HomeMy WebLinkAboutCC - Storm Drainage Calcs -CKENGINEERING P. C . Civil Engineering * Project Management DRAINAGE CALCULATIONS FOR: Greycri f Estates Subdivision #5 Meridian,Ada County, Idaho November 8th, 2023 �S\p NA L F� G\STE Gl 9412 11/08/23 CiS.T�TE OF \OP��Q' OS. KIN�� Prepared for: KB HOME IDAHO, LLC 1299 N. Orchard St, Suite 210 Boise, ID 83702 Sabrina Durtschi (208)-250-6161 Prepared by: CK Engineering, P.C. Chad Kinkela, P.E. 130o E. State St. Ste 102 Eagle, ID 83616 (208)-639-1992 CK Engineering 13oo E.Stake St Suite tot Eagle,ID 836t6 208.869.osgo mobile chad@ck-engineers.com 1C. ENGINEERING P . C . ' Civii Engineering * Project Management Drainage Narrative for GREYCLIFF ESTATES SUBDIVISION #5 Greycliff Estates Subdivision #5 consists of 4 drainage areas that drain to 2 different permanent Seepage Beds. These seepage beds will be owned and maintained by the Ada County Highway District (ACHD) and built using ACHD's requested Best Management Practices (BMP's) The geotechnical engineering report that was referenced as part of this design was created by Natural Resource Solutions LLC, dated February 17, 2021. The design infiltration rate used for this project was set at 8"/hr.All storm drain facilities will require onsite percolation testing at the location and depth of infiltration in order to verify this percolation rate. Over excavation may be required to reach material that will allow 8"/hr percolation. If over excavation is required, clean pit run may be used as a backfill to get back to grade. If 8"/hr cannot be achieved, the facility will need to be redesigned. Groundwater is not expected to be present on site and is anticipated to be below 25 feet deep in this area. Seepage Trench #1 Seepage Trench #1 will be a public, permanent storm drain facility designed per ACHD BMP20. It will accept runoff from drainage areas #1—#2. These areas combine for a total area of 3.82 acres. The total time of concentration for this area is calculated at 38.69 minutes.This results in a too year storm intensity of 1.25 in/hr and a 25 year intensity of o.90 in/hr. The total weighted C value of a single family subdivision is 0.50.These combined numbers result in a total too year flow of 2.39 CFS to Seepage Bed #1 and a total 25 year flow of 1.72CFS to Seepage Bed #1. Considering the calculated storm run-off numbers, the required too year storm volume for the Seepage Bed #1 is 8,250 CF. Seepage Bed #x is to be 15'Wxll'Dxli6'L. With a void ratio of 0.4 and design infiltration rate of 8"/hr. This bed will be sufficiently sized. Please see the attached calculations for Seepage Bed #1. CK Engineering 13oo E.State St Suite 102 Eagle,ID 83616 208.869.o590 mobile chad@ck-engincers.com C- ENGINEERING P. C. Civil Engineering * Project Management Seepage Trench #2 Seepage Trench #2 will be a public, permanent storm drain facility designed per ACHD BMP20. It will accept runoff from drainage areas #3-#4. These areas combine for a total area of 2.03 acres. The total time of concentration for this area is calculated at 38.72 minutes.This results in a too year storm intensity of 1.25 in/hr and a 25 year intensity of o.90 in/hr. The total weighted C. value of a single family subdivision is 0.50.These combined numbers result in a total too year flow of 1.27 CFS to Seepage Bed #2 and a total 25 year flow of 0.92 CFS to Seepage Bed #2. Considering the calculated storm run-off numbers, the required too year storm volume for the Seepage Bed #2 is 4,396 CF. Seepage Bed #2 is to be 15'Wx11'Dx62'L. With a void ratio of 0.4 and design infiltration rate of 8"/hr. This bed will be sufficiently sized. Please see the attached calculations for Seepage Bed #2. Attached: 1. Storm drain calculations for 2 seepage beds and 2 sand and grease traps within this project. 2. 11"x17" colored drainage area exhibit for new phase #5 drainage areas 3. Geotechnical Engineering Report End of Narrative CK Engineering i3oo E.State St Suite 102 Eagle,ID 836t6 208.869.0590 mobile chad@ck-engineers.com TIME OF CONCENTRATION PROJECT Greydiff Subdivision#5 BASIN: Seepage Bed#1 (D.A.s#1-2) OVERLAND SHEET FLOW IT1): T _ 0.007(nd" ,WHERE: n= 0.24 ` �P �0.5 --- L1= 106 2 P2= 1.2 where: s= 0.01 Tt - travel time(hr), n Manning's roughness coefficient Ti (hrs)= 0.537 L = flow length(ft) P2 2.year,24-hour rainfall(in) T 1 (min)= 32.22 s - slope of hydraulic grade line (land slope,ft/ft) GUTTER CONCENTRATED FLOW: s2= 0.0044 V =20. 60" ,WHERE: V2= 1.35 L2= 524 T2= L2N2 T2 (s)= 388.6067 T2(min)= 6.48 CHANNEL/PIPE FLOW: IT3) Pipe D(in)= 2 1 V_ 1.49r3s2 , WHERE: Ac(ft)= 0.00 n Pw(ft)= 0.00 where: r= 0.00 V = average velocity(ft/s) s= 0.0000 r= hydraulic radius(ft)and is equal to a/p,, n= 0.000 a= cross sectional flow area(W) V3= 0.00 pW= wetted perimeter(ft) s= slope of the hydraulic grade line(channel L3= 0 slope,ft/ft) n= Manning's roughness coefficient for open channel flow. T3(s)= 0.00 T3(min)= 0.00 T3 = L3/1/3 TOTAL TIME OF CONCENTRATION (Tl+T2+T3) Tc= 38.69 min TIME I in hr TIME I in hr TIME I in hr 10 min 2.58 50 min 1 12 hr 0.16 15 min 2.18 1 hr 0.96 24 hr 0.1 20 min 1.81 2 hr 0.54 30 min 1.51 3 hr 0.4 40 min 1.15 6 hr 0.25 100 YR STORM INTENSITY GIVEN WITH TIME OF CONCENTRATION .38.69"rain 1:2 :(IN/HR) WEIGHTED RUNOFF COEFFICIANT PEAK DESIGN STORM RUNOFF C= 0.5 Q=c(I)(A) DRAIN AREA SIZE SF SIZE AC INTENSITY C BASIN PEAK RUNOFF CATCH BASIN DA#1 63352 1.454 1.25 0.5 0.91 cfs CB#1 DA#2 103018 2.365 1.25 0.5 1.48 cfs CB#2 TOTAL: 166370 3.819 1.25 0.5 2.39 cfs 25 YR STORM INTENSITY GIVEN WITH TIME OF CONCENTRATION 38.69,MI .91(IN/HR) WEIGHTED RUNOFF COEFFICIANT PEAK DESIGN STORM RUNOFF A Q=c(I)(A) DRAIN AREA SIZE SF SIZE AC INTENSITY C BASIN PEAK RUNOFF CATCH BASIN DA#1 63352 1.454 0.9 0.5 0.65 cfs CB#1 DA#2 103018 2.365 0.9 0.5 1.06 cfs CB#2 TOTAL: 166370 3.819 1.25 0.5 1.72 cfs ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is Intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineer's methodology most result In facilities that meet or exceed these calculations in order to be accepted. (hw.iBprt In yellow cells. 1 Project Name GraydHf Estates Subdivision#5-Seepage Bed 41 2 Is area drainage basin map provided? YES (map must he included with stormwater calculations) 3 Enter Design Storm(1DD-Year or 2S•Year With 300-Year Flood Route) 100, 4 Enter number of storage fac lities(25 max) 1 Click to Show More Subbasins f Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin2 3 4 5 Subbasin( 7 8 9 10 S Area of Drainage Subbasin(SF or Acres) SF 63r352 203r018 Acres 3.82 6 Determine the Weighted Runoff Coefficient(C) 0.s0 O.so C=(tC1xA1)+(C2xA2)+(CnxAn))/A Weighted Avg] 0.50 7 alit,[akulate� Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 min i�M,. E Estimated Runoff Coefficients for Various Surface - Type of Surface }Runoff Coefficients"r Business Oawntown area r 0.70-0.95 Hydraulic urban nelgp borhoods 0.50-0.70 Radius Flow Residential Intercept A/Wet VelocityY Flow Time Skyle Family o.3s-0.50 iD P Size in Slo a ft/lt Coeff. Len h Manningn Perm s mini Multi-,tlfaralK O.2".40 Resklentlal trurall 0.25-0.40 WE t u P Fhrw Apartment owellin;Areas 0.70 a 0 0 0 0.000 0.00 industrial and Cx mmerclal Llghtareas 0.90 race,?areas 0.90 ent 2:Gutter Shallow Concentrated now m Pa+ks,Cemeteries 0.10-0.25 t 0.004 0.619 524 1.3 6.5 MeyiErounds I0.20-0.35 Railroad xe�d arws-- 1 0.20-0.40 fSelrant 3:Overland Sheet Flow B Tit-SS[300-ft c 0.010 106 0.240 3.3 32.2 Computed77 38.7 t-ser-Entered Tc= 38.7 8 Determine the average rainfall intensity(1)from IDF Curve based on Tc I LZS i r 9 Calculate the Post-Development peak discharge(QPeak) Clow 2.39 cta 10 Calcuate total runoff M(V)(for sizing primarystorage) V 61600 ft V e Cl(rcaGD A 6OG 11 Calculate Volume of Runoff Reducvon Vrr Enter Peraentge Storm I(95th percentile+0.60 in} 95th 0.60 1 Enter Runoff FedLrctlon Vol(9Stb Percentile=0.60•-a x Area x Q V 4,12S R' 12 Detention:Apprmed Discharge Rate toSurface Waters(Ifapplicable) O.00;cfs 13 Volume Summary unlmproved areas 0.10-0.30 Surface Storage-0asin streets m .95 13anforebay V 660 ft' Concrete .0s5 PrTary Treatment/Storage Ba. V 5,940 Asphalt 0fe orki 10.95 Subsurface Storage Reefs 10.95 10.73 Volume Without Sediment Factcr(SeeBMP20Tab� V 6,600 fts Fields:Sandy sail ScuType Slope A B C .0 Flat:0-2% 0.04 0.07 0.11 IN Average:2.6% 0.09 0.12 0.11 Q. 5t :n6% 0.13 mis i o.23 P Adapted from ASCE DUB Homes\Greycliff Sub\DOCUMENTS\PHASE S\DRAINAGE CALCS\GRYCLFRS SEEPAGEBED 41_10.24.23.xlsm 11/9/2023,4 31 PM Version 10.0,May 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineers methodology must result in facilities that meet or exceed these calculations in order to be accepted. User input in yellow cells. 1 Project Name Graycliff Estates Subdivision#S-Seepage Bed fit 2 Enter number of Sand/Grease Traps(25 maxi 1 Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area(ftz) 0.5 fps Velocity S1G Traps Q-cfs inch inch max. ok? 1000 G 1 2.39 20 60 8.33 0.29 Reference for Throat widths(inch) Boise ADS Vault Lar-ken WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a QU1000 n/a n/a 60 QU1500 n/a n/a 60 DAKB Homes\Greydiff Sub\DOCUMENTS\PHASE S\DRAINAGE CALCS\GRVCLF#5 SEEPAGEBED tt1_10-24-23.xlsm 11/9/2023,4:31 PM Version 10.0,May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is Intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineers methodology must result in facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls information from the"Peak Q,V"tab Calculate Post-Development Flows(for pre-development Rows,Increase number of storage facilities to create new tab) User input In yellow cells. 1 Project Name Greycn f Estates Subdivision i15-Seepage Bed 61 2 Enter number of Seepa a Beds i.25 max) 1 3 Design Storm 100 4 Weighted Runoff Coefficient C 0.50 Link to: �av rass 5 Area A(Acres) 3.82 acres 6 Approved discharge rate(if applicable) D.00 cis 7 Is Seepage Bed in Common Lot? No V 8,250 fts 25%Sediment 8 Set Total Design Width of All Drain Rock W 15.0 ft 9 Set Total Design Depth of All Drain Rock 0 11.0 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"Chips 11 Design Infiltration Rate(8 In/hr max) Perc 8.00 infhr 12 Size of WQ Perf Pipe(Pert 18n Dia pipe 18 in 13 Size of Overflow Perf Pipe(Perfs 360°),REQD If QSOD>3.3 cfs in 14 Calculate Total Storage per Foot Spf 71.2 Oft 15 Calculate Design Length L 116 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 116 ft 17 Variable Infiltration Window W SWW 15.0 ft 18 Time to Drain SA hours 90%volume in 48-hours minimum - 19 Length of WQ&Overflow Perf pipes 116 ft 20 Perf Pipe Checks.Qperf>=Qpeak; where Qip erf=CdxA)M 2xg%H) Note:This assumes chambers are organized in a rectangular layout. 1-StormTech, 1 Type of Chambers SC74D 2 Volume to Store V 0 ft, 3 Installed Chamber Width Cw 4.25 ft Installed Chamber Depth Cd 2.50 ft Installed Chamber Height Ch 7.12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 ft;/Linn 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 fl?/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ftz 9 Volume Infiltration Vperc 0 ftr/hr 10 Time to Drain hours 90%volume in 48-hours minimum M\KB Homes\Greyciiff Sub\DOCUMENTS\PHASE 5\DRAINAGE CALCS\GRYCLFg5 SEEPAGEBED#1_10-24-23.xism 11/9/2023,4.31 PM Version 10.0,May 2018 TIME OF CONCENTRATION PROJECT. Greycliff Subdivision#5 BASIN: Seepage Bed#2 (D.A.s#3-4) OVERLAND SHEET FLOW(TI : 0.007(nL)" , WHERE: n = 0.24E Tt = lP }0.69o.4 L1= 122 2 P2= 1.2 where: s= 0.131 Tt = travel time(hr), n = Manning's roughness coefficient T1 (hrs)= 0.601 L = flow length(ft) P2 = 2-year,29-hour rainfall(in) T1 (min)= 36.05 s = slope of hydraulic grade line (land slope,ft/ft) GUTTER CONCENTRATED FLOW: s2= 0.004 V -20,cWR)" ,WHERE: V2= 1.29 L2= 20fi Tz= L2/V2 T2 (s)= 160.2295 T2(min)= 2.67 CHANNEUPIPE FLOW:M) Pipe D(in)= 0 2 1 V_ 1.49082 ,WHERE: Ac(ft)= 0.00 n Pw(ft)= 0.00 where: r= 0.00 s= 0.0000 V = average velocity(f/s) r= hydraulic radius(ft)and is equal to alp„, n= 0.000 a= cross sectional flow area(W) V3= 0.00 p,,= wetted perimeter(ft) s= slope of the hydraulic grade line(channel L3= 0 slope,ft/ft) n= Manning's roughness coefficient for open channel flow. T3(s)= 0.00 T3(min)= 0.00 T3 = L3N3 TOTAL TIME OF CONCENTRATION T1+T2+T3 Tc= 38.72 min TIME I in hr TIME I in hr TIME I in hr 10 min 2.58 50 min 1 12 hr 0.16 15 min 2.18 1 hr 0.96 24 hr 0.1 20 min 1.81 2 hr 0.54 30 min 1.51 3 hr 0.4 40 min 1.15 6 hr 0.25 100 YR STORM INTENSITY GIVEN WITH TIME OF CONCENTRATION 38.72 min 5;(IN/HR) WEIGHTED RUNOFF COEFFICIANT PEAK DESIGN STORM RUNOFF C= S J --'} Q=c(I)(A) DRAIN AREA SIZE SF SIZE AC INTENSITY C BASIN PEAK RUNOFF CATCH BASIN DA#3 45876 1.053 1.25 0.5 0.66 cfs CB#3 DA#4 42773 0.982 1.25 0.5 0.61 cfs CB#4 TOTAL: 88649 2.035 1.25 0.5 1.27 cfs 25 YR STORM INTENSITY GIVEN WITH TIME OF CONCENTRATION 38:7 M '�� - t _0_9 (IN/HR) WEIGHTED RUNOFF COEFFICIANT PEAK DESIGN STORM RUNOFF C= D:5 Q=c(I)(A) DRAIN AREA SIZE SF SIZE AC INTENSITY C BASIN PEAK RUNOFF CATCH BASIN DA#3 45876 1.053 0.9 0.5 0.47 cfs CB#3 DA#4 42773 0.982 0.9 0.5 0.44 cfs CB#4 TOTAL: 88649 2.035 1.25 0.5 0.92 cfs ACHD Calculation Sheet for Finding Peak Discharge/Volume-Rational Method NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineers methodology must result in facilities that meet or exceed these calculations in order to be accepted. 4 User Input In yellow cells. 1 Project Name Graycliff Estates Subdivision NS•Seepage Bed 02 2 Is area drainage basin map provided? YES (map must be included with stormwoter calculations) 3 Enter Design Storm(100-Year or 25-Year With 100-Year Flood Route) 100 4 Enter number of storage facilities(2S max) 1 Click to Show More Subbasins Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin Subbasin 1 Subbasin 2 3 4 S Subbasin 6 7 8 9 10 5 Area of Drainage Subbasin(SF or Acres► SF 45,06 42,773 Acre 2.04 6 Determine the Weighted Runoff Coefficient(C) 0�4 ! C=((C1xA1)+JC2xA2)+(CnxAn)j/A Weighted AvgJ 0,50 7 [.:-.er cakuiate� Calculate Overland Flow Time of Concentration in Minutes(Tc)or use default 10 min Min Estimated Runoff Coefficients for Various Surfaa — Type of Surface Runoff Coefficients"t Business Downtown•rags 0.70A.95 Hydraulic urban ni ilthbcrhoods 0.50-0.70 Radius Flow Residential Intercept A/Wet Velocity V Flaw Time I shral.F.mily 0.35-0.50 ID PI a Size in Sloe ft Coeff. Length Manningn Perm s min Mutt-Z74y 0.6".75 Residential(rurall 0.25-0.40 Segment 1:Pipe now I Apartment DwellinLAreas 0,70 a 0 0 1 1 0 1 0.000 0.00 i Indrrstdaland Commercial UgM•rasp 0.30 ment 2•Gutter Shahiaw Concentrated Flow He■5k areas 0.90 Yams,Cemeteries 0.10-0.25 b D.004 1 0.519 1 206 1 1 1.9 2.7 F v�agrounds 0.20.0.35 Railroad Vard preps 0.20-0.40_ ment 3:Overland Sheet Fk1wB TR-55 �300 it c 0.010 122 1 0.240 3A 36.1 Computed Tc= 38.7 U rteredTc- 38.7 8 Determine the average rainfall Intensity;i)from IDF Curve based on Tc i L2S InIFr 9 Calculate the Post-Development peak discharge(gPeak) Qva.t L27 cfs 10 Calculate total runoffvol(V)(for sizing primary sto(age) V 3,517 ft V-C1(Tc-6D)Ax36W 11 Calculate Volume of Runoff Reduction Vrr Enter Percentile Storm 1(95th percentile-0.60 in) 95Nt 1160 In Enter Runoff Reduction Vol(95th Percentilea0.60-In x.Area x C) VR 2,198 It. ' 12 Detention:Approved Discharge Rate to Surface Waters(if applicable) MW icfs 13 Volume Summary unimpmved areas 0.10-0.30 Surface Storage:Bas:n streets Asphs Basin Fambay V 3S2 fta C*mFq 0.95 Concrete 0.95 Primary Treatment/StorageBasin V 3,16S ' Brick 0.9S _- Subsurface Storage Roots _ 0.95 I Gravel 0.75 Volume Without Sediment Factor(See BMP20Tab) V 3,517 Fields:Sandy soll Soil Type slope A B C D Flst.0-2% 0.04 0.07 0.11 0. Average:26% 0.09 0.12 0.15 0. Steep:>6% 0.13 f 0.18 0.23 10. Adapted from ASCE D:\KB Homes\Greycliff Sub�DOCUMENTS\PHASE 5\DRAINAGE CAtCS\GRYCLFNS SEEPAGESED a2_10-24-23 xlsm 11/9/2023,4;31 PM Version 10.0,May 2018 ACHD Calculation Sheet for Sand/Grease Traps NOTE.This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology. These calculations shall establish a minimum requirement.The Engineer's methodology must result in facilities that meet or exceed these calculations in order to be accepted. User Input in yellow cells. 1 Project Name Graycliff Estates Subdivision#5-Seepage Bed fit 2 Enter number of Sand/Grease Traps(25 max) 1 Number of Peak Flow Baffle Throat Velocity Is the Vault Size Spacing width Area(ftx) 0.5 fps Velocity S/G Traps Q-cfs inch inch max. ok7 1000 G 1 1.27 20 60 8.33 0.15 Reference for Throat widths(inch) Boise ADS Vault Lar-ken WQU, BMP 16 1000 G 48.0 50.5 n/a 1500 G 60.0 61.5 n/a QU1000 n/a n/a 60 QU1500 n/a n/a 60 DAKB Homes\Greycliff Sub\DOCUMENTS\PHASE 5\13RAINAGE CALCS\GRYCLF#5 SEEPAGEBED#2_10-24-23.xlsm 11/9/2023,4:32 PM Version 10.0,May 2018 ACHD Calculation Sheet for Sizing Seepage Bed With Optional Chambers NOTE:This worksheet is intended to be a guideline to standardize ACHD checking of drainage calculations and shall not replace the Engineer's calculation methodology.These calculations shall establish a minimum requirement.The Engineers methodology must result In facilities that meet or exceed these calculations in order to be accepted. Note this spreadsheet pulls Information from the"Peak QV"tab Calculate Post-Development Flows(for pre-development Rows,Increase number of storage facilities to create new tab) User Input In yellow tells. 1 Project Name GraycBif Estates Subftislon#5-Seepage Bed 02 2 Enter number of Seepage Beds(25 max) 1 3 Design Storm 100 4 Weighted Runoff Coefficient C 0.50 link to: V - QV TR55 S Area A(Acres) 2.04 acres 6 Approved discharge rate(if applicable) 0.00 cfs 7 Is Seepage Bed in Common Lot? No V 4,396 ftr 25%Sediment 8 Set Total Design Width of All Drain Rock W 15.0 ft 9 Set Total Design Depth of All Drain Rock D 11.0 ft Rock Only,Do Not Include Filter Sand Depth or Cover 10 Void Ratio of Drain Rock Voids 0.4 0.4 for 1.5"-2"drain rock and 3/4"[hips 31 Design Infiltration Rate(8 in/hr max) Perc 8.OD In/hr 12 Site of WO Perf Pipe(Perf 180°) Dia pipe 18 In 13 Size of overflow Perf Pipe(Perfs 36CP),READ If Q300>3.3 tfs In 14 Calculate Total Storage per Foot Spf 71.2 Oft 15 Calculate Design Length L 62 ft Override Value Required for Chambers 16 Variable Infiltration Window L SWL 62 ft 17 Variable Infiltration Window W SWW 15.0 ft 18 Time to Drain 6.4 hours 90%volume in 4"ours minimum - 19 Length of WQ&Overflow Pert Pipes 62 ft 20 Perf Pipe Checks.01perf>=dpeak; where Ciperf-CdxAxJ(2xgxH) Note:This assumes chambers are organized In a rectangular layout. 1-StormTech, 1 Type of Chambers SC740 2 Volume to Store V 0 ftz 3 Installed Chamber Width Cw 4.2S ft Installed Chamber Depth Cd 2-50 ft Installed Chamber Height Ch 7-12 ft 4 Chamber Void Factor 5 Chamber Storage Volume,Without Rock,Per Manuf 45.90 f?/Unit 6 Chamber Storage Volume,With Rock,Per Manuf 74.90 ftz/Unit 7 Total Number of Units Required 0 ea 8 Area of Infiltration Aperc ft' 9 Volume Infiltration Vperc 0 ft;/hr 10 Time to Drain hours 90%volume in 48-hours minimum DAKB Homes\GreycliR Sub\DOCUMENTS\PHASE 5\DRAINAGE CALCS\GRYCLNI5 SEE PAGESED 02 10 24 23.xism 11/9/2023,4-32 PM Version 10.0,May 2018 DRAINAGE AREAS SEEPAGE BED 11 N D-1 = 63,352 SQFT. — CB#1 — SO TRAP #1 0 80' 160' D-2 = 103,018 SQFT. — CB#2 — SO TRAP #1 W E TOATAL AREA = 166,370 SQFT. SCALE 1" = 80' S SEEPAGE BED 12 D-3 = 45,876 SQFT. — CB#3 — SO TRAP #2 D-4 = 42,773 SQFT. — CB#4 — SO TRAP #2 TOTAL AREA = 88.649 SOFT EXISTING GRAYCLIFF #4 _ - - -�s� - - - - 22 38 23 I EXISTING 1 2 BLocK�3 4 5 6 7 8 eLocK� 0 T (D (D 0 G 9 10 11 12 13 GRAYCLIFF #4 39 I 14 15 / 40 / I BLOC- I - - +N + + S&G TRAP #1 108-.50_L F SEEPAGE BED #1 D-1 CB - r —D--3 T III—III — IiII —IIiIIIII — / K3 Z LL. (26) 122 LF 24 23 22 (19 1830 �7 � CB#32 22 �In ��CB#2' CB#1 524LF CB#3 20 6FXLt CB#1 C6#3 CB#4 108.50LF9LF S&G TRAP 2 214LF 109LF CB#2 CB 2 SEEPAGE BED #2 CB#4 4 48 49 50 51 52 53 1 O2 OO I5 CJ D-4 U�8 m J45 I P'l 7//// KB HOMES D RA �l AG E REVISIONS: DRAWN BY: DRS CHECKED BY: CSK CK ENGINEERING G R EY C U F F ESTATES SUBDVISION #5 DATE: 10/24/23 1300 E. STATE ST., SUITE 102 616 M ER D AN ADA COUNTY DAHO AR EAS FILE: X_MESE_GRYIFFSU .DWG EAGLE, D 83-1 PHONE 208-639-1992 9 9 D R: D:\KB HOMES\GREYCLIFF SUB\CKDWGS\PHASE 5