Loading...
HomeMy WebLinkAboutCommon Drive Exhibit i g aooeemom.o COMMON DRIV XHIBIT �I 84 OVERLAND RD Partners YJE ESPTA' - P W ST SUBDIVISION ETITP�Hi 11 LOTS 1 AND 2, BLOCK 1 OF RAAP RANCH SUBDIVISION, LOCATED IN THE NE 1 OF SECTION 5, 2815 East 3300 South, Salt Lake City, UT 84109 1 (801) 305-4670 www.edmpartnersxom TOWNSHIP 2 NORTH, RANGE 1 EAST, CITY OF MERIDIAN, ADA COUNTY, B.M., IDAHO. 2023. Of ® F-- J -----------------------------------1-- -----------------------------------------------------t-- — -----------------------------------------------------I-- --t--- ---------------------------------------------------------- I I THE KEEP PHASE 1 ����®® _ • 0 OU D D D D D D DO DO DO DO DO DO DO DO DO / I VICTORY RD SCALE. 1 — 20 D D D l � ® 926.48' 0 10 20 40 60 IR IR IR IR IR IR IR IR IR IR IR �, IR IR — o FffH� ® OWNER: ............. X, ® ®®®® - Jarron Langston Land Development EXISTING OPEN GRIMMET LATERAL TO BE PIPED o ® ve an®® _® 1831 East Orld Road EXISTING OPEN GRIMMET LATERAL. � ,---LATERAL TO BE BACKFILLED DR ® ® ® �� All" ® Meridian ID 83642 a 208-724-6239 ® � �® _ IPROPOSED IRRIGATION DISTRICT ®® ® �® LOT FENCING TO BE AT LOT LINE — ® AMITY AVE I of BLOCK 3 0 ® a NOTES: mesa W> � LU o OWNER U ' ® ® ® `' JARRON LANGSTON I M Q l ntu Farm/ ®Ce ry on 11 04 ,^,� PROPOSED FENCE Rockhampton 1831 E. Overland Rd I N 15.00, o / r PROJECT SITE ®® �® Meridian, ID 83642 Keep Ph. 2 D Dr E. LAKE HAZEL RD (208) 724-6239 U U I / /y CONTACT: JARRON LANGSTON N CD v N ^ I / / �V 0 0 Discovery N K M / / eep Boise Ranch o a / / / D D / Park Ph. l Golf Course SURVEYOR COMPASS LAND SURVEYING PLLC M - I / / / •OQ / / � / 623 11 TH AVE SOUTH J lvv 0 0 y1333 VICINITY MAP NAMPA, ID 83651 20.00' / J D D MERIDIAN, ID 208 608-2510 / IN/ / /OU � D 3 15.00' - ,ram �p oo (S) RICHARD GRAY, PLS SIDE v o / /> SETBACK 0 0 �13 v� D LANDSCAPE ARCHITECT 10.31' STACK ROCK GROUP �0 �0 a / / 404 S. 8TH ST., SUITE 154 BOISE, ID 83702 cl8 �3�6� �v D D D (208) 716-4787 PAVEMENT SECTION TABLE CONTACT: (LA) JESSE BUSTER S FLEXIBLE PAVEMENT ------------- AlFTy / �o MAP PATTERN C I V I U S I T E ENGINEER F,Q / o EXISTING IRRIGATION DISTRICT CONCRETE N/A EDM PARTNERS r>. GRAVEL ROAD 4k / / 24 APPHALTIC CONCRETE 2.5" PO BOX 6925 0.07 AC CRUSHED AGGREGATE BASE 4.0" BOISE, ID 83707 D D (208) 891-9968 STRUCTURAL SUBBASE 14.0" / CONTACT: CZ3 COMPACTED SUBGRADE SEE GEOTECH (PE) TED BURKE, PE \ D^ REPORT A QUALIFIED GEOTECHNICAL ENGINEER OR ENGINEERING TECHNICIAN IS FORWARD ORIENTATION OF LOT REQUIRED TO VERIFY SUBGRADE COMPETENCY AT THE TIME OF / a CONSTRUCTION. EXISTING FENCE (TO REMAIN) IN ACCORDANCE WITH THE GEOTECHNICAL REPORT PREPARED BY MTI, FILE x x DEMO FENCE #6171395g6t#B222755g El PROPOSED FENCE MATERIAL SPECIFICATIONS: ASPHALTIC CONCRETE:ASPHALT MIX SHALL MEET THE REQUIREMENTS OF ISPWC,SECTION 810 CLASS III PLANT MIX. MATERIALS SHALL BE PLACED IN ACCORDANCE WITH ISPWC STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. AGGREGATE BASE: MATERIAL COMPLYING WITH ISPWC STANDARDS FOR ONA L FN�� CRUSHED AGGREGATE MATERIALS. F F STRUCTURAL SUBBASE:GRANULAR STRUCTURAL FILL MATERIAL COMPLYING Q WITH THE REQUIREMENTS DETAILED IN THE STRUCTURAL FILL SECTION OF THIS REPORT EXCEPT 14176 on '� THAT THE MAXIMUM MATERIAL DIAMETER IS NO MORE p THAN 2 THE COMPONENT THICKNESS.GRADATION AND cP 1/5/2 4 O TEMPORARY FIRE TURNAROUND TO COMPLY WITH IFC FIGURE D103.1. 3 R SUITABILITY REQUIREMENTS SHALL BE PER ISPWC EX. GRAVEL ROAD TO BE WIDENED TO PROVIDE REQUIRED TURNAROUND WIDTH SECTION 801,TABLE 1. 9 J w Ro R . UPON FUTURE EXTENSION OF S. NETHERFIELD WAY, TEMPORARY TURNAROUND WILL BE REMOVED. THE EX. GRAVEL ROAD WILL q BE RETURNED TO ITS ORIGINAL CONDITION/WIDTH AND THE OPEN SPACE AREA AND S. NETHERFIELD WAY ROAD SECTION WILL BE o FINALIZED. ADDITIONALLY, PROJECT BOUNDARY FENCING WILL BE COMPLETED IN THE AREA WITHIN THE TEMPORARY TURNAROUND. 0 Keep West U v Subdivision COMMON DRIVE EXHIBIT / PROJECT: DRAWN BY: KMW N REVIEWED BY: ERB COMMON DRIVE #1 SECTION REVISIONS: No. DATE REMARKS v H U J J U d d U 20.00' U O Cr �0 2.00%- O .......... ...... . .. ........................................................ January 5 2024 \ x \ \ PAVEMENT SECTION, PER PROJECT \ SHEET NUMBER: GEOTECHNICAL REPORTEXH �2 Q / A