HomeMy WebLinkAbout2023-12-19 City Pathways (AWENDIAN�---
Parks and Recreation
Reviewer: Kim Warren/ Pathways Project Manager
Planner Assigned: Sonya Allen
Project Name: Stonehill Church, MDA, PP, RZ File No: H-2023-0041 Date: 7.31.2023
The following will be required for development of the proposed project:
CONDITIONS OF APPROVAL - PATHWAYS
1. The project developer shall design and construct multi-use pathways consistent with the location
and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways
Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be
coordinated through the Pathways Project Manager.
2. Prior to Final Approval,the applicant shall submit a public access easement for a 10'wide multi-
use pathway along the east side of the Calkins lateral for Council approval and subsequent
recordation. The easement shall be a minimum of 14' wide (10' pathway + 2' shoulder each
side). If permission can be obtained from the governing irrigation district,the pathway may be
located within the Calkins lateral easement. If not, the pathway shall be located in a separate
linear lot outside of the irrigation easement, behind the rear residential lot lines.
Use standard City template for public access easement. Submit all easement documents online
through Citizen's Access Portal.
3. Construct multi-use pathways per paving section based on existing site conditions as
recommended by project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final
approval the applicant's engineer shall provide written documentation that the pathway
segment was constructed per the recommended specifications.
4. The owner (or representative association) of the property affected by each public access
easement shall have an ongoing obligation to maintain the multi-use pathway.
5. 6' high open vision fencing shall be installed between pathways and (live)water irrigation canals
and laterals as detailed in the Meridian Pathways Master Plan, Chapter 3, page 3-5. All other
fence details per UDC 11-3A-7.
6. Project developer shall be responsible for obtaining license agreement and other permission(s)
as required for constructing within irrigation district easements.
7. Should any discrepancy exist between these conditions of approval and the requirements of the
irrigation district,the developer shall work with Pathways Project Manager to achieve a pathway
design that meets both City and irrigation district objectives. City requirements as stated shall
not(nor are they intended to)override those of the irrigation district having jurisdiction over the
project area.
Rev.02.11.22
Legend L�•.��
COO) MY Ilk
Trdnsporlation -
f
Railroad
+ — WAMilYR6
Pedestrian and Bike Network
Meridian Pathways(Adopted)
-- Ahemative Route
Existing Pathway Cdkins Lateral
--- Lang Term Rome
Mlcno Path
On Street Route
•••• Purposed Pathway
Meridian Sidewalk—d Muhi-o
Type
Crossing -
- Asphalt i {
— Concrete -
Su6stsndard
Road Centerline(All Types)
CIassifi—Ion
May
Driveway - -
Locel
Collector '(P
y 1
MinorAnenal uHu' exw000 �.'�flf
ESTATES -- I Ilyq�i�
Principal Arterial --Wei
Ramp �-
Interstate -----�`_- a_,4• •.1$
Above: Pathways Map Excerpt showing required multi-use pathway