Loading...
HomeMy WebLinkAboutConstruction Statement4. . J0,,HNSONNDERKOFLER & RIGGS e°n�ufl�`n9 En9L12EE'L�. NAMPA, IDAHO, 83651 1022 TWELFTH AVENUE SOUTH Mr, Herold J. Cox, City Clerk City of Meridian Meridian, Idaho Dear Mr. Cox: TELEPHONE 466-2323 OR 888-4460 Subject: Fast Side Park Subdivision Improvement Bond SUMNER M. JOHNSON, P.E. R. W. UNDERKOFLER. P.E. WILLIAM W. BRIGGS. P.E. August 10, 1965 In accordance with instructions of the Meridian City Council, and at the request of Mr. Norman Fuller, I have prepared estimated costs for completing street construction for the portions of street adjacent to and through the East Side Park Subdivision in Meridian. The following cost items include an allowance of 30 per cent for contingencies, which would be required if it is necessary for the City of Meridian to exercise the bond requirements to have the work performed. Item No. 1. Pit run gravel to within 4 inches of finished grade, including watering and rolling, estimated project cost of $950.00. Item No. 2. Two --inch course of crushed gravel surface, 3/4 -inch max., including watering and rolling, estimated project cost of $1100.00. Item No. 3. Prime coat and 2 -inch plant mix asphaltic surfacing, estimated project cost of $5900.00. In regard to Mr. Fuller's request for a reduction of bond on paving for road mix versus plant mix, we have no fixed basis to make such a reduction. On two projects of ours where the contractor had an option of plant mix or road mix with seal coat, the contractor's choice was the plant mix. Therefore, any reduction in bond is questionable. In discussing this with Mayor Storey, it was agreed that 25 per cent would be more than fair. Therefore, the bond amounts for street construction are: OFFICE ALSO AT 621 % MAIN STREET, BOISE, IDAHO, 83702 --- TELEPHONE 344-0240 T_ '.! • _ I JOHNSON, UNDERKOFLER & BRIGGS - C'ons�%irz9 fnyinsazs 1022 TWELFTH AVENUE SOUTH — NAMPA, IDAHO, 83651 Mr. Herold J. Cox, City Clerk August 10, 1965 Page 2 1. Pit run gravel W----------------- $ 950.00 2. Crushed gravel surfacing -------- 1100.00 3. Plant mix paving ($5900 x 0.75) - 4425:00 Total Street Bond ------------ $6475:00 It has been reported to us by the sewer lift station contractor that the sewer lines in the subdivision have excessive infiltration. This needs bond consideration before accepting same. Furthermore, there may be other items in the subdivision that, based on.fieid inspection., may need to be bonded. Sincerely yours, %3'bHNS UNDE L Sumner M. Johnson./ P.E. SMJ:ab cc: Mr. Norman Fuller STATEMENT ee 4 IV �G CONCRETE DITCH LINING CONTRACTING ROUTE 2 NAMPA, IDAHO Dial Nampa 466-9082 After 5:00: 888-2228 October 8, 1;)65 . Fuller Subdivision Meridian, Idaho OUR TERMS ARE "NET CASH -- 30 DAYS." THIS BILL DRAWS INTEREST AT THE LEGAL RATE OF 8% IF NOT PAID WHEN DUE.