HomeMy WebLinkAboutChange Order 1 with A.M.E. Electric for 3 PRV Radio and Power Installation
City of Meridian
Public Works Dept.
RECEIVED
AUG 1 5 2006
City Of Meridian
City Clerk Office
Memo
To: Will Berg; Tara Green
From: Kyle Radek, P.E., Staff Engineer pc.-
CC: File
Date: August 14, 2006
Re: Proposed Agenda Item for August 22, 2005 City Council Meeting
The Public Works Department respectfully requests the following item be placed on the
February 7 City Council agenda, under Consent Agenda, for Council's consideration:
Chanqe Order Number 1, Power and Radio Installation at 3 PRY Sites: This change order
covers the installation of two radios to replace damaged radios, installation of a float switch,
and providing one radio to the water department for use as a spare or for troubleshooting.
The cost of the change order is $5,675.
Recommended Council Action: The Public Works Department recommends
that City Council approves Change Order Number 1 for Power and Radio
Installation at 3 PRV Sites with AME Electric for a cost of $5,675, and authorzes
the Mayor to sign it. This change order covers the installation of two radios to
replace damaged radios, installation of a float switch, and providing one radio
to the water department for use as a spare or for troubleshooting.
Thank you for your consideration. Please contact me if you have any questions regarding
any of these items.
. Page 1
CHANGE ORDER NO.1
No.1
EFFECTIVE DATE
DATE OF ISSUANCE
OWNER City of Meridian
CONTRACTOR: A.M.E. Electric.
CONTRACT: PRV Radio and Power Installation Phase 1
Description: This change order consists of the following work:
· Provide 3 radios and one float switch. Install one radio at Arrowwood and Ustick PRV. Install one radio and one
float switch at 5th and Jamaica PRV. Deliver one radio to Meridian Water Department.
CHANGE IN CONTRACT PRICE:
Original Contract Price
$ 5,675.00
Net Increase (Decrease) from previous Change Orders
No. ....L to ....L
$ 0.00
Contract Price prior to this Change Order:
$ 25,817.61
Net increase~cBrBase~ of this Change Order:
$ 5,675.00
Contract Price with all approved Change Orders:
$ 31.492.61
RECOMMENDED
~-
Kyfe Radek, PE Staff Engineer
Date: -~f/6 6
APPROVED
CHANGE IN CONTRACT TIMES: .~~
Original Contract Times:
Substantial Completion:
Ready for final payment:
(days or dates)
Net change from previous Change Orders No. _ to
No. -
Substantial Completion:
Ready for final payment:
(days)
Contract Times prior to this Change Order:
Substantial Completion:
Ready for final payment:
(days or dates)
Net increase (decrease) this Change Order:
Substantial Completion:
Ready for final payment:
(days)
Contract Times with all approved Change Orders:
Substantial Completion:
Ready for final payment
(days or gates)
ATTEST
Tammy de Weerd, Mayor
Date:
Approved by City Council:
William G. Berg, Jr., City Clerk
Date:
EJCDC 1910-8-8 (1996 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America and the
Construction Specifications Institute.