HomeMy WebLinkAboutPZ - Narrative for Development Agreement Modification Narrative for Development Agreement Modification
Original proiect name, annexation/rezone file number and ordinance number
■ Original Project Name: AZ-H-2015-0019 South Meridian Annexation and Rezone
■ Annexation/Rezone File Number: H-2015-0019 DA Kent and Donna Mills
■ City of Meridian Ordinance Number: 16-1670
o Ada County Recording Instrument Number: 2016-007086
o Recordation date: 1/27/2016
City Council approval of Development Agreement, recordation date, and instrument number
■ City Council approval date: 1/5/2016
■ Ada County Recording Instrument Number: 2016-007090
■ Recordation date: 1/27/2016
Reason for Development Agreement modification
■ To remove property from an existing Development Agreement to execute a new agreement that
allows for church use (R-8 zone with Conditional Use Permit)
Proposed Development Agreement modifications
■ The church is requesting, at the guidance of the City of Meridian,to adopt our own
development agreement and therefore mark ups to the existing development agreement are
not required per an email from Sonya dated September 27, 2023.
Legal Description and Exhibit
■ See attached legal description and exhibit depicting area to be subject to DA Mod
Other supporting information
■ Request to defer Amity Road frontage improvements along Lot 1, Block 2 (pavement widening,
borrow ditch/drainage improvements, 10'-wide multi-use pathway, and associated overhead
and underground utility relocations). Note:ACHD will require a formal request for a waiver of
policy and written support from the City of Meridian to defer the road widening and sidewalk
until a future re-subdivision of Lot 1, Block 2.
o Lot 1, Block 2 is proposed to be re-subdivided in the future,with location(s) of public
roadway connection(s)to Amity Road still to be determined.
o Landscaping that would be required along the 10'-wide multi-use pathway would likely
not get the proper maintenance and attention it would need.
o Three existing utility poles and overhead utility lines along the Lot 1, Block 2 Amity Road
frontage would need to be relocated to behind the new 10'-wide pathway.
o An existing telephone riser would need to be relocated to behind the 10'-wide pathway.
o The existing Calkins Lateral ditch and box culvert would not allow for construction of the
10'-wide concrete pathway alignment. However,the curvature of the future pathway
with a future roundabout at Oak Briar Way would work and would not require an
extension of the box culvert. See attached roundabout exhibit.
o Financial hardship for Stonehill Church as this project will solely rely on charitable
contributions from its congregants.
■ Request to defer 10'-wide regional pathway (to be located adjacent to and east of Calkins
Lateral)
o Lot 1, Block 2 is proposed to be re-subdivided in the future,with location(s) of public
roadway crossing over Calkins Lateral still to be determined.
o Landscaping that would be required along the 10'-wide pathway would likely not get the
proper maintenance and attention it would need.
o Financial hardship for Stonehill Church as this project will solely rely on charitable
contributions from its congregants.
■ New Exhibit 1 "Future Conceptual Site Layout for Re-Subdivision of Stonehill Crossing
Subdivision Residential Lots"
o Future R-4 zone single-family detached residential lots are shown at 8,000 sq.ft.
minimum size.
o Collector road (Oak Briar Way) is shown to be extended to the south in the future (by
others)for better regional connectivity and takes Calkins Lateral into consideration.
o Street A is shown to align with proposed public road connection across Amity Road
within Windrow Subdivision preliminary plat(currently pending approval).
o Street C is shown terminating at a cul-de-sac with a 20'-wide paved driveway to Amity
Road for emergency vehicle access (due to length of street).
o Street G is shown to cross Calkins Lateral per request received from ACHD.
o Future collector road from Linder Road and to south is shown as generally indicated by
ACHD.
o Street K is shown to be extended to the east in the future (by others)for better regional
connectivity.
o Future 10'-wide regional pathway shown along the east side of the Calkins Lateral in
conformance with the City's Pathways Master Plan.
■ New Exhibit 2 "Future Conceptual Engineering Plan for Re-Subdivision of Stonehill Crossing
Subdivision Residential Lots"
o Linder Road/ Meridian Road Sewershed boundary depicted per 2015 mapping.
o Future northwest and central residential lots are shown to be served by Linder Road
Sewershed via Windrow Subdivision.
o Future southwest residential lots are shown to be served by Linder Road Sewershed via
a future sewer extension from Linder Road along future collector road (by others).
o Future southeast residential lots are shown to be served by a Meridian Road Sewershed
via two routes due to topography limitations.
o Existing irrigation water delivery from Calkins Lateral to offsite properties to the west is
shown to be maintained.