Loading...
HomeMy WebLinkAboutWater Main Extension Agreementl3 M -71 REALTY W -.ST INC_ BELLOMY LANE E. of 36th MA T N FXI F1 "1N SI CV7 CONTRACT 5ubd:i.v:isions;,ract�3,Id�c�i.�.�;_i,_�<.. Pr_�7jects, Industrial Devtlo mexzLt:s or nrgani._c:-,,i s: ,rmzc:r_ci,,il Dist:rict:s This Agreement, made cud entered :into this day of� by and between Boise, Water Corporation, (he-teinafter referred to as "Corporation") and of Boise, Idaho (hereinafter re- ferred to as "Applicant"), mut,.ial1v agree as follows: 1. ApplicTtnt hereby appl:L,ss for a water main extension to be constructed in accordance with the C;r: rporat ion l,� standard specifications and is generally de- scribed as follows,. Install 675 linear feet of 8'-',:;A.C'.,p pi orz .F;ellomy. Lane east = of 36th Street 'to .supply domestic water for 9 residential building lots. Total estimated cost of these facilities is $3,816.00 and Boise Water Corporation to contribute $825.00 for the differential of pipe size 6" vs Bit, leaving $2,991.00 to be advanced by applicant. 2. Applicant will advance an amount of TWQ THOUSI�ND_ UTUR T3L11TII2Ln ..r. NINETY ONrj(:?_,99x,oU)�pS?L[�K�to cover the estimated cost of facilities generally descr.i.becl a-zi 1:,alagraph .l. above, flny difference between the actual cost and the amount; �\dvance(i :shall he show -n as a revision of the amount of advance and shall be payable witth:i.n h,;i,rty (Jay-, -,),F submission. 3. At: the t -i m,; the water :main extension isconnected to the Corporation's water system, the ownership of the pipeline shall belong to the Corporation and shall thereafter be ma.1-retained and r)pe:cateci by the Corporat:"on, 4.. The a.moctnt advanced, iaz paragraph 2 above, shall be subject to refund by the Corporation, in. ca,;he without: interest, to the Applicant as ;follows: (a) 'The- Cox.po-ration shall determine the -ani .rev.enue rece-ive...d -_from each customer, other than residential supplied by service pipes connected directly to the extension for whichthe cost was, advanced and the refund shall be 2296 of the revenue so r ec"ei ved . (b) For residentia.l.. customers connected directly to the extension for which the cost was advanced, the refund shall be 22% of the average revenue per residential customer of the entire system for the immediately preceeding 12 month period. (c) The total amount refunder? s, Lal l not exceed the total of the amount advanced. Refunds will be made in annual payments for a period not to exceed 20 years after the date of this contract. 5, This Contract is entered into pursuant to the requirement of and in accordance with the vax7_ou.s applicable provisions of the C.orporation Is main ex- tension rule in eff2ct, and on fi_lc.:, tkrit.h the Idaho Public Utilities Commission, a copy of which is a.vai..l.akalr c,n rcgL.C.est and is made a part hereof. All service rendered from the Corporation's water system shall, be in accordance with the rates, rules and regulations applicable to said service under approval and authority of the Idaho Public. Utilities Commission, ..;.,...�.__. �_­_._._..__-,:._...,T...,.._.------ - ----.­...-- -- ---- ---- ---. _. .._.--Bfl.ISS WATE-R Ct3rcP-C-)P,ATZ0N-- ATTEST : Ry Secretary WITNESS: B- -71 - REALTY WEST 'INC. BELLOMY LANE EAST c.']l, 36TH ST. President Boise Water Corporation App l.i can t