Loading...
HomeMy WebLinkAboutCC - Centerline Cert CENTURION ENGINEERS, INC. Matthew Reinhart, PE City of Meridian 2323 S. Vista Ave Ste 206 Boise, ID 83705 33 E. Broadway Ave. 208.343.3381 Meridian, ID 83642 mareinhart@centengr.com 208.888.4433 March 15,2023 SUBJECT: NINE MILE CREEK BUNGALOW FINISH CENTERLINE ELEVATION STATEMENT City of Meridian We are in receipt of a geo-technical engineering report from Atlas dated September 11, 2023. The report from Atlas indicates that groundwater is anticipated to remain greater than 20 feet below ground surface throughout the year. 2 test pits were dug on the project site.The following identifies the relevant elevations from the report and construction plans: Existing ground Elev. Groundwater Elev. Test Pit 1 2639 Not encountered Test Pit 2 2639 Not encountered The lowest design elevation of the common driveway is 2639.85. Based on the above information the finish centerline elevations are set a minimum of twenty feet above the highest anticipated normal groundwater elevation. Sincerely, Matt Reinhart, PE. Centurion Engineers, Inc. GCIVIT U 11/0 Over a Century of Engineering Excellence Page 1 of 1 FNCINF-0�2