Loading...
HomeMy WebLinkAboutPZ - Narrative for Conditional Use Permit Narrative for Conditional Use Permit The church will be built in two (2) phases. The first phase will consist of an approximately+/-40,000 square foot building,with approximately 545 parking stalls, landscaping, bicycle parking, and other outdoor amenities that are undetermined at this time. The second phase will consist of an approximately+/-12,000 square foot addition onto the building and approximately 269 parking stalls. Phasing of site improvements ❑ The proposed building is shown with a future expansion. ❑ The parking lot improvements in the southwest portion of the site are shown to be included in a future phase—to be determined based on parking needs. Existing radio tower easements ❑ Two existing radio tower easements (recorded in 1945) may limit the placement of underground utilities located within the easements until the towers are removed (date undetermined). ❑ The language included in the easements is somewhat vague and possibly open to interpretation. ❑ The proposed placement of the church building lends well to the possible easement restrictions.