Loading...
HomeMy WebLinkAboutElliott Industrial Park FP-01-001BEFORE THE MERIDIAN CITY COUNCIL C/C 02/06/01 IN THE MATTER OF THE APPLICATION OF HUBBLE ENGINEERING, INC., FOR APPROVAL OF FINAL PLAT FOR ELLIOTT INDUSTRIAL PAP, I(, LOCATED AT WILSON LANE - BEHIND D & B SUPPLY, MERIDIAN, IDAHO CASE NO. FP-OI-O01 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT This matter coming before the City Council for Final Plat approval pursuant to Meridian City Code § 12-3-7 on February 6, 2001, and the Council finding that the Administrative Review is complete which has included certain comments and conditions as stated in a letter to the Mayor and Council from Bruce Frecldeton, Engineering Technician III, and Shaft Stiles, Planning and Zoning Administrator, listing 7 General Comments and 15 Site Specific Comments, which are herein found fair and reasonable, and at the February 6, 2001 meeting, Shaft Stiles, Planning and Zoning Administrator, commented at the heating, and no one appeared in opposition, and the Council having considered the requirements of the prdiminary plat the Council takes the following action: IT IS HEREBY ORDERED THAT: ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR ELLIOTT INDUSTRIAL PARK (FP-01-001) -1 The Plat of "ELLIOTT INDUSTRIAL PARI(" as evidenced in Plat beating the "PLAT SHOWING ELLIOTT INDUSTRIAL PARK, A BUSINESS PARK, A RESUBDIVISION OF A PORTION OF LOT 7 OF PLEASANT VALLEY SUBDIVISION, LOCATED IN THE NORTH 1/2 OF SECTION 8, T.3N., R. 1E., B.M., MERIDIAN, ADA COUNTY, IDAHO, 2000, HUBBLE ENGINEERiNG, INC., MERiDIAN, IDAHO, HANDWRITTEN DATE OF: 12-26-00, STAMPED DATE OF: DEC 27 2000, 00-086-00, SHEET 1 OF 2, and Elliott Group, LLC, Developer", is Conditionally Approved subject to those conditions of Staff comments as set forth in the Memorandum to the Mayor and City Council from Bruce Freckleton, Engineering Technician III, and Shari Stiles, Planning and Zoning Administrator, dated January 31, 2001, listing 7 General Comments and 15 Site Specific Comments, a true and correct copy is attached hereto marked Exhibit "A", and consisting of three pages, and by this reference incorporated herein, with the additional requirements as follows, to-wit: 1.1 Fire Chief, Kenny Bowers, requires a turn-around to be able to get fire vehicles back to Wilson Lane. All codes will need to be met. 1.2 The Nampa & Meridian Irrigation District notes that any encroachments which might be planned within the easement must have written approval from the District. 1.3 The Central District Health Department requires after written approval from the appropriate entities are submitted, they can approve this proposal for central sewage and central water; that plans must be submitted to and approved by the Idaho Department of Health and Wdfare, Division of Environmental Quality for central sewage and central water; that run-off is not to create a mosquito breeding problem; and it is suggested that stonxtwater be pretreated ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR ELLIOTT INDUSTRIAL PARK (FP-01-001) -2 through a grassy swale prior to discharge to the subsurface to prevent impact to groundwater and surface water quality; that engineers and architects should obtain current best management practices for stormwater disposal and design a stormwater management system that is preventing groundwater and surface water degradation. Manuals for gnidance: 1.3.1 State of Idaho Catalog Of Stormwater Best Management Practices For Idaho Cities And Counties. Prepared by the Idaho Division Of Environmental Quality, July 1997. of the City Clerk and the City Engineer verifying that the plat 1.3.2 Stormwater Best Management Practices Guidebook. Prepared by City of Boise Public Works Department, January 1997. The final plat upon which there is contained the Certification and signature meets the City's requirements shall be signed only at such time as: a. The Plat dimensions are approved by the City Engineer; and The City Engineer has verified that all off-site improvements are completed and/or the appropriate letter of credit or cash has been issued guaranteeing the completion of off-site and required on-site day of improvements. By action of the City Council at its regular meeting held on the ,2o01. ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR ELLIOTT INDUSTRIAL PARK (FP-01-001) -3 Works Department. ms g/Z:\Work2vlhMeridianhMeridian 15360MXElliottlndustdalParkFPO 1.001~FPOrdetO1.001 ORDER OF CONDITIONAL APPROVAL OF FINAL PLAT FOR ELLIOTT INDUSTRIAL PARK FP-01-001) -4