
This matter coming before the City Council for Final Plat approval
pursuant to Meridian City Code § 12-3-7 on February 6, 200 I, and the Council finding
that the Administrative Review is complete which has included certain comments and
conditions as stated in a letter to the Mayor and Council from Bruce Frecldeton,
Engineering Technician III, and Shaft Stiles, Planning and Zoning Administrator, listing 7
General Comments and 16 Site Specific Comments, which are herein found fair and
reasonable, and at the February 6, 2001 meeting, Shari Stiles, Planning and Zoning
Administrator, commented at the hearing, and no one appeared in opposition, and the
Council having considered the requirements of the preliminary plat the Council takes the
following action:
IT IS HEREBY ORDERED THAT:
ORDER OF CONDITIONAL APPROVAL OF FINAL
PLAT FOR VIENNA WOODS NO. 3 (FP-00-027) - 1
1. The Plat of "VIENNA WOODS SUBDIVISION NO. 3" as evidenced in
Plat beating the "PLAT SHOWING VIENNA WOODS SUBDWISION NO. 3, A
SKYLINE DEVELOPMENT COMPANY DEVELOPMENT, LOCATED IN THE N 1/2
OF THE SW 1/4 OF SECTION 29, TOWNSHIP 4 NORTH, RANGE 1 EAST, BOISE
MERIDIAN, ADA COUNTY, IDAHO, 2000, HAND WRITTEN DATE OF: 12/14/00,
SHEET 1 OF 3, CIVIL SURVEY CONSULTANTS, INCORPORATED, and Skyline
Development Company, Developer", is Conditionally Approved subject to those
conditions of Staff comments as set forth in the Memorandum to the Mayor and City
Council from Bruce Freckleton, Engineering Technician III, and Shati Stiles, Planning
and Zoning Administrator, dated January 29, 2001, listing 7 General Comments and 16
Site Specific Comments, and a copy of the response letter dated February 2, 2001, from
Tucker Johnson of Skyline Development Company, of which true and correct copies are
attached hereto marked Exhibit "A", and consisting of six pages, and by this reference
incorporated herein, with the additional requirements as follows, to-wit:
1.1 That at the City Council meeting of February 6, 2001, action by the
Council approved the Applicant's response letter to indude from
their letter as conditions the following:
Site Specific:
i. 1.1 (1 .) Insert the word "applicable" before "City Ordinances" as
this project is within the County, has a R-4 County zoning
designation, and is subject to the County's Ordinances as the
lead agency.
1.1.2 (2.) The corrected net density calculation is 3.15.
ORDER OF CONDITIONAL APPROVAL OF FINAL
PLAT FOR VIENNA WOODS NO. 3 (FP-00-027) - 2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.1.8
(5.) The specified improvements in the first sentence are to
be installed and approved prior to "the release of the non-
build agreement" since the City does not issue the building
permits.
(6.) Perimeter fencing is to be installed prior to "release of
non-build agreement," instead of issuance of City building
permit.
(7.) Lots 4 and 5 are very large lots (both greater than 11,500
SF). While these lots do not meet the City's front lot line
standards, these lots do meet the zoning standards of the
County R-4 zoning. Despite a good-faith attempt during the
design of the preliminary plat to comply with not only the
County Codes, but also Meridian Codes, a few lots
(approximately 10 out of 227) were approved with front
dimensions just under 80' as part of the County's rezone and
preliminary plat.
(9.) The rear lot line arrow for Lot 1 of Block 10 should point
to the north property line~ not the east property line. While
this lot's southern property line doesn't strictly comply with
the City's standards (it is 79 per staff's measuring technique
vs. 80), it does exceed the Coutny's standard of 70' for the R-
4 zoning. The house on this lot will be better situated with
the northern property line as the "rear" line with a 10' utility
easement.
(9b.) Delete (6.) As this subdivision is within the County's
lead jurisdiction.
(11.) In Vienna Woods, pertains to the City inspecting the
sewer service line the builder installs from the street to the
house. The City inspects the work within the right-of-way
when the developer is installing the sewer lines and service
stubs, but it is the State that inspects the service line from the
stub to the house, and then the State also inspects the interior
plumbing. The County does not issue the "final" approval
until the State has signed-off.
ORDER OF CONDITIONAL APPROVAL OF FINAL
PLAT FOR VIENNA WOODS NO. 3 (FP-00-027) - 3
1.1.9 (13.) Notation: The County Engineer recently indicated that
until the State Code is changed to be in compliance with last
summer's Supreme Court ruling, City signature elements will
be required on the plat - which is contrary to what the
surveyor was told a few months ago.
1.1.10 (I 5.) Notation: The non-occupancy note will likely not be
needed.
1.2
Fire Chief, Kenny Bowers, requires that no-parldng of vehides,
equipment and/or trailers will be allowed in the crt-de-sac. All
common lots will need to be kept dear of trash and weeds.
1.3
The Central District Health Department requires after written
approval from the appropriate entities are submitted, they can
approve this proposal for central sewage and central water; that plans
must be submitted to and approved by the Idaho Department of
Health and Welfare, Division of Environmental Quality for central
sewage and central water; that mn-off is not to create a mosquito
breeding problem; and it is suggested that stormwater be pretreated
through a grassy swale prior to discharge to the subsurface to prevent
impact to groundwater and surface water quality; that engineers and
architects should obtain current best management practices for
stormwater disposal and design a stormwater management system
that is preventing groundwater and surface water degradation.
Manuals for guidance:
1.3.1
State of Idaho Catalog Of Stormwater Best Management
Practices For Idaho Cities And Counties. Prepared by the
Idaho Division Of Environmental Quality, July 1997.
1.3.2 Stormwater Best Management Practices Guidebook. Prepared
by City of Boise Public Works Department, January 1997.
The final plat upon which there is contained the Certification and signature
of the City Clerk and the City Engineer verifying that the plat meets the City's
requirements shall be signed only at such time as:
ORDER OF CONDITIONAL APPROVAL OF FINAL
PLAT FOR VIENNA WOODS NO. 3 (FP-O0-027) - 4
The Plat dimensions are approved by the City Engineer; and
The City Engineer has verified that all off-site improvements are
completed and/or the appropriate letter of credit or cash has been
issued guaranteeing the completion of off-site and required on-site
improvements.
By action of the City Council at its regular meeting held on the
MAYOR ROBERT D. CORRIE
day of Y-ff~/7-,oew'b(]~- ,2001.
Copy served upon Applicant, the Planning and Zoning Department and the Public
Works Department.
B Dated: City Clerk ~' ~'
msg/z:\Work~l~vleridian2vleridian 15,60M\Vienn'woodSN°3 FPO27k~POrder027
ORDER OF CONDITIONAL APPROVAL OF FINAL
PLAT FOR VIENNA WOODS NO. 3 (FP-O0-027) - 5