Letter from Engineering Northwest
En1!ineerinl! North West, LLC
423 N. Ancestor Place. SUite 180 Boise. Idaho 83704
(208) 376-5000 . Fax (208) 376-5556
August 14, 2006
RECEIVED
AUG 1 5 2006
Mayor and City Council
City of Meridian
660 E. Watertower, Suite 200
Meridian, ID 83642
City Of Meridian
City Clerk Office
Re: File No. FP-06-037 Paramount Subdivision No. 13
I am writing on behalf of our client, Paramount Development, Inc. who has indicated to us their
acceptance of the conditions of approval as outlined by staff for the above referenced. Our
response to the City"s Site Specific Comments for this project is as follows:
Site Specific Requirements
1) All terms of the approved Preliminary Plat (PP-03-004), Conditional Use Permit
(CUP-03-008) and Development Agreement (Inst. No. 103137116) have been
met.
2) The Paramount Homeowner's Association will own and maintain the pressure
irrigation system within this development An irrigation well will be continued for
use as a secondary source as in previous phases.
3) This project has a private well as a year round source of water supply fOT the
pressure irrigation.
4) Agree.
5) Sewer and water mains will be constructed through this phase of development by
connecting to existing extensions from previous phases.
6) There are no domestic wells or septic systems located within this project.
7) Lot 14, Block 36 has been revised to include a 10-foot public utilities, drainage
and irrigation easement to accommodate the irrigation main to be installed along
the lot line.
8) The 20-foot setback requirement for DEQ Best Management Practices between
seepage bed and building foundation will be depicted on the plat for the following
lots:
a) Eastern boundary of Lots 20-22, Block 26
b) Northern boundary of Lots 16-19, Block 34
c) Northern boundary of Lots 1-5. 11 and 12, Block 36
9) Agree
10) Agree
11) Agree
12) Certificate of Owners has been completed.
13) Agree.
City of !\feridian - Ge.eral Reaairemeots
The developer agrees to all the general requirements contained in the staff report dated
August 10, 2006.
Should you have any questions or need anything else feel free to give me a call.
Thank you,
~;b:ti
Xc: Jay Walker, Brighton Development
2