Loading...
HomeMy WebLinkAboutEducation Campus CUP 02-035 CUP 02-035 October 24, 2002 MERIDIAN PLANNING & ZONING MEETING APPLICANT Joint School District No.2 ITEM NO. 5 REQUEST Public Hearing - Request for a Conditional Use Permit for an educational campus consisting of elementary school, charter/professional technical high school buildings, and school district administration center in an R-4 zone for Education Campus Subdivision - 3800 N. Locust Grov. CITY CLERK: CITY ENGINEER: CITY PLANNING DIRECTOR: CITY ATTORNEY CITY. POLICE DEPT: CITY FIRE DEPT: CITY BUILDING DEPT: CITY WATER DEPT: CITY SEWER DEPT: SANITARY SERVICE: MERIDIAN SCHOOL DISTRICT: MERIDIAN POST OFFICE: ADA COUNTY HIGHWAY DISTRICT: CENTRAL DISTRICT HEALTH: NAMPA MERIDIAN IRRIGATION: IDAHO POWER: US WEST: INTERMOUNTAIN GAS: OTHER: Contacted: Ca../kd. L/Lv. Llm v.:>/ Date: )~-2I-02 Phone: '33(p-3CN3 , 'bec:..' tJ Malenals presented at public meetings shall become property of the CIfy of Meridian. AGENCY COMMENTS See Attached Comments See Attached Comments See Attached Comments See Attached Comments "Ok per Meridian Water" '1<-t &J fl/l-l../Zlj 1.. ot Ati7~tlod 1-v (V/G 1-0 No Comment See Attached Comments See.. ~d CoWWUVl-tS See Attached Comments No Comment MAYOR Robert D. C<>rrie HUB OF TREASURE VALLEY A Good Place to Live CITY COUNCIL MEMBERS T8DIIUY deWeerd Keith Bird Cherie McCandless William L.M. Nary CITY OF MERIDIAN 33 EAST IDAHO MERIDIAN, IDAHO 83642 (208) 8S84433' FAX (208) 887-4813 City Clerk Office Fax (208) 888-'1218 MEMORANDUM: To: Mayor, City Council and Planning & Zoning Commission Bruce Freckleton, Assistant to City Engineer ~ David McKinnon, Planner II NA From: Re: Educational Campus Snbdivision LEGAL DEPARTMENT (208) 288-2499 . Fax 288-250 1 PUBUC WORKS BUILDING DEPARTMENT (208) 898-5500 . Fax 887-1297 PLANNING AND ZONING DEPARTMENT (208) 884-5533, FAX 888-6854 October 10, 2002 RECEIVED OCT 2 I 2002 City Of Meridian City Clerk Office . Request for Approval of a Preliminary Plat Consisting of Two (2) Building Lots, One (1) Other Lot and a New Public Road on 39.23 Acres of Land, in an R-4 Zone, by the Joint School District No.2 (File No, CUP-02-023). . Request for Approval of a Conditional Use Permit for the Development of a New Elementary Schoo~ Two to Three (2-3) New CharterlProfessional High Schools, and a School District Administration Building, in an Zone, by the Joint School District NO.2 (File No.CUP-02-035). We have reviewed this snbmittal and otTer the foUowing comments, as conditions of the applicant. These conditions shall be considered in full, unless expressly modified or deleted by motion of the Meridian City Couucil: APPLICATION SUMMARY & BACKGROUND The Applicant, Joint School District No.2, has requested approval of a preliminary plat consisting of two building lots, one "other" lot, and a new public road and approval of a conditional use permit for the construction of a new elementary school and a new charter high school and conceptual approval of two (2) more new charter high schools and a new School District administration building. The School District has been trying to cope with the dramatic growth rate that the City of Meridian has been experiencing for the last decade, and the School District is again in need of another new elementary school to keep pace with the rate of enrollment. The proposed elementary school is to be located east of the existing Charter High School located on Locust Grove and the new Charter high school will be located directly east of the existing school. In the future, the School District would like to construct a new administration building and several new charter high schools within the proposed subdivision. PP 02-023,CUN12-03S Education Campus.PP.CUP Planning & Zoning Commission/Mayor & City Council October 10, 2002 Page 2 The School District will be removing an existing private drive on the property that currently provides access to Jim Hollister's property located adjacent to the southeast corner of the proposed subdivision. The School District will provide access to Hollister property via the new public road that will be installed as part of this subdivision. In order to facilitate the new access to the Hollister property, the School District and Mr. Hollister have recorded a record of survey to amend the location of the original property line between the properties by forty feet. LOCATION & SURROUNDING USES The subject property's address is 3800 N. Locust Grove, located approximately a y., mile north of Ustick Road. The following uses surround the subject property: Nortb - Rural residential (Heritage Subdivision), zoned R-I (Ada County). Soutb - Summerfield Subdivision, zoned R-4. East - Rural residential-agricultural, zone RUT (Ada County). West - Quenzner Commons Subdivision, zoned R-4. PRELIMINARY PLAT FINDINGS AND REOUlREMENTS Sections 12-3-3 J.2. and 12-3-5 D read as follows: "In determining tbe acceptance of a proposed subdivision tbe Commission/Conncil sball consider tbe objectives of this title and at least tbe foUowing: a. Tbe conformance of tbe subdivision witb tbe Comprehensive Development Plan; Staff finds the subdivision is in conformance with the adopted comprehensive plan text, policies and Future Land Use Map, which designates the property as "quasi-public". b. Tbe availability of public services to accommodate tbe proposed development; Staff finds that public services are readily available to the lots within the proposed subdivision. c. Tbe continuity of the proposed development with the capital improvement program; Staff finds that the subdivision is in conformance with and will not negatively impact the capital improvement funds. d. Tbe public financial capability of supporting services for the proposed development; Staff fmds that the development will not require major expenditures by the City of Meridian for supporting services. PP 02-D23,CUN)2-035 Education Campus.PP.CUP Planning & Zoning ConunissionlMayor & City Council October 10, 2002 Page 3 e. The other health, safety or environmeutal problems that may be brought to the Commission's attention. Staff finds that there will not be any health, safety or environmental problems associated with this subdivision that should be brought to the Councilor Commission's attention. PRELIMINARY PLAT SITE SPECIFIC COMMENTS 1. The proposed pedestrian pathway/utility access lane on the south side of the property shall be constructed with an asphalt surface capable of supporting truck traffic. Additional easement to the City of Meridian will be required for any extension of the existing sanitary sewer. 2. Add a note to the preliminary plat that explains the shared/cross access easement situation for the lots. 3. Water and sewer services shall be provided via the extensions from mains existing or being installed adjacent to the proposed campus. 4. Underground, year-round pressurized irrigation must be provided to all landscape areas on site. Please submit hook-up and design details based on the proposed landscaping. Due to the size of landscaped area, primary water supply connection to the City's mains will not be allowed. Applicant shall be required to utilize any existing surface or well water for the primary source. If City water is proposed as a secondary source, developer shall be responsible to pay water assessments for the entire common open area. 5. Add a note to the face of the plat indicating who will be responsible for the maintenance of Lot I, Block I of the proposed subdivision. 6. All drainage swales shall be built in compliance with the City's Landscape Ordinance. 7. Applicant shall provide a temporary turn-around on the east end ofE. Herron's Crossing Drive in accordance with Fire Department Comments. PRELIMINARY PLAT GENERAL REOUIREMENTS l. Submit letter from the Ada County Street Name Committee, approving the subdivision and street names. Make any corrections necessary to conform. 2. Coordinate fire hydrant placement with the City of Meridian Public Works Department. 3. Assessment fees for water and sewer service are determined during the building plan review process. PP 02-D23,CUN)2-D35 Education Carnpus.PP.CUP Planning & Zoning Commission/Mayor & City Council October 10, 2002 Page 4 4. Two-hundred-fifty watt, high-pressure sodium streetlights will be required at locations designated by the Public Works Department. All streetlights shall be installed at subdivider's expense. Typica1locations are at street intersections and/or fire hydrants. 5. A letter of credit or cash surety in the amount of 110% will be required for all fencing, landscaping, pressurized irrigation, sanitary sewer, water, etc., prior to signature on the final plat. 6. All irrigation ditches, laterals or canals, exclusive of natural waterways, intersecting, crossing or lying adjacent and contiguous to the area being subdivided shall be tiled per City Ordinance 12-4-13. The ditches to be piped should be shown on the site plans. Plans will need to be approved by the appropriate irrigation/drainage district, or lateral users association, with written confirmation of said approval submitted to the Public Works Department. STANDARDS FOR CONDmONAL USES The Commission and Couucil shall review the particular facts aud circumstances of each proposed conditional use in terms of the following and may approve a conditional use permit if they shall find evidence presented at the hearing(s) is adequate to establish (11- 17-3): A. That the site is large enough to accommodate the proposed use and all yards, open spaces, parking, landscaping and other features as may be required by this Ordinance; Staff finds that the site is large enough to accommodate the required landscaping, yards and other features required by the Zoning Ordinance, B. That the proposed use and development plan will be harmonious with tbe Meridian Comprehensive Plan and in accordance with the requirements of tbis Ordinance; Staff finds that the proposed use and development plan is harmonious with recently adopted Comprehensive Plan. The Future Land Use Map designates the property as "public/quasi public" and includes a school symbol on the subject property. Staff further finds that the proposed use is in compliance with ordinances contained in the Meridian City Code. C. Tbat the design, construction, operation, and maintenance will be compatible with other uses in the general neighborhood and with the existing or intended character of the general vicinity and that such use will not adversely change the essential character of the same area; Staff finds that the proposed use will be compatible with the existing and proposed residential uses in the general vicinity. PP 02.o23,Cup.02-035 Education Campus,PP.CUP Planning & Zoning CommissionlMayor & City Council October 10, 2002 Page 5 Tbe Council and Commission should consider public testimony when determining if the proposed use will change the essential character of the area. D. That the proposed use, if it complies with all conditions of the approval imposed, will Dot adversely affect other property in the vicinity; Staff does not anticipate that the proposed uses will have an adverse affect on the other property in the vicinity, if designed, constructed, operated and maintained in accordance with any conditions of approval and the City Ordinances. The Council and Commission should rely upon public testimony to determine if the development will adversely affect the other properties in the vicinity. E. That the proposed use win be served adequately by essential public Cacilities and services such as highways, street, police, and fire protection, drainage structures, refuse disposal, water, sewer or that the person responsible for the establishment of proposed conditional use shall be able to provide adequately any such services; Staff finds that the proposed development will be adequately served by the essential public facilities and services listed above. F. That the proposed use will not create excessive additional requirements at public cost for public facilities and services and will not be detrimental to the economic welfare ofthe commnnity; Staff finds that the proposed use would not create excessive additional requirements at public cost for public facilities and service and will not be detrimental to the economic welfare of the community. Staff finds that the proposed uses will provide the needed educational facilities required to keep up with the city's explosive growth. G. That the proposed use will not involve activities or processes, materials, equipment, and conditions of operation that will be detrimental to any persons, property, or general welfare by reasou of excessive production of traffic, noise, smoke, Cumes, glare or odors; Staff does not anticipate that the proposed use will be detrimental to the general welfare ofthe community by means of increased noise, smoke fumes, glare or odors generated by the proposed educational uses. Traffic will be increased in the area, and the applicant has provided a Traffic Impact Study (TIS) that details the extent of the increased traffic at build out of the project. The increased traffic will increase the length of delays at many of the intersection in the general vicinity of the schools. Please review ACHD's analysis of the TIS and ACHD's site specific conditions of approval for further information. PP 02-023.ClJp.()2-035 Education Campus.PP.CuP Planning & Zoning CommissionlMayor & City Council October 10, 2002 Page 6 H. That the proposed use will have vehicular approaches to the property which shall be so designed as not to create an interference with traffic on surrounding public streets; Staff finds that the proposed use(s) will have vehicular approaches that will be designed to meet ACHD standards and will be designed to reduce any interference with any traffic on the surrounding public streets. L That the proposed use will uot result in the destruction, loss or damage of a uatural, scenic or historic feature considered to be of major importance. Staff finds that no natural or scenic feature will be lost, damaged or destroyed by issuance of this conditional use. SITE SPECIFIC REOUlREMENTS 1. A separate conditional use permit will be required prior to development of the "future" administration building and "future" professional technical high schools (buildings "c" and "D" on the submitted site plans). 2. Landscaping, fencing, irrigation, pathway and roadway improvements for Phase(s) 2, 2A and 3 shall be completed prior to occupancy of the new charter high school or the new elementary school. Landscaping shall be installed in the aforementioned phases as submitted on the landscape plan (dated September 12, 2002). Tree locations shall be coordinated with the Public Works Department for those areas where sanitary sewer exists or is proposed. 3. The construction and dedication of the proposed E. Heron's Crossing Drive shall be completed prior to the occupancy of the proposed elementary school. GENERAL REOUIREMENTS I. A Certificate of Zoning Compliance shall be obtained prior to applying for a building permit. 2. This Conditional Use Permit shall be valid for a maximum period of 18 months. If construction has not begun within this timeframe, a new conditional use permit must be obtained prior to the start of development. RECOMMENDATION Staff recommends approval of the applications, with the aforementioned findings and conditions of approval. pp 02-023,CUP-02-035 Education Campus.PP.CUP . . . Joseph Silva Deputy Chief Meridian Fire Department 540 E. Franklin Rd. Meridian, Id 83642 (208), 881!-1234. . . . October 16, 2002 RECEIVED OCT 1 8 2002 City Of Meridian City Clerk Office SUBJECf: City Council and Meridian Planning & Zoning Commission Joseph Silva, Deputy ChieJ; Fire Prevention Education Campus Subdivision CUP 02'()35 TO: FROM: . will be the requirements and/or concerns to provide minimum levels of fire protection for the . 'ect: consistent with Appendix ill-A of the Uniform Fire Code be provided to service the entire drants shall be placed an average of 400' llJlIIII. 1997 UFC Appendix ill-A hydrants are required before combustible construction begins. 901.3 of the water supply for fire protection will be by lhe Meridian approval of the fire hydrant locations shall be by the Meridian Fire Department. 5. All radii for internal & external rowIs shall be 28' inside and 48' outside radius. 6. A 20' wide fire lane shall be provided around the proposed R1emP.111l1ry School. 7. The proposed project will have an unknown transient popuJation and will have an unknown impact Meridian Fue Dt;pw~ requests for service. According to a report completed by Fire & Emergency Services Consulting Group in Febrwuy of 2000 our requests for service are projected to reach 2800 in the year 2005 and 3800 by the year 2010, this is up from 2069 responses in the year 2000. 8. The proposed project lies outside the tive-minuJe response zone goal. Achievement of this goal is subject to budgelary constraints and is ;.-.dM to enhance the probability of a mvorable outcome on a request for Basic Life Support. The budget constraints are typically defined as capital outlay for fucil.ities that are located within 1.5 miles from a given location and suffici- operational funds to stalfthe:fuciliti.es. A fire slation is scbedu1ed to become operational in the:full of 2003 in this service area . . . . . . . . . . . . . . . . . . . . . . . October 18, 2002 Page 2 9. An approved temporary turn-around shall be provided at the East end ofE. Heron's Crossing Drive. 10. The Meridian CitylRmal Fire Department would like to enter into discussions about establishing a parlIIership to provide a site for a public safely education center. If feasible, a site would be identified East of Phase 2A to locate a manufactured home which would be used to instruct school age children on home fire safety procedures , . ~ CENTRAL Ut8t8L!~ CENTRAL DISTRICT HEALTH DEPARTMENT Environmental Health Division Rezone # Conditional Use # Preliminary / Final/ Short Plat 01. 02. o 3. 04. 05. ('_uP ~ -DJ.r ~PC)::L~ tf"t:JlA..c.~ (' ""-f<.L:. We have No Objections to this Proposal. OCT ' : '.~nn~ j I ' !,.,..i.,;(. Return to: o Boise DEagle o Garden City ;!Meridian o Kuna DACZ o Star , We recommend Denial of this Proposal. City of MeridiaL City Clerk Offi"" Specific knowledge as to the exact type of use must be provided before we can comment on this Proposal. We will require more data concerning soil conditions on this Proposal before we can comment. o 13. We will require plans be submitted for a plan review for any: o food establishment 0 swimming pools or spas o beverage establishment 0 grocery store Before we can comment concerning individual sewage disposai, we will require more data concerning the depth of: o high seasonal ground water 0 waste flow characteristics o or bedrock from original grade 0 other o 6. This office will require a stUdy to assess the impact of nutrients and pathogens to receiving ground waters and/or surface waters. 07. ~8. ~. ~o. 011. %14. o child care center 9~a- J:~ &PrrAefoHD.? / ~r~_...-A~ .(?7J;-'-W~ Reviewed By: Date: ,/~ / 1'1'7 02- / -7'~P7H COHO 9100 Ikc Review Sheet This project shall be. reviewed by the Idaho Department of Water Resources concerning well construction and water availability. After written approval from appropriate entities are submitted, we can approve this proposal for: ~tral sewage 0 community sewage system 0 community water well o interim sewage ~entral water o individual sewage 0 individual water The following plan(s) must be submitted to and approved by the Idaho Department of Heatth & Welfare, Division of Environmental Quality: )3.untral sewage 0 community sewage system 0 community water o sewage dry lines Zcentral water Run-off is not to create a mosquito breeding problem. This Department would recommend deferral until high seasonal ground water can be determined if other considerations indicate approval. o 12. If restroom facilities are to be installed, then a sewage system MUST be installed to meet Idaho State Sewage Regulations. ~ CENTRAL {!tB~6~I~ MAIN OFfICE' 707 N. ARMSTRONG Pl' 3018E.ID 83704-0825' (208) 375-5211 . fAX 327-8500 To prevellt and treat disease alld disability; to promote hea/tlly lifestyles; and to protect and promote the IIealth alld quality of ow' elll'inJ1lmelll. STORM WATER MANAGEMENT RECOMMENDATIONS It is recommended that storm water be pre-treated through a grassy swale prior to discharge to the subsurface to prevent impact to ground water and surface water quality. The engineers and architects involved with the design of this project should obtain current best management practices for storm water disposal and design a storm water management system that is preventing groundwater and surface water degradation. Manuals that could be used for guidance are: State of Idaho Catalog of Storm water Best Management Practices For Idaho Cities and Counties. Prepared by the Idaho Division of Environmental Quality, July 1997. Stormwater Best Management Practices Guidebook Prepared by City of Boise Public Works Department, May 2000. Ado I Boise County Office 707 N. Armsrong PI. Boise, to 83704 EnVlfQ. Health: 327-7499 Family Planning: 327-7400 Immunizations: 327-7450 Senior Nutrition: 327-7460 WIC: 327.7488 FAX: 327-8500 Serving Valley, Elmore, Boise, and Ada Counties Ado.WIC Sotellile Office Elmore County Office 1606 Robert Sf 520 E. 8th Street N. Boise. JD 83705 Mountain Home, ID 83647 Ph. 334-3355 Enviro. Health: 587-9225 FAX: 334-3355 Family Health: 587-<1407 WIC: 587-4409 fAX: 587.3521 Volley County Office 703 N. 1 st Street P.O. Box 1448 McCall. 10, 83638 Ph. 634-7194 FAX: 634-2174 TO:Mericlian Clerk P:l/~ UCT-l4-2002 ~8:54A FROM:S.nit.r~ Services, I 2~8-888-5~S2 ....~. 0~ ' ~.,:~ ,; ~ oUe;;dl;~J;J.; \, ~ IMHO f ~,tlllt! 1,1M LEGAL OEr.l<rMCNT (201t} ~S9-~.I.C'j(}. F;.a.\ JMM.~SOl I'ARKS Jl n.Frn:I:.).TION (!08 8$0-3571). F:u: f1l)~-5;1iOl PlJOLJC wORKS (~OO, $1)8.5500 wF).,\ 1'llS 7.1.:97 nUILDING DEP.~RTME)<1 (~Oll) 8~7 2~11' r.,~ 3t7-1:!<)7 PI.ANNI~li ,\NO znNI~(~ (~OB) 8S4-5.s31 . r:J.... HAH-(.:{"i.J M OR ~obC'rt C1)"eo CITY COUN BERS Tan\lI1Y W,lIi.m M. Cheri. M.", . Keith TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN Tp insure that your comments and recommendations win be considered by Ihe Meridian Planning and Zoning Commission, please submit your comments and recommendations to Mendlan City Cleric's Orfice Alln: Will Be/V, City Cleric. by: - October 17.2002 ' Transmittal Dale: October 4, 2002 Hearing Date: October 24,2002 File No.: CUP 02-035 RequeS\: Conditional Use Permit for an educational campus consisting of elementary school, eh_rlprofesslonal tech high school buildings, & school dhltrict admln center In an R..\ lone for Education Campus Sub By: Joint School District No.2 Location of Property or Project: 3800 North Locust Grove Road David Zaremba. PIZ (1010 VAR, VAC, FP) Meridian School District (1010 FP) Jeoy Centers, PIZ (No VAR, VAC. FP) Meridian Post Office (FPIPP only) Leslie Mathes, P/Z (No VAR, VAC, FP) Ada county Highway DiSlriCl Keven Shreeve, P/Z INo VAR, VAC, FP) Community Planning Assoc. Keith BoruP. PIZ (No VAR. VAC, FP) Central District Health Robert Corrie, Mayor Nampa Meridian lnig. DlstoCl 8i11 Nary, CIC Selllel$ IrrigatiOn DlslriCl Tammy deWeerd, CIC Idaho Power Co. (FP/PPonly) Keith Bird, CIC U.S. West (FPIPP only) Cherie McCandless, cle Intermountain Gas (FPIPPonly) Water Department Bureau of Reclamation (FPIPP only) Sewer Department Idaho Transportation Department (No FP) Sanitary Service (No VAR, VAC, FP) Ada COunly (Ann.x.lIon only) Building Department Your Concise Remarl<S: 1.l1.. 'SorL- Fire Department L,L'''I'A';AL~ ,.d,n"''''''6 .d.L!I: (d.4b"~'J"'T"" '.'~tJ ~l-DI. -A./.8 Police Department _ .p~(N'b~ (','LA c",.. .fcIL At'L-LS'" - Pt.CI'''~f.1> /.1).. ..,.F City Attorney F.J..J~U)~o'P~ ..ft""D wr-....I~ ~,.~ttJ,..A}.,.~~1'/ ~cHalJ/~ CaRL'! ~"D1J City Engineer -a..u.. (;,/J. ~ Go" L v s.. ~, ~. Cily Planner Palils Department v RECEIVED OCT I 4 2002 City Of Meridian 33 EAST IDAHO. MERIDIAN, !DAHO 83642 City Clerk Office (lO~1 SSS.4oIjj. Fax (208) RR7.4S 13 . CilY Cte,k Oftic. F.., (208) 888-4216 . Hum", Resuu,"", F.., (21)8) 288 .1193 PAGE. 01 1"- 06-14-;'"02 '09 (05 208-888-5052 ~&~1~t)~ 1503 FIRST STREET SOUTH NAMPA, IDAHO 83651-4395 RECEIVED FAX # 208-463-0092 October 8, 2002 OCT 1 1 2Cm Phones: Area Code 208 OFFICE: Nampa 466-7861 SHOP: Nampa 466.0663 Will Berg, City Clerk City of Meridian 33 East Idaho M~crrM, W 83642 - City of Meridian City Clerk Office Re: CUP 02-035 Conditional Use Permit for Education Caronus Subdivision Dear Commissioners: The Nampa & Meridian Irrigation District has no comment on the above-mentioned application as it is out of our District. Sincerely, IJ~.R'.... '"'' Bill Henson, Asst. Water Superintendent NAMPA & MERIDIAN IRRIGATION DISTRICT BH: dll C: File - Shop File - Office Water Superintendent APPROXIMATE IRRIGABlE ACRES RIVER flOW RIGHTS - 23,000 BOISE PROJEG RIGHTS. 40.000 / MAYO Robert D. C me "'~' '~-rm. .".". : ' . .. "'" ,... , ,~ ~.-.~ Wj:o;r;tjJ- clfe~7dl~~J",; "\ IDAHO ,I; -" ,t/' PARKS & RECREATION (208 888-3579 . Fa.' 898.5501 PUBLIC WORKS (208) 898.5500 'Fa, 887.1297 BUILDING DEPARTMENT (208)887-2~II.F:J.X 8l!7-J297 PLANNING AND ZONING (208) 884-5533 . Fa, 888.6854 LEGAL DEPARTMENT (JOB.) 288-2499. Fa.'{ 288-2501 CITY COUNCIL M BERS Tammy deWeerd William L. M. Nary Cherie McCandless Keith Bird , . .V .. "ItICI 'lllIn TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City Clerk's Office Attn: Will Berg, City Clerk, by: October 17. 2002 Transmittal Date: October 4, 2002 Hearing Date: October 24, 2002 File No.: CUP 02-035 Request: Conditional Use Permit for an educational campus consisting of elementary school, charter/professional tech high schaal buildings, & schaal district admin center in an R-4 zone for Education Campus Sub By: Joint School District No.2 Location of Property or Project: 3800 North Locust Grove Road David Zaremba, P/Z (No VAR, VAC, FP) Jeny Centers, P/Z (No VAR, VAC, FP) Leslie Mathes, P/Z (No VAR, VAC, FP) Keven Shreeve, P/Z (No VAR, VAC, FP) Keith Borup, P/Z (No VAR, VAC, FP) Robert Corrie, Mayor Bill Nary, C/C Tammy deWeerd, CIC Keith Bird, CIC Cherie McCandless, CIC V Water Department Sewer Department Sanitary Service (No VAR, VAC, FP) Building Department Your Concise Remarks: Fire Department Police Department City Attomey City Engineer City Planner Parks Department Meridian School District (No FP) Meridian Post Office (FP/PP only) Ada County Highway District Community Planning Assoc, Central District Health Nampa Meridian Irrig. District Settlers Irrigation District Idaho Power Co. (FP/PPonly) U.S. West (FP/PP only) Intermountain Gas (FP/PP only) Bureau of Reclamation (FP/PPonly) Idaho Transportation Department (No FP) Ada County (Annexa6on only) Z~L~?~:1:Jr ;[t;J/l RECEIVED OCT 1 1 2002 City of Meridian City Clerk Office 33 EAST IDAHO' MERIDIAN. IDAHO 83642 (208) 888-4433' Fax (108) 887-48J3 . eil)" Clerk Omce Fa< (208) 888-4218 . Human Resources Fax (2081 288.1193 / Tllmmy de eerd \\"illt:.llll L. M. Nary Cherie M(,'Candless Keith Bird , ')'~,.:. "Yt cUe;;dl;n~; \ , ID,~HO I'" 1. -1/ " '''''T''^'''"''''''~ LEGAL DEPARTMENT (08) 288-2499. Fa;.; 2gS-2501 PARKS & RECREATION (208 888-J579 . Fax 898-5501 PUBLIC WORKS (208) 898.5500 -F:lX I\R7-1 ~97 BUILDING DEPARTMENT (208) 887-2211' Fax 887-1297 PLANNING AND ZONING (208) 884-5533 . Fax 1\88-685..\. TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN t (Q) lP V To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian City Clerk's Office Attn: Will Berg, City Clerk, by: October 17,2002 Transmittal Date: October 4, 2002 Hearing Date: October 24, 2002 File No.: CUP 02-035 Request: Conditional Use Permit for an educational campus consisting of elementary school, charter/prafessional tech high school buildings, & school district admin center in an R-4 zone for Education Campus Sub By: Joint School District No.2 Location of Property or Project: 3800 North Locust Grove Road v David Zaremba, P/Z (No VAR, VAG, FP) Jerry Centers, P/Z (No VAR, VAC, FP) Leslie Mathes, P/Z (No VAR, VAC, FP) Keven Shreeve, P/Z (No VAR, VAG, FP) Keith Borup, P/Z (No VAR, VAG, FP) Robert Corrie, Mayor Bill Nary, CIC Tammy deWeerd, CIC Keith Bird, CIC Cherie McCandless, CIC Water Department Sewer Department Sanitary Service (No VAR, VAG. FP) Building Department Your Concise Remarks: Fi~ Department ~:!r:-f/'7t a~~~J?;:-I-IUP~ VFA4"_.4<P~./.; Police Department #0 J.s ?'dVt . City Attomey . j City Engineer ~ b.. ,,-,,1t['-,""'..r- "'6h~I),L City Planner Parks Department Meridian School District (No FP) Meridian Post Office (FPIPP only) Ada County Highway District Community Planning Assoc. Central District Health Nampa Meridian Irrig. District Settlers Irrigation District Idaho Power CO. (FPIPP only) U.S. West (FPIPPonly) Intermountain Gas (FPIPP only) Bureau of Reclamation (FPIPP only) Idaho Transportation Department (No FP) Ada County (Ann.x.~on only) RECEIVED OCT 1 1 2002 City Of Meridian City Clerk Office 33 EAST IDAHO. MERIDIAN, IDAHO 83642 (208) 888.4433. Fax (208) 887-4813 . City Clerk Office Fax (208) 888-4218 . Human Resources Fax (208) 288-1193 MAYOR Robert D. Corrie ~ . . :'Co ., .-,.,.,...... ... .-". . . iJtc>"'" .J' r-... g /' CITY OF r~t1~.~_" L/VLendia:n J;; \. , IDAHO I~ ~ y ~. ,(.. .,\~ t.JtJ.T"...^"trlH'V ~ :1903 LEGAL DEPARTMENT (208) 288-2499. Fax 288-2501 PARKS & RECREATION (208888.3579. Fax 898-5501 PUBLIC WORKS (208) 898.5500 4Fax 8H7-1297 BUILDING DEPARTMENT (208) 887-2211. Fax R87-12lJ7 PLANNING AND ZONING (208) 884-5533. Fax 888-685-1. CITY COUNCIL MEMBERS Tammy deWeerd William L. M. Nary Cherie l\rlcCandless Keith Bird TRANSMITTALS TO AGENCIES FOR COMMENTS ON DEVELOPMENT PROJECTS WITH THE CITY OF MERIDIAN To insure that your comments and recommendations will be considered by the Meridian Planning and Zoning Commission, please submit your comments and recommendations to Meridian C~y Clerk's Office Attn: Will Berg, City Clerk, by: October 17, 2002 Transmittal Date: October 4, 2002 Healing Date: October 24, 2002 File No.: CUP 02-035 Request: Conditional Use Permit for an educational campus consisting of elementary school, charter/professianal tech high school buildings, & school district admin center in an R-4 zone for Education Campus Sub By: Joint School District No.2 Location of Property or Project: 3800 North Locust Grove Road David Zaremba, P/Z (No VAR, VAC, FP) Jerry Centers, P/Z (No VAR, VAC, FP) Leslie Mathes, P/Z (No VAR, VAC, FP) Keven Shreeve, P/Z (No VAR, VAC, FP) Keith Borup, P/Z (No VAR, VAC, FP) Robert Corlie, Mayor Bill Nary, C/C Tammy deWeerd, C/C Keith Bird, CIC Chelie McCandless, C/C Water Department Sewer Department San~ary Service (No VAR, VAC, FP) Building Department Your Concise Remarks: Fire Department Police Department C~y Attorney C~y Engineer City Planner Parks Department RECEIVED OCT - 8 2002 Melidian School District (No FP) Melidian Post Office (FPIPP only) Ada County Highway District Community Planning Assoc. Central Distlict Health Nampa Melidian Irrig. Distlict Settlers Irrigation Distlict Idaho Power Co. (FPIPPonly) U.S. West (FPIPP only) Intermountain Gas (FPIPP only) Bureau of Reclamation (FPIPP only) Idaho Transportation Department (No FP) Ada County (Annexation only) ;' V OCT - 200 CITY OF MERIDIAN WASTEWATER DEPT. City of Meridian City Clerk Office 33 EAST IDAHO. MERIDIAN, IDAHO 83642 (208) 888-4433 . Fax (208) 887-4813 . City Clerk Office Fax (208) 888-4218 . Human Resources Fax (208) 288-1193 ~.......-.. .".~-""",P.'",,,- AQm. Ada County Highway District . Right-of- Way & Development Department Planning Review Division This application requires Commission action due to the fact that it generates large volumes of traffic and is located within the north Meridian Pianning Area, This item is scheduled to be on the consent agenda on November 6, 2002. Tech Review for this item was held with the applicant on October 18, 2002. Please refer to the attachment for request for reconsideration guidelines. staff contact: Andrea N. Tuning, 208-387-6177, atuning@achd.ada.id.us File Numbers: Education Campus Subdivision / MPP02-023I MCUP02-035 Site address: 3800 North Locust Grove Road RECEIVED Den 1 2002 City Of Meridian _City Clerk 0fIice ~ W 5::. [pi LF Owner/Applicant: Meridian Joint School District #2 911 Meridian Road Meridian, Idaho 83642 Representative: JUB Engineers, Inc. 250 Beechwood Avenue, Suite 201 Boise, Idaho 83709 Application Information The applicant is requesting conditional use and preliminary plat approval for a 3-lot commercial subdivision on 39.23-acres. The applicant is proposing to construct a new Meridian School District Educational Campus that will include one elementary school, two senior high charter schools, two senior high professional technical high schools and one District administration building. Acreage: 39.23 Current Zoning: R-4 Proposed Zoning: R-4 Proposed buildable lots: 2 Proposed common lots: 1 Vicinity Map Meridian Education earn us 1 A. Findings of Fact 1. Trip Generation: This development is estimated to generate 2,816 additional vehicle trips per day (0 existing) based on the submitted traffic study. 2. Impact Fees: The impact fee rate from the fee tables for these uses are: There is no impact fee associated with elementary and senior high schools at this time. The impact fee for the administrative office has been classified as Government Office. which is $2,505.00 per thousand square feet of gross building area. The impact fee determination is based on the impact fee ordinance in effect at this time, 3. Traffic Impact Study: A traffic impact study was required with this application. The following is a summary of the findings: . The proposed development is projected to generate an average daily traffic (ADT) of 2,816 vehicles per day (vpd), of which the peak hour traffic (PHT) is 621 vehicles per hour (vph). . As a result of the site build-out, traffic on the vicinity roadways is expected to increase as follows: traffic on Ustick Road west of Locust Grove Road may increase by 300 vpd: traffic on Ustick Road east of Locust Grove Road may increase by 800; McMillan Road west of Locust Grove Road may increase by 200 vpd: McMillan Road east of Locust Grove may increase by 700 vpd: Locust Grove may increase by 2,700 vpd. . The overall intersection of Locust Grove Road and Ustick Road is currently operating at a LOS C with a delay of 22 seconds in the PM peak hour, and a LOS B with a delay of 20 seconds in the AM peak hour. At build-out of the educational campus site, the intersection will continue to operate at LOS C with a delay of 35 seconds in the PM peak hour, and at a LOS C with a delay of 31 seconds in the AM peak hour. . The overall intersection of Locust Grove Road and McMillan Road is currently operating at a LOS B with a delay of 14 seconds in the PM peak hour, and a LOS B with a delay of 11 seconds in the AM peak hour. At build-out of the educational campus site, the intersection will continue to operate at LOS F with a delay of 155 seconds in the PM peak hour, and at a LOS F with a delay of 80 seconds in the AM peak hour. . The south site access intersection on Locust Grove operates atan acceptable level of service with acceptable vehicular delays with a two-way stop controlled intersection. The south access on Locust Grove Road should be designed with an exclusive left-turn lane, and a right-turn iane. . The north site access intersection on Locust Grove is anticipated to operate at an LOS F with a delay of 130 seconds in the PM peak at the site access approach with a two-way stop controlled intersection. This site access intersection is anticipated to operate at a LOS D with a delay of 30 seconds in that AM peak at the site access approach, . The intersection of Ustick Road/Locust Grove Road meets the peak hour signal warrant for the 2012 background traffic conditions, The intersection will continue to meet the peak hour signal warrant for the 2012 site build-out traffic conditions. Based on the data available at the time of this study, the existing signal and intersection configuration will have adequate capacity for the 2012 build-out conditions. 2 . The intersection of Locust Grove Road/McMillan Road meets the peak hour signal warrant for the 2012 background traffic conditions. The intersection will continue to meet the peak hour signal warrant for the 2012 site build-out traffic conditions. A detailed analysis will be needed when the projected traffic volumes are reached before installing a signal. . Locust Grove Road requires left-turn and right-turn deceleration lanes for traffic turning into the site at both access intersections. Both site access intersections should have an exclusive left-turn lane with a through and right-turn lane. . Locust Grove Road, McMillan Road, and Ustick Road have adequate existing capacity to handle the traffic from the educational campus at build-out. These roads will not have adequate capacity to handle the buiid-out of the 12-square mile North Meridian Planning Area at 2020. Any improvements on these roadways should be based on the recommendations of the North Meridian Traffic Study. . The McMillan Road/Locust Grove Road intersection needs to be improved with widening of all four approaches for acceptable operation in 2012 for both build-out and non-build out conditions. The widening should include left-turn lanes on all approaches. Additional right-turn lanes are optional, but will further improve the intersection operation. . The intersection of Locust Grove Road/North Access Intersection meets the peak hour signal warrant for the 2012 build-out scenario. With the installation if a signal at this intersection, and no geometric modifications the intersection will be under capacity. A detailed analysis will be needed when the projected traffic volumes are reached before installing a signaL . The anticipated traffic volume at the south approach is 1,100 vpd, while the traffic volume at the northern approach is 3,000 vpd. The roadway leading to the northern approach should be classified as a collector street, and built to Collector Street Standards to the eastern elementary school approach. The roadway should be built to Local Street standards east of the elementary school. Access should be designated in accordance with the ACHD's access requirements. . All site access locations meet the ACHD's policy requirements. Roadway Capacity Analysis on Vicinity Roadways: Ustick W/ Locust 9.400 9.700 14.000 2-Lane Minor Under Grove Arterial Ustick E/ Locust 10.80 11.600 14.000 2-Lane Minor Under Grove Arterial McMillan W/ Locust 6.300 6,500 14.000 2-Lane Minor Under Grove Arterial McMillan E/ Locust 8.500 9.200 14.000 2-Lane Minor Under Grove Arterial Locust N/ McMillan 4.900 5.100 14.000 2-Lane Minor Under Grove Arterial Locust Ad' acent to 7900 10 600 14 000 2-Lane Minor Under 3 Grove Site Arterial Locust SI Ustick 11.300 11.700 14.000 2-Laue Minor Under Grove . Arterial Intersection Capacity: Us tick Rd.l Locust PM Silmal C C C * Grove Rd. Ustick Rd.1 Locust AM Shmal B C C * Grove Rd. McMillan/ Locust PM 4-wav B ~ ~ Grove sto McMillan! Locust d!! 4-wav B D ~ Grove sto * - Currently Signalized In addition to the submitted traffic impact study for this site, staff has included the executive summary of Washington Group International's regional (North Meridian) traffic impact study. EXECUTIVE SUMMARY OF THE NORTH MERIDIAN TRAFFIC STUDY The proposed 12-square mile study area between US 20/26 and Ustick Road and between McDermott Road and Eagle Road (Sections 25-28, 33-36 ofT4N R1W and sections 29-32 ofT4N R1 E), is selected Ada County Highway District (ACHD) for anticipated development build out. The following are the principal findings and recommendations of the study: . By the year 2020 the study area is anticipated to develop an additional 17,599 dwelling units, 2,744,000 sq. ft of office buildings, 1,929,000 sq.ft. of retail buildings, 12 elementary schools, 2 senior high schools, 2 junior high schools, 38,260 sq. ft of church buildings, and approximately 60 acres of park. . The build out scenario of the study area is projected to generate an average daily traffic (ADT) of 276,764 vehicles per day (vpd), of which the peak hour traffic (PHT) will be 28,206 vehicles per hour (vph). Out of these trips approximately 10% of the trips remain internai within each section, and 6% of the trips are pass-by trips. . The distribution of the traffic from all of the study area sections indicate that approximately 30% traffic directed towards south, 27% of the traffic directed towards east, 21 % of the traffic directed towards west and north. The remaining 22% of the traffic is distributed within the study area. . At build out, traffic on the arterials is expected to significantly increase (see Table 4). . All of the arterial intersections in the study area are currently operating at acceptable level of service of "C" or better. . By the year 2020, the majority of study intersections are projected to meet the peak hour traffic signal warrant. . A proportionate share of the impacts of the individual sections at each of the study area arterial intersections is summarized in Table 6. t Several mid-mile intersections may warrant traffic signals due to the heavy left turn traffic volume. 4 . Chinden Boulevard is forecasted with 5-lane section in the study area. Right turns lanes may be required at some access and arterial intersections, . McMillan Road is forecasted with a 5-lane section east of Black Cat. McMillan Road is forecasted with a 3-lane section west of Black Cat. At arterial intersections and at access intersections right turns lanes may be necessary, . Ustick Road is forecasted with a 5-lane section east of Black Cat. Ustick Road is forecasted with a 3-lane section west of Slack Cat. At arterial intersections and at access intersections right turns lanes may be necessary, . Linder Road forecasted with a 5-lane section in the study area. At arterial intersections and at access intersections right turns lanes may be required. . McDermott Road is forecasted with a 3-lane section in the study area. At arterial intersections and at access intersections turn lanes may be reqUired. . Black Cat Road is forecasted with a 3-lane section in the study area. At arterial intersections right tum lanes may be required, . Ten Mile Road is forecasted with a 5-lane section in the study area. At arterial intersections and at access intersections turn lanes may be required. . Meridian Road requires a 3-lane section north of McMillan and 5-lane section south of McMillan in the study area. At arterial intersections right turn lanes may be required. . Locust Grove Road requires a 3-lane section In the study area. At arterial intersections right turn lanes may be required. At Ustick Road a 5-iane section is forecasted. Staff recognizes that the amount of right-of-way dedicated with these improvements is overwhelming, and that ACHD may not have the funds to purchase such a large amount of right-of-way. In this situation it is likely that impact fee offset agreements will be utilized to offset the amount of money that ACHD will pay out-of-pocket to acquire the right-of-way. 4. Site Information: The site is currently vacant 5. Description of Adjacent Surrounding Area: a. North: Heritage Subdivision b. South: Summerfield Subdivision c. East: 102-acre vacant parcel d. West: Heritage Commons Subdivision 6. Impacted Roadways Locust Grove Road Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: 980-feet Minor arterial South of McMillan Road was 4,719 on 6/28/01 North of Ustick Road was 5,709 on 6/20/01 Setter than "C" 35 MPH Mc Millan Road Frontage: Functional Street Classification: Traffic count: O-feet Minor arterial West of Locust Grove Road was 3,598 on 6-20-01. East of Locust Grove Road was 5,135 on 6-20-01. Better than "C" 35 MPH Level of Service: Speed limit: 5 Ustick Road Frontage: Functional Street Classification: Traffic count: Level of Service: Speed limit: O-feet Minor arterial West of Locust Grove was 6,510 on 6-20-01. East of Locust Grove was 7,640 on 6-20-01. Better than "C" 35 MPH 7. Roadway Improvements Adjacent To and Near the Site Locust Grove Road is improved with 24-feet of pavement with no curb, gutter or sidewalk abutting the site. locust Grove Road will have a 5-foot detached sidewalk constructed on the west side of Locust Grove Road as a part of the Heritage Commons Subdivision. McMillan Road is improved with 2-traffic lanes with no curb, gutter or sidewalk abutting the site. Ustick Road is improved with 2-traffic lanes with no curb, gutter or sidewalk abutting the site. 8. Existing Right-ot-Way Locust Grove Road currently has 50-feet of right-of-way abutting the site (25-feet from centerline). 9. Site History The District has not previously reviewed this site. 10. Five Year Work Program There are not any roadway projects that are scheduled within this area that have been programmed in the District's Five Year Work Program. 11. Other Development in Area Staff has recently been receiving large amounts of inquiries from developers in the northwest Meridian area. Many developers are prepared to plat entire section-miles, and have site pians developed. The preliminary plans generally include upwards of 700 to 900 residential lots, schools, office/commerCiallots, and city and neighborhood parks. Some of the large developments within the North Meridian Planning area include: Bridgetower Subdivision, Keltic Heights Subdivision, Baldwin Park Subdivision and Utility Subdivision. . On October 17, 2001, the Commission approved a rezone application and a sketch plat for Keltic Heights Subdivision. Keltic Heights Subdivision is proposed to be 1,522 lots. The applicant proposed 929 residential lots, 8 commercial lots and a 585-unit multi-family subdivision on 452.16-acres. . On October 17, 2001 the Commission approved a rezone and preliminary plat application for an 8-lot industrial subdivision on 34.6-acres (Utility Subdivision). . On November 7,2001 the Commission approved rezone and annexation application for 370.55 acres, The Commission also approved a preliminary plat for 336 lots on 175.91 acres and conditional use approval for a total of 692 single-family residences, 59 senior housing units, 17 office lots, 10 commercial lots, and an elementary school (Bridgetower Subdivision). . On February 6, 2002, the Commission approved a preliminary plat application for a 272-lot residential subdivision on 78-acres (Baldwin Park). . On April 17, 2002, the Commission approved a preliminary plat application for a 285-lot subdivision on 75.4 acres (Heritage Commons Subdivision). . On May 22, 2002, the Commission approved a preliminary plat application for an 876-lot mixed- use subdivision. The subdivision consisted of 862 single-family dwellings, 171 multi-family 6 dwellings, 11 office buildings, 1 commercial building, 1 tire station, 1 city park and 1 private park (Lochsa Falls Subdivision). . On July 17, 2002, the Commission approved a request for approval for an annexation and rezone for a 135,000 square foot Middle School within the Meridian School District. . On August 21,2002, the Commission approved a preliminary plat application for a 144-lot residential subdivision on 43-acres (Sundance Place Subdivision). . On August 28,2002, the Commission approved a preliminary plat application for a 12-lot residential subdivision on 5-acres (Drawbridge Subdivision). . On September 11, 2002, the Commission approved a preliminary plat application for a 49-lot residential subdivision on 7.30-acres (Tully Cove Subdivision). . On October 23,2002, the Commission approved an 89-lot residential subdivision on 15.4-acres (Cobblefield Crossing Subdivision). Due to the large number of inquiries and submitted development applications in this area, staff and the development community realized that the potential for development in this area is extreme and the traffic impact studies that each individual developer was submitting did not include the major surrounding developments that are "in the works". If staff examines each development individually, the roadway system appears adequate, but when staff begins to add in a second or third large-scale development, the traffic capacities of these roadways (Ustick Road, McMillan Road, Ten Mile Road, Linder Road) reach their 2020 planning thresholds. Based on development patterns in this area, and the concern surrounding the abutting roadways, ACHD hired Washington Group to conduct a traffic impact study of the northwestern Meridian area from Ustick Road to Chinden Boulevard, and from Meridian Road to one-half mile west of Black Cat Road. One option for funding improving these roadways is the implementation of an extra-ordinary impact fee overlay district. Education Campus Subdivision may also be subject to any extraordinary fees that the District may impose. The second phase of the study, the economic phase has been initiated and will focus on the cost of the improvements deemed necessary by the study, including right-of-way costs. The outcome of the economic study has provided the District with an estimate of the costs to improve the roadways in the North Meridian Planning Area to handle the traffic generated by the proposed developments in the area, This final estimated cost is not yet available, as staff is still reviewing street section options that may reduce the right-of-way costs. B. . Findings for Consideration 1. Right-ot-Way District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks and bike lanes. As a part of the North Meridian Traffic Plan, it was noted that a 3-lane roadway with curb, gutter, 5- foot concrete detached sidewalks and bike lanes within 70-feet of right-of-way would be adequate to accommodate the projected traffic volumes on Locust Grove Road. Due to the fact that the North Meridian Traffic Plan recommended a 70-foot right-of-way on Locust Grove Road and the Commission has supported the recommendations in the past, staff is recommending that the 7 applicant dedicate 70-feet of right-of-way (35-feet from centerline) as opposed to 96-feet of right-of- way (48-feet from centerline). 2. Sidewalk District policy requires 5-foot wide (minimum) concrete sidewalk on all collector streets (7204.6.5). The applicant should construct 5-foot concrete sidewalk abutting the site on Locust Grove Road. The sidewalk should be located 2-feet within the new right-of-way. If the sidewalk should meander outside of the right-of-way, the applicant should provide the District with an easement. 3. Roadway Offsets District policy 7204.11.6 states that the optimum spacing for collector intersections along arterial roadways is 1,700-feet to allow adequate signal spacing, The minimum spacing that is acceptable for collector intersections along arterials is 1,300-feet. The applicant is proposing to construct East Heron's Crossing Drive at the north property line (at the half mile). This roadway location meets District policy and should be approved with this application. 4. Roadway Street Sections District policy 72-F1 B requires collector roadways to be constructed as a 46-foot street section within 70-feet of right-of-way. This right-of-way width would allow for two 11-foot travel lanes, an 11-foot center-turn lane, 6-foot bike lanes, curb, gutter, 5-foot planter strip with a 5-foot detached concrete sidewalk, The Commission has recently reviewed and approved an alternative collector roadway. The collector roadway is a reduced street section that has a 33-foot street section with curb, gutter, 5-foot detached sidewalk and bike lanes with no parking. According to the submitted traffic impact study, East Heron's Crossing Drive should be constructed as a collector roadway. The applicant is proposing to construct East Heron's Crossing Drive as a 3-lane collector roadway that tapers to a 2-lane collector roadway. The applicant is proposing to construct East Heron's Crossing Drive (from Locust Grove Road to the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road) as a 46-foot street section with three travel lanes, curb, gutter, 5-foot bike lanes, and 5-foot concrete sidewalk within 56-feet of right-of-way. The applicant has proposed that the sidewalk located on the south side of East Heron's Crossing Drive be detached and placed within an easement. The proposed street section meets District policy and is approved with this application. The applicant is proposing to construct East Heron's Crossing Drive (from the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road to the east property line) as a 36-foot street section with curb gutter and 5-foot concrete sidewalk within 50-feet of right-of-way. The proposed street section is the standard street section for a local residential roadway. Due to the fact that East Heron's Crossing Drive is proposed to stub to the east property line to a vacant 102- acre parcel, staff recommends that the roadway be constructed as a 2-lane collector roadway. Staff recommends that the 2-lane collector roadway be constructed as a 33-foot street section with curb, gutter, 5-foot detached sidewalk and bike lanes with no parking on either side. This alternative street section will accommodate future traffic volumes traveling from the east, will reduce the pavement 8 width of the road, will allow the construction of striped bike Janes, and will remain within the proposed right-of-way (50-feet). Any costs associated with the construction of East Heron's Crossing Drive should be borne by the applicant due to the fact that the Education Campus Subdivision requires the construction of the roadway to accommodate traffic volumes throughout the development. 5. Stub Streets District policy 7203.5.1 and 7205.5 requires stub streets to provide intra-neighborhood circulation and to provide access to adjoining parcels. District policy also requires temporary turnarounds with a temporary easement provided to the District at the end of stub streets that serve more than one lot, or are greater than 150-feet in length with a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". The applicant is proposing to construct East Heron's Crossing Drive as a stub street that will extend to the east property line approximately 61 D-feet south of the north property line, Staff is supportive of this location, Due to the fact that this roadway will be greater than 150-feet in depth, the applicant should construct a temporary turnaround at the terminus of the roadway and install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 6. Driveways District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 20 to align or offset a minimum of 105-feet from any existing or proposed driveway. District policy 72-F5, requires driveways located on collector or arterial roadways with a speed limit of 25 to align or offset a minimum of 1D5-feet from any existing or proposed driveway, Graveled driveways abutting public streets create maintenance problems due to gravel being tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be required to pave the driveway its full width and at least 3D-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. District policy 7207.9.3 restricts commercial driveways with daily traffic volumes over 1,000 vehicles to a maximum width of 35-feel. Most commercial driveways will be constructed as curb-cut type facilities if iocated on local streets. Curb return type driveways with 15-foot radii will be required for driveways accessing collector and arterial roadways. The applicant is proposing to construct one driveway to intersect Locust Grove Road approximately 570-feet south of the north property line. This driveway is proposed to align with East Heritage Place (a roadway that was approved on April 17, 2002 with the Heritage Commons Subdivision). This driveway meets District policy and should be approved with this application. The applicant is proposing to construct five driveways on East Heron's Crossing Drive. The applicant is proposing to construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 29D-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 40-foot wide driveway on the south side of East Heron's Crossing Drive approximately 630-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. 9 The applicant is proposing to construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 920-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 3D-foot wide driveway on the north side of East Heron's Crossing Drive approximately 1 ,060-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 2,020-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application. The applicant is proposing to construct a 30-foot wide driveway on the north side of East Heron's Crossing Drive approximately 2,300-feet east of Locust Grove Road. This driveway meets District policy and should be approved with this application, 7. Turnarounds District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius of 45-feet. The applicant should also be required to provide a minimum of a 29-foot street section on either side of any proposed center islands within the turnarounds. The medians should be constructed a minimum of 4-feet wide to total a minimum of a 1 OO-square foot area. 8. Turn Lanes According to the submitted traffic impact study, Locust Grove Road requires left-turn and right-turn deceleration lanes for traffic turning into the site at both access intersections. The applicant should construct an exclusive left-turn lane and a right turn deceleration lane on Locust Grove Road at the East Heron's Crossing Drive intersection. The applicant should coordinate the design of the lanes with the District's Traffic Services Department, 387-6140. The applicant should construct an exclusive left-tum lane and a right turn deceleration lane on Locust Grove Road at the driveway proposed to be located approximately 570-feet south of the north property line. The applicant should coordinate the design of the lanes with the District's Traffic Services Department, 387-6140. 9. No Other Access Other than the access points specifically approved with this application, direct lot access Locust Grove Road is prohibited. These restrictions should be noted on the final Plat. 10. Special Notification to the Applicant and the City of Meridian The internal parking configuration as it is proposed, will promote cut through traffic. District staff is concerned that traffic will utilize the drive aisle that is within the parking lot to travel from Locust Grove Road to East Heron's Crossing Drive. To eliminate the potential for cut through traffic, the applicant should redesign the parking lot configuration. 10 C. Site Specific Conditions of Approval 1. Dedicate 35-feet of right-of-way from the centerline of Locust Grove Road abutting the parcel by means of a warranty deed. The right-of-way purchase and sale agreement and deed must be completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business days to process the right-of-way dedication after receipt of all requested material. The owner will be paid the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if the owner submits a letter of application to the impact fee administrator prior to breaking ground, in accordance with the ACHD Ordinance in effect at that time (currently Ordinance #195), 2. Construct 5-foot concrete sidewalk abutting Locust Grove Road located 2-feet within the right-of-way. If the sidewalk meanders outside of the right-of-way, provide an easement for the sidewalk. 3. Construct East Heron's Crossing Drive at the north properly line (at the half mile), as proposed, 4. Construct East Heron's Crossing Drive (from Locust Grove Road to the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road) as a 46-foot street section with three travel lanes, curb, gutter, 5-foot bike lanes, and 5-foot concrete sidewalk within 56-feet of right-of- way, as proposed. Provide the District with an easement for the sidewalk on the south side of East Heron's Crossing Drive. 5. Construct East Heron's Crossing Drive (from the driveway that is proposed to be located approximately 2,300-feet east of Locust Grove Road to the east properly line) as a 33-foot street section with curb, gutter, 5-foot detached sidewalk and bike lanes with no parking on either side. 6. Construct East Heron's Crossing Drive as a stub street that will extend to the east properly line approXimately 610-feet south of the north property line, as proposed. Construct a temporary turnaround at the terminus of the roadway and install a sign. at the terminus of the roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE". 7. Construct a driveway to intersect Locust Grove Road approximately 570-feet south of the north property line, as proposed, 8. Construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 290-feet east of Locust Grove Road, as proposed. 9. Construct a 40-foot wide driveway on the south side of East Heron's Crossing Drive approximately 630-feet east of Locust Grove Road, as proposed. 10, Construct a 25-foot wide driveway on the south side of East Heron's Crossing Drive approximately 920-feet east of Locust Grove Road, as proposed, 11. Construct a 30-foot wide driveway on the north side of East Heron's Crossing Drive approximately 1 ,060-feet east of Locust Grove Road, as proposed. 12. Construct a 25-foot wide driveway on the south side of East Heron'.s Crossing Drive approximately 2,020-feet east of Locust Grove Road, as proposed. 11 13. Construct a 30-foot wide driveway on the north side of East Heron's Crossing Drive approximately 2,300-feet east of Locust Grove Road, as proposed, 14. Pave the driveways their full width and at least 30-feet into the site beyond the edge of pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing roadway edge. 15. Provide a minimum turning radius of 45-feet for all turnarounds. 16. Construct an exclusive left-turn lane and a right turn deceleration lane on Locust Grove Road at the East Heron's Crossing Drive intersection. Coordinate the design of the lanes with the District's Traffic Services Department, 387-6140. 17. Construct an exclusive left-turn lane and a right turn deceleration lane on Locust Grove Road at the driveway proposed to be located approximately 570-feet south of the north property line. Coordinate the design of the lanes with the District's Traffic Services Department, 387-6140. 18. Other than the access points specifically approved with this application, direct lot access Locust Grove Road is prohibited. These restrictions shall be noted on the final Plat. 19, Comply with all Standard Conditions of Approval. D. Standard Conditions of Approval 1. Any existing irrigation facilities shall be relocated outside of the right-of-way. 2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by the developer. 3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the construction of the proposed development. Contact Construction Services at 387-6280 (with file number) for details, 4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the District. Contact Construction Services at 387-6280 (with file numbers) for details. 5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual, ISPWC Standards and approved supplements, Construction Services procedures and all applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall prepare and certify all improvement plans. 6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other required permits), which incorporates any required design changes. 7. Construction, use and property development shall be in conformance with all applicable requirements of the Ada County Highway District prior to District approval for occupancy. 8. Payment of applicable road impact fees are required prior to building construction in accordance with Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance. 12 9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be required to call DIGLlNE (1-800-342-1585) at least two full business days prior to breaking ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387- 6190 in the event any ACHD conduits (spare or filled) are compromised during any phase of construction. 10. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation of any change from the Ada County Highway District. 11. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the Highway District of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. E. Conclusions of law 1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are satisfied. 2. ACHD requirements are intended to assure that the proposed use/development will not place an undue burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the proposed development. Attachments 1. Vicinity Map 2. Site Plan 3, Appeal Guidelines 13 Request for Reconsideration of Commission Action 1. Request for Reconsideration of Commission Action: A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the Commission may request reconsideration of that action, provided the request is not for a reconsideration of an action previously requested to be reconsidered, an action whose provisions have been partly and materially carried out, or an action that has created a contractual relationship with third parties. a. Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion may be seconded by any Commissioner and is voted on by all Commissioners present. If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time. b. The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m. on the day prior to the Commission's next scheduled regular meeting following the meeting at which the action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be placed on the agenda for that next scheduled regular Commission meeting. c. The request for reconsideration must be supported by written documentation setting forth new facts and information not presented at the earlier meeting, or a changed situation that has developed since the taking of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may also be supported by oral testimony at the meeting. d, If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the moment before it was voted on originaliy. It will normally be returned to ACHD staff for further review. The Commission may set the date of the meeting at which the matter is to be returned. The Commission shall only take action on the original matter at a meeting where the agenda notice so provides. e. At the meeting where the original matter is again on the agenda for Commission action, interested persons and ACHD staff may present such written and oral testimony as the President of the Commission determines to be appropriate, and the Commission may take any action the majority of the Commission deems advisable. f. If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative costs, as established by the Commission. 14 15 Meridian Education earn us L """1 '-r-.. -~ .. .-- ..- -- ....................._-. .--.. . - . I I -.1_ (-~ '---J -~- Lt.. -. -'-f'" .. 1- - _,11.- L__ ~ ----1 I I (1 I \ I I \ 1-1 I -I I I I II U I I ~ II I~ I \ I I Ll. -1 I I -\ '[ I I I II U I \ t \ F're~on oemomo,,"V aui\dlllg I I (~\ I I I I L L-' ~ ~= I _ \ =E apen Space I lement r"'---'\' terplan Supp CampUS Mas Education LK'II Aroh\tEldS lWc~IVETI oci 2 lj 2002 CITY OF MERlDl) - PUBLIC HEARING SIGN-UP SHEET October 24, 2002 DATE PROJECT NUMBER PP 02-023/ CUP 02-035 PROJECT NAME Education Campus Subdivision NAME FOR AGAINST . ..j',C;11 t\l1'Y/).~A '/... {~ I l...e.. J P;: J, J,-", ~ .i. X -/y( (, / ",'tl . '14.~A,/./1 / ?'-; I jg J 7'[)2. ! i t/ '1, . A.A"h#( "Q~/lDT~mT-.. '-' .L:.J.L l' IIJT I "roT _, u. "~ f""... ... City Clerk Office . .