Loading...
HomeMy WebLinkAbout2023-11-16 Meridian Parks and Pathways (AWENDIAN�--- Parks and Recreation Reviewer: Kim Warren/ Pathways Project Manager Planner Assigned: Stacy Hersh Project Name: Avani Neighborhood File No: H-2023-0049 AZ, PP Date: 11.16.23 The following will be required for development of the proposed project: CONDITIONS OF APPROVAL - PATHWAYS 1. The project developer shall design and construct multi-use pathways consistent with the location and specifications set forth in the Meridian Pathways Master Plan Map and Master Pathways Plan Document Chapter 3). Any proposed adjustments to pathway alignment shall be coordinated through the Pathways Project Manager. 2. Prior to Final Approval,the applicant shall submit a public access easement for a detached multi- use pathway along the proposed collector road. Applicant shall also provide micropath openings within blocks to allow access to the multi-use pathway. If the pathway falls outside of the public ROW,submit easement documents for Council approval and subsequent recordation. The easement shall be a minimum of 14' wide (10' pathway+2' shoulder each side). No easements are required for micro paths. Use standard City template for public access easement. Submit all easement documents online through Citizen's Access Portal. 3. Construct multi-use pathways per paving section based on existing site conditions as recommended by project civil engineer in accord with UDC 11-3A-8 and 11-313-12. Prior to final approval the applicant's engineer shall provide written documentation that the pathway segment was constructed per the recommended specifications. 4. The owner (or representative association) of the property affected by each public access easement shall have an ongoing obligation to maintain the multi-use pathway. Rev.02.11.22