HomeMy WebLinkAboutChange Order 1 with A.M.E. Electric for 3 PRV Radio and Power Installation City of Meridian Public Works Dept. RECEIVED AUG 1 5 2006 City Of Meridian City Clerk Office Memo To: Will Berg; Tara Green From: Kyle Radek, P.E., Staff Engineer pc.- CC: File Date: August 14, 2006 Re: Proposed Agenda Item for August 22, 2005 City Council Meeting The Public Works Department respectfully requests the following item be placed on the February 7 City Council agenda, under Consent Agenda, for Council's consideration: Chanqe Order Number 1, Power and Radio Installation at 3 PRY Sites: This change order covers the installation of two radios to replace damaged radios, installation of a float switch, and providing one radio to the water department for use as a spare or for troubleshooting. The cost of the change order is $5,675. Recommended Council Action: The Public Works Department recommends that City Council approves Change Order Number 1 for Power and Radio Installation at 3 PRV Sites with AME Electric for a cost of $5,675, and authorzes the Mayor to sign it. This change order covers the installation of two radios to replace damaged radios, installation of a float switch, and providing one radio to the water department for use as a spare or for troubleshooting. Thank you for your consideration. Please contact me if you have any questions regarding any of these items. . Page 1 CHANGE ORDER NO.1 No.1 EFFECTIVE DATE DATE OF ISSUANCE OWNER City of Meridian CONTRACTOR: A.M.E. Electric. CONTRACT: PRV Radio and Power Installation Phase 1 Description: This change order consists of the following work: · Provide 3 radios and one float switch. Install one radio at Arrowwood and Ustick PRV. Install one radio and one float switch at 5th and Jamaica PRV. Deliver one radio to Meridian Water Department. CHANGE IN CONTRACT PRICE: Original Contract Price $ 5,675.00 Net Increase (Decrease) from previous Change Orders No. ....L to ....L $ 0.00 Contract Price prior to this Change Order: $ 25,817.61 Net increase~cBrBase~ of this Change Order: $ 5,675.00 Contract Price with all approved Change Orders: $ 31.492.61 RECOMMENDED ~- Kyfe Radek, PE Staff Engineer Date: -~f/6 6 APPROVED CHANGE IN CONTRACT TIMES: .~~ Original Contract Times: Substantial Completion: Ready for final payment: (days or dates) Net change from previous Change Orders No. _ to No. - Substantial Completion: Ready for final payment: (days) Contract Times prior to this Change Order: Substantial Completion: Ready for final payment: (days or dates) Net increase (decrease) this Change Order: Substantial Completion: Ready for final payment: (days) Contract Times with all approved Change Orders: Substantial Completion: Ready for final payment (days or gates) ATTEST Tammy de Weerd, Mayor Date: Approved by City Council: William G. Berg, Jr., City Clerk Date: EJCDC 1910-8-8 (1996 Edition) Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the Construction Specifications Institute.