July 17, 2006
,~"'it,,-
A~
-. :!
6o-wtred'l't, ~~
John S. Franden, President
Carol A. McKee, 1st Vice President
Dave Bivens, 2nd Vice President
Sherry R. Huber, Commissioner
Rebecca W. Arnold, Commissioner
To:
Horizon Development
PO Box 191096
Boise, 10 83719
RE'1'('i' - "<
., '..,.1 ;",_/ E lVE I)
JUL 2 7 2006
City Of MeridjaJJ
City Clerk Of1:1Ge
Subject:
M PP-06-028/MAZ-06-028/MCU P-06-021
Touchstone Place Subdivision
1187 E. Fairview
On July 20, 2006, the Ada County Highway District Staff acted on your application for the above
referenced project. The attached report lists site-specific requirements, conditions of approval and
street improvements, which are required.
If you have any questions, please feel free to contact me at 208-387-6178.
Sincerely,
~twtr WLt/4 ~
Mindy Wallace
Planner II
Right-of-way & Development Services
Ada Cmmty Highway District
CC: Project file. Utilities
City of Meridian
Briggs Engineering
Clarence & Berna Morgan
Ada County Highway District. 3775 Adams Street. Garden City, ID · 83714 · PH 208-387-6100 · FX 345-7650 · www.achd.ada.id.us
Right-of- Way & Development Services Department
,~"'it,,,,
ACHD
~
6o-wtred'l't, ~ae-
Project/File:
Touchstone Place - MPP~06-028/MAZ-06-028/MCUP-06-021
This is a preliminary plat for the development of 48 condo units on 4 acres.
Lead Agency:
City of Meridian
Site address:
1187 Fairview
Staff
Approval:
July 20, 2006
Applicant:
Horizon Development
P.P. Box 191096
Boise, 1083719
Representative:
Briggs Engineering
1800 W. Overland
Boise, 1083705
Staff Contact:
Mindy Wallace
Phone: 387-6178
E-mail: mwallace@achd.ada.id.us
Tech Review:
July 14, 2006
Application Information:
Acreage: 4.11
Current Zoning: RUT
Proposed Zoning: R-15
Residential Units: 48-condo units
Common Lots: 2
A. Findinqs of Fact
Existing Conditions
1. Site Information: The site is currently consists of one dwelling unit.
2.
Descri tion of Ad'acent Surroundin Area:
Direction Land Use
North Settlers Villa e Subdivision
South Danbu Fair Subdivision No. 1
East Danbu Fair Subdivision NO.6
West Single-family Residential
Zoning
C-G
R-8
R-8
R-8
1
Touchstone Place
3. Existing Roadway Improvements and Right-of-Way Adjacent To and Near the Site
· Fairview Avenue is currently improved with 5 traffic lanes, and no curb gutter or sidewalk
abutting the site. There is 11 O-feet of right-of-way existing for Fairview Avenue (55-feet from
centerline).
· Sandlin Avenue"is currently improved with 2 traffic lanes, and curb, gutter and sidewalk abutting
the site. There is 50-feet of right-of-way existing for Sandlin Avenue (25-feet from centerline).
4.
Existing Access:
There is one defined access point to this property off of Fairview Avenue.
5.
Site History:
ACHD has not previously reviewed this site for a development application.
Development Impacts
6.
Trip Generation:
This development is estimated to generate 281 additional vehicle trips per
day based on the ITE Trip Generation Manual.
7.
Impact Fees:
There will be an impact fee that is assessed and due prior to issuance of any
building permits. The assessed impact fee will be based on the impact fee
ordinance that is in effect at that time.
8. Impacted Roadways:
Roadway Frontage Functional Traffic Count Level of Speed
Classification Service* Limit
Fairview 85' Principal 34,187 west of Better 35 MPH
Avenue Arterial Locust Grove on than "C"
5/26/06.
25,626 east of
Meridian Road on
12/8/05.
Sandlin 50' Local Roadway N/A Better 25 MPH
Avenue than
"CH
*Acceptable level of service for a five-lane principal arterial roadway is "0" (33,000 VTD).
9. Capital Improvements Plan/Five Year Work Program
Currently Fairview Avenue between Meridian Road and Locust Grove is identified in the Five Year
Work Plan as in preliminary development stage for improvements. These improvements would
include widening Fairview Avenue to 7-lanes and curb, gutter, and sidewalk. The intersection of
Fairview Avenue and Locust Grove is scheduled to improve to 7-lanes on both roadway section in
16-20 years as part of the Districts Capital Improvements Plan.
B. Findinas for Consideration
1. Fairview Avenue
Right-of-Way Policy: District policy requires 120-feet of rightpof-way for 7-lane arterial roadways
(Figure 72-F1 B). This right-of-way allows for the construction of a 7 -lane roadway with curb, gutter,
5-foot concrete detached sidewalks and bike lanes.
Sidewalk Policy: District policy requires 7-foot wide attached (or 5-foot detached) concrete
sidewalk on all collector roadways and arterial roadways (7204.7.2).
2
Touchstone Place
Applicant's Proposal: The applicant has proposed to construct curb, gutter, and 5-foot concrete
sidewalk abutting the site.
Staff Comment/Recommendation: Fairview Avenue is scheduled in the Five Year Work Plan to
be widened to 7 -lanes. Because of this 120-feet of right-of-way will need to be dedicated, 60-feet
from the center line of Fairview Avenue. A 5-foot detached concrete sidewalk will need to be
constructed 58-feet from the center line of the roadway in its ultimate location.
2. Internal Streets (South Jericho Way, Touchstone Way, Sandlin Avenue)
Right-of-Way Policy: District policy 7204.4.1 and Figure 72-F1A requires 50-feet of right-of-way
on local streets. This right-of-way allows for the construction of a 2-lane roadway with curb, gutter
and 5-foot wide concrete sidewalks.
Street Section Policy: District policy 7204.4.2 states, "developments with any buildable lot that is
less that 1-acre in size will typically provide streets having a minimum pavement width of 32-feet
with curb, gutter and sidewalks. The total street width shall be 36-feet from back-of-curb to back-of-
curb. Variations of this width may be allowed, depending on traffic volumes forecast to be
generated by the development. Concrete sidewalks shall be a minimum of 5-feet in width unless
they are separated from the curb 5-feet or more in which case the sidewalk shall be a minimum of
4-feet in width.
Applicant's Proposal: The applicant has proposed to construct all internal streets as a 36-foot
street section within 50-feet of right-of-way.
Staff Comment/Recommendation: The applicant's proposal meets district standards and should
be approved with this application.
3. Tree Planters
Tree Planter Policy: The District's Tree Planter Width Interim Policy prohibits all trees in planters
less than 6-feet in width. In addition to prohibiting trees in planters less than 6-feet in width, the
policy requires a minimum planter width of 6-feet for class II tress with the installation of root
barriers on both sides of the planter strip or a minimum planter width of 8-feet without the
installation of a root barrier. The policy also requires Class I and Class III trees to provide a
minimum planter width of 10-feet.
4, Stub Streets
Stub Street Policy: District policy 7203.5.1 states that the street design in a proposed development
shall cause no undue hardship to adjoining property. An adequate and convenient access to
adjoining property for use in future development may be required. If a street ends at the
development boundary, it shall meet the requirements of sub section 7205, "non-continuous
streets." District policy 7205.5 states that stub streets will be required to provide intra-neighborhood
circulation or to provide access to adjoining properties. Stub streets will conform with the
requirements described in Section 7204.5, 7204.6 and 7204.7, except a temporary cul-de-sac will
not be required if the stub street has a length no greater than 150-feet. A sign shall be installed at
the terminus of the stub street stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE."
Staff Comment/Recommendation: Although the applicant has not proposed any stub streets, they
are extending one stub street (Sandlin Avenue) from the south. Staff would recommend that the
right-of-way line be moved to the western property line for approximately 220-feet along the
proposed S. Jericho Way from Fairview Avenue to the northwest property line. Moving the right-of-
3
Touchstone Place
way line back to the adjacent property line will allow for future access to properties to the west and
promote future connectivity. Staff will not require a public stub street from the back half of the
property to the west. Our reason for not requiring a pubic stub street to the west is because that
property takes access to a private road. Staff would support a cross access agreement between
the two properties.
5, Roadway Offsets
Roadway Offset Policy: District policy 7204.11.6, requires local roadways to align or offset a
minimum of 300-feet from an arterial roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from
another local roadway (measured centerline to centerline).
Applicant Proposal: The applicant has proposed one roadway, Sandlin Avenue to align with
existing Sandlin Avenue to the south. South Jericho Way is proposed to intersect Fairview Avenue
and almost aligns with Jericho on the north side of Fairview Avenue.
Staff Comment/Recommendation: The applicant's proposal for Sandlin Avenue meet District
policy; however, staff would recommend a full alignment of South Jericho with Jericho north of
Fairview Avenue. The alignment is off by approximately 15-feet and it appears that there is enough
property to make the alignment work.
Driveways
Driveway Policy: District policy 72-F4 (1) and 72-F4 (2), requires driveways located on local
residential roadways to offset a controlled and/or uncontrolled intersection a minimum of 50-feet
(measured near edge to near edge).
Graveled driveways abutting public streets create maintenance problems due to gravel being
tracked onto the roadway. In accordance with District policy, 7207.9.1, the applicant should be
required to pave the driveway its full width and at least 30-feet into the site beyond the edge of
pavement of the roadway and install pavement tapers with 15-foot radii abutting the existing
roadway edge.
6, Other Access
Fairview Avenue is classified as a principal arterial roadway. Other than the access specifically
approved with this application, direct lot access is prohibited to these roadway and should be noted
on the final plat.
C. Site Specific Conditions of A(!proval
1. Dedicate 60 -feet of right-of-way from the centerline of Fairview Avenue abutting the parcel by
means of a warranty deed. The right-of-way purchase and sale agreement and deed must be
completed and signed by the applicant prior to scheduling the final plat for signature by the ACHD
Commission or prior to issuance of a building permit (or other required permits), whichever occurs
first. Allow up to 30 business days to process the right-of-way dedication after receipt of all
requested material. The owner will be paid the fair market value of the right-of-way dedicated which
is an addition to existing ACHD right-of-way. Construct a 5-foot detached concrete sidewalk a
minimum of 58-feet from the center line of Fairview Avenue abutting
2. Dedicate approximately 10-feet of right-of-way 220-feet along the west side of S. Jericho Way from
Fairview Avenue to the northwest property line.
4 Touchstone Place
3. Construct all internal streets as a 36-foot street section with curb, gutter, and 5-foot concrete
sidewalk within 50-feet of right-of-way.
4. Construct Sandlin Avenue to align with existing Sandlin Avenue to the south as proposed. Align
South Jericho with Jericho north of Fairview Avenue centerline to centerline.
5. Comply with all Standard Conditions of Approval.
D. Standard Conditions of AlWroval
1. Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. Private sewer or water systems are prohibited from being located within any ACHD roadway or
right-of-way.
3. All utility relocation costs associated with improving street frontages abutting the site shall be borne
by the developer.
4. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file
number) for details.
5. Comply with the District's Tree Planter Width Interim Policy.
6. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by
the District. Contact the District's Utility Coordinator at 387-6258 (with file numbers) for details.
7. All design and construction shall be in accordance with the Ada County Highway District Policy
Manual, ISPWC Standards and approved supplements, Construction Services procedures and all
applicable ACHD Ordinances unless specifically waived herein. An engineer registered in the State
of Idaho shall prepare and certify all improvement plans.
8. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or
other required permits), which incorporates any required design changes.
9. Construction, use and property development shall be in conformance with all applicable
requirements of the Ada County Highway District prior to District approval for occupancy.
10. Payment of applicable road impact fees are required prior to building construction in accordance
with Ordinance #200, also known as Ada County Highway District Road Impact Fee Ordinance.
11. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. The
applicant at no cost to ACHD shall repair existing utilities damaged by the applicant. The applicant
shall be required to call DIGLlNE (1-800-342-1585) at least two full business days prior to breaking
ground within ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in
the event any ACHD conduits (spare or filled) are compromised during any phase of construction.
12. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized
representative of the Ada County Highway District. The burden shall be upon the applicant to
obtain written confirmation of any change from the Ada County Highway District.
5 Touchstone Place
13. Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the Highway District of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at
the time the change in use is sought.
E. Conclusions of Law
1. The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval
are satisfied.
2. ACHD requirements are intended to assure that the proposed use/development will not place an
undue burden on the existing vehicular transportation system within the vicinity impacted by the
proposed development.
Attachments
1. Vicinity Map
2. Site Plan
3. Request for Reconsideration Guidelines OR Appeal Guidelines
4. Development Process Checklist
6
Touchstone Place
w
FAIRVIEW-
-=:=.-- - ',;'-'~- ""
7
Touchstone Place
" ,
, "
I, ......
;0.
1 .~
'-,,=
r-
~
:~:~.:~.~;.,~:'~:~
.~ .r=~-i'i~;
~ '~l
..~\ .,-~:jJ~
Ii::.
L \l~;
- ~ \ I'i
': Ij;
II
,':
.
i
~
r,
l-~;;::~~:~~JX'S-I~ ._-~-~~_._----
. ------~'.:r:s"ll::..::'.:-----~
-~- r I l I .~ ~ !
'" ~> ,.. I ~ ~...--=~'< ~'"*
~I I '"" I'~ "'\'\".~
~'l I ~'!' ']\1
'i :. h~_ r. !
I < ~ ~ ,_ .) PI
\,It I '" : I .... ll-~ ~ \ ~ ; I
:~l '/ ? I-~ (\-"1 ~J..~~
-- 'fll-1--Jli "it . 1
" I~f!:, ill I '^
I. ~/r'
: ':, }~;~~::"~"~?Ji=::/j /:/~.
, ,/~"----l- ..#111
I' t ''''~.~. -'-,Ill i'"~i
,i. it', ~ ~~_~_- - -~ ~
: : L,. .!": . O''i'~ I -h~~~ t "
~++-""b~.1~ i _______ j ~~. \t"~~~ ~
, [' \~I- "r & A ~ '{; .,.~-.
, . ~.~ I . g
~ii:1 ~~~l:~c:.
--:' I; ~ I. - i'
. Ii ';.1' , I, J ":;T Y .....' ". .
~ ' I: . ,r ~ -u: !IW6 !
:~Il , .;;~--;~z.::--:.~.",'L.
Ii:; ~ . I : ~ ! I~ ,......- 'f,. ";:::
i~!I; 'I~'-~~~ j__JTlt;r A ~~1 ,f
'" ....-. ~ !Jr,,'
:O:::I"l'l ~~ ,~,..... 'IT.. - ----.-.--- ;;~
I. :' ,: sQl ~ill' ,tl}i ''l: I~ r ~~,..,..,IIllI~ 8"
or' , ',.lI: . I:,. . L , 1- i ' I
, ': :z: ,1~," l'~ ~_.:.L:~____"~_j..",_~J_____.." '
'I I Ii' ~. ", ~------ :OC'C.,e -T _"""""""'" 3.....~
I' ! t : I ~ GR....~ "::.cC~=-
, 'i II' I " """~",,v
, I: t 1,1 c~------ ~.; t ~
! :II'! (~ ii;~
: II ! i ~ G'.
I ;:, I: ' _ ~: 6,
;"i'l ~,.j.- 'ld ~ 6~
I II '11:::' ~
I I'
:d i:
]
'.>
."
,.
~
'f ..... ... ....""1.
I
~
:f
,..
;;w:
",
,-
~'J
/...
~
_ "+::""':~l
.~ II-j
"" ,
~ J>.. \i.......:..t
~~:.-- \~
i; (
Ii I
"
~
, ,
L I It~
"
....
5!il
Ii
~i
~i
~i
~iI:
ifi
~
A'
..~~
en-t
'-0
.-tc
mo
O~
!mcn
1< -t
,mo
:r- Z
Om
"tJ
'!:: "tJ
'mr-
Iz>
-to
m
"tJ
'r
!>-
Iz
.4O~.2G{ F';
t=.-----------
: '1~L~
1.1. LL-LLJ..,
, i
, I
!:
L.;"'d'
- . .
r;, '. . '. ", '
~ ' . .'
... -
.'- .
~ ': . .
~ ..._ltl\l1<\.. ~loe
".
'h
, ,
~~I~
;;1(,0
Id "'1 !:
~ --z
J: -
1 II 'C::
i 1Jl'!:;
O!cn
.
"
~
b
"'
'.
"
'1
,
'"I
,.
\\
;~
\)
.
~
;li
'1'
~
> -, '.
i':is
""
*~ I
I I
-~"...) :
;.~: ! ;~
,~~ ~!, r.
"} "1':1 ;'.
M-)~ r
~g ,-
f:.r" ..
-,.
~l ~~
~-"
-.
j,
;<l
"'
.. 'r'
_...._-----~ ~+-----,,-~-~~.. --.--. --~._.._---_..
,.,no"'''. ~~. ..".
I...' "' .. "" .. -., - - - - - - -- ...
,
I.t~ .-----------
!iH,\ : ill II in,! ~ ~ n ~ II~i
hl~~~ ~. . -< ~ ~i.1 ~ ~ f ~ ~ ~l
'a~ ~, ol~ ~~~i6.:
!t: d' ~ ~L~ ..~ ~.~ , H :
I~Ji~ ~~ ~ ~~:H~H~"
-e ~ ~ . a 1ft". ~- . ~ -
i R ~ ~. . '. ~e e ~ ,
~ ~ . ~ ~ .If, ~ ! ~
i ~ ~ ; a~ f l ~'~ , i
> ;.". Ii ;: ~ 0 i ~ ~ .' ! I
'Jl~~ ~e ,i
.. ~ .) I I'
_____....... ...."..w_~___....L...:.
,
I WI<ST FNIlVEW AYE.
~ --~--~T-----"
r II
I
I
i
L.,"...,
HORIZON
DEVElOPIEM1S LLt
---
(~~)
CONDITIONAL USE APPLICATION
I' ~ ,~~~~L~i'J Tod~~~~~E,PLACE
rniIT$J@~ *'~'W}Jj~II~
."'I4I"C'f - "LAN~
101, ,1~ COOt(
". i,
II
Development Process Checklist
II
[8JSubmit a development application to a City or to the County
[8JThe City or the County will transmit the development application to ACHD
[8JThe ACHD Planning Review Division will receive the development application to review
[8JThe Planning Review Division will do one of the following:
DSend a "No Review" letter to the applicant stating that there are no site specific requirements at this time.
DSend a "Comply With" letter to the applicant stating that if the development is within a platted subdivision or part
of a previous development application and that the site specific requirements from the previous development also
apply to this development application.
[8JWrite a Staff Level report analyzing the impacts of the development on the transportation system and evaluating
the proposal for its conformance to District Policy.
DWrite a Commission Level report analyzing the impacts of the development on the transportation system and
evaluating the proposal for its conformance to District Policy.
[8JThe Planning Review Division will hold a Technical Review meeting for all Staff and Commission Level reports.
DFor ALL development applications, including those receiving a "No Review" or "Comply With" letter:
· The applicant should submit two (2) sets of engineered plans directly to ACHD for review by the Development
Review Division for plan review and assessment of impact fees. (Note: if there are no site improvements required
by ACHD, then architectural plans may be submitted for purposes of impact fee calculation.)
· The applicant is required to get a permit from Construction Services (ACHD) for ANY work in the right-of-way,
including, but not limited to, driveway approaches, street improvements and utility cuts.
DPay Impact Fees prior to issuance of building permit. Impact fees cannot be paid prior to plan review approval.
DID YOU REMEMBER:
Construction (Zone)
D Driveway or Property Approach(s)
· Submit a "Driveway Approach Request" form to Ada County Highway District (ACHD) Construction (for approval by
Development Services & Traffic Services). There is a one week turnaround for this approval.
o Working in the ACHD Right-of.Way
· Four business days prior to starting work have a bonded contractor submit a "Temporary Highway Use Permit Application"
to ACHD Construction - Permits along with:
a) Traffic Control Plan
b) An Erosion & Sediment Control Narrative & Plat, done by a Certified Plan Designer, if trench is >50' or you are
placing >600 sf of concrete or asphalt.
Construction (Subdivisions)
D Sediment & Erosion Submittal
· At least one week prior to setting up a Pre-Con an Erosion & Sediment Control Narrative & Plat, done by a Certified Plan
Designer, must be turned into ACHD Construction - Subdivision to be reviewed and approved by the ACHD Drainage
Division.
D Idaho Power Company
· Vic Steelman at Idaho Power must have his IPca approved set of subdivision utility plans prior to Pre-Con being
scheduled.
D Final Approval from Development Services
ACHD Construction - Subdivision must have received approval from Development Services prior to scheduling a Pre-Con.
9
Touchstone Place
.'.f. .
10
Request for Appeal of Staff Decision
1. Appeal of Staff Decision: The Commission shall hear and decide appeals by an applicant of
the final decision made by the ROWDS Manager when it is alleged that the ROWDS Manager did
not properly apply this section 7101.6, did not consider all of the relevant facts presented,
made an error of fact or law, abused discretion or acted arbitrarily and capriciously in the
interpretation or enforcement of the ACHD Policy Manual.
a. Filing Fee: The Commission may, from time to time, set reasonable fees to be
charged the applicant for the processing of appeals, to cover administrative costs.
b. Initiation: An appeal is initiated by the filing of a written notice of appeal with the
Secretary of Highway Systems, which must be filed within ten (10) working days
from the date of the decision that is the subject of the appeal. The notice of appeal
shall refer to the decision being appealed, identify the appellant by name, address
and telephone number and state the grounds for the appeal. The grounds shall
include a written summary of the provisions of the policy relevant to the appeal
and/or the facts and law relied upon and shall include a written argument in support
of the appeal. The Commission shall not consider a notice of appeal that does not
comply with the provisions of this subsection.
c. Time to Reply: The ROWDS Manager shall have ten (10) working days from the date
of the filing of the notice of appeal to reply to the notice of the appeal, and may
during such time meet with the appellant to discuss the matter, and may also
consider and/or modify the decision that is being appealed. A copy of the reply and
any modifications to the decision being appealed will be provided to the appellant
prior to the Commission hearing on the appeal.
d. Notice of Hearing: Unless otherwise agreed to by the appellant, the hearing of the
appeal will be noticed and scheduled on the Commission agenda at a regular meeting
to be held within thirty (30) days following the delivery to the appellant of the
ROWDS Manager's reply to the notice of appeal. A copy of the decision being
appealed, the notice of appeal and the reply shall be delivered to the Commission at
least one (1) week prior to the hearing.
e. Action by Commission: Following the hearing, the Commission shall either affirm or
reverse, in whole or part, or otherwise modify, amend or supplement the decision
being appealed, as such action is adequately supported by the law and evidence
presented at the hearing.
Touchstone Place