Loading...
HomeMy WebLinkAboutCC - Storm Drain Report RINGNECK PLACE SUBDIVISION STORM DRAINAGE REPORT N f D. NO October 2023 2447 S. Vista Ave. Boise, Idaho 83705 REV: Phone: (208) 344-1180 RiveRidge Fax: (208) 344-1182 ENGINEERING COMPANY THIS PAGE LEFT INTENTIONALLY BLANK PAGE V�, STORM DRAINAGE REPORT TABLE OF CONTENTS 1 INTRODUCTION .............................................................................................1 1.1 SUBDIVISION AND LOCATION...................................................................................1 1.2 PROJECT DESCRIPTION ...........................................................................................1 1.2.1 EXISTING CONDITIONS.....................................................................................1 1.2.2 GROUNDWATER................................................................................................1 1.2.3 PROPOSED PROJECT.......................................................................................1 1.2.4 EXISTING IRRIGATION ......................................................................................2 1.2.5 ENTITIES WITH JURISDICTION OVER DESIGN ...............................................2 2 PRE-DEVELOPMENT DRAINAGE CONDITIONS..........................................2 2.1 MAP OF PREDEVELOPMENT CONDITIONS..............................................................2 2.2 STREET DRAINAGE....................................................................................................2 2.3 SITE INTERIOR ...........................................................................................................2 3 POST-DEVELOPMENT DRAINAGE CONDITIONS .......................................2 3.1 MAP OF POST-DEVELOPMENT CONDITIONS..........................................................2 3.2 STREET DRAINAGE....................................................................................................2 3.3 ON-SITE DRAINAGE ...................................................................................................2 3.4 COMPARISON OF PRE- VS. POST-DEVELOPMENT DRAINAGE .............................3 4 CALCULATION ASSUMPTIONS....................................................................3 4.1 ACHD STORMWATER FACILITIES.............................................................................3 Appendix A.............................................................................................Glossary of Terms A-1 Appendix B .....................................................Predevelopment Catchment Area Map B-1 Appendix C .................................................Post Development Catchment Area Map C-1 Appendix D ................................................................................Stormwater Calculations D-1 INTRODUCTION i I P a g e STORM DRAINAGE REPORT THIS PAGE LEFT INTENTIONALLY BLANK PAGE INTRODUCTION ii I P a g e STORM DRAINAGE REPORT 1 INTRODUCTION 1.1 SUBDIVISION AND LOCATION Subdivision: Ringneck Place Subdivision Location: Parcels S1105212448 and S1 1 0521 2449 lying within Government Lot 3, Section 5, T.3N., R.1 E., B.M. Main Crossroads: E. Ustick Rd. and N. Verado Ave. County, City, State ADA County, Meridian, Idaho Homeowners Association: Ringneck Place Subdivision Homeowners Association. 1.2 PROJECT DESCRIPTION 1.2.1 EXISTING CONDITIONS The overall Project Property is 1.538 acres located at 2315 W. Ustick Rd. east of the intersection of W. Ustick Rd. and N. Verado Ave. in Boise, Idaho. The property is currently zoned R-1 (Estate Residential). The site is currently an existing residence with outbuilding. Residential or bare land exists on the western, southern, and eastern property boundaries. The northern property boundary is W. Ustick Rd. An irrigation ditch crosses the southern portion of the property. The current topography consists of relatively flat and level terrain across the site with steeper slopes along the northern frontage of W. Ustick Rd. Throughout most of the site, surface materials consist of native silty gravel with sand fill materials underlain by silty sand sediments with weak to moderate calcium carbonate cementation encountered throughout this horizon. Poorly graded gravel with sand was encountered at depth. Vegetation on the site consists primarily of native weeds and grasses. 1.2.2 GROUNDWATER The Geotech report completed in June 2022 by Atlas Technical Consultants (Atlas), showed no groundwater encountered on site to a maximum depth of 15.3 feet below ground surface. Additionally, based on other projects in the area Atlas anticipates groundwater at depths greater than 15 feet below ground surface. 1.2.3 PROPOSED PROJECT The project will consist of five residential structures (four duplex and one single structures) on nine residential lots and two common lots. The development will be served by the existing and new ACHD roads. The lots will have underground utilities, municipal water, stormwater best management practices (BMP's), and municipal sewer service. INTRODUCTION 1 1 P a g e STORM DRAINAGE REPORT 1.2.4 EXISTING IRRIGATION There is an existing gravity irrigation line and associated structures crossing the southern portion of the property. The existing facilities will be piped north along Block 3, Lot 1 to a point on the common lot line between Block 2, Lots 3 and 4, continuing along said common lot line to the western boundary, and then south along the western boundary of Block 2, Lot 4 to the discharge point of the existing irrigation ditch. A wet well and pump station located in Block 3, Lot 1 at the turn to the west. 1.2.5 ENTITIES WITH JURISDICTION OVER DESIGN Entities that have jurisdiction over the design of stormwater and BMPs for this site will be ACHD and the City of Boise. 2 PRE-DEVELOPMENT DRAINAGE CONDITIONS 2.1 MAP OF PREDEVELOPMENT CONDITIONS See Appendix B Predevelopment Catchment Area Map for further information on the contents in this section. 2.2 STREET DRAINAGE Drainage from W. Ustick Rd. is maintained in the existing curb, gutter, drop inlets, and does not enter the site. 2.3 SITE INTERIOR Interior site drainage is achieved by percolation through surficial soils. 3 POST-DEVELOPMENT DRAINAGE CONDITIONS 3.1 MAP OF POST-DEVELOPMENT CONDITIONS See Appendix C Post Development Catchment Area Map for further information on the contents in this section. 3.2 STREET DRAINAGE Runoff from W. Ustick Rd. will remain unchanged. Runoff from the interior roadways will be collected and conveyed by curb, gutter, curb inlet, and a stormwater system to the seepage bed along N. Lapis Ave. 3.3 ON-SITE DRAINAGE Portions of the residential runoff will be conveyed through sheet flow, curb, gutter, curb inlets, and a stormwater system to the seepage bed located along N. Lapis Ave. Most of the site runoff from the predevelopment areas will be directed into this system. Additional residential runoff will be retained within their lot and percolated through surficial soils. PRE-DEVELOPMENT DRAINAGE CONDITIONS 2 1 P a g e STORM DRAINAGE REPORT 3.4 OFF-SITE DRAINAGE Portions of the runoff will be conveyed through sheet flow, curb, gutter, curb inlets, and a stormwater system to the existing ACHD stormwater facilities located along E. Ustick Rd. This runoff will consist of only those portions of the property between E. Ustick Rd. and the proposed retaining wall along the south side of Block 1, Lot 1. 3.5 COMPARISON OF PRE- VS. POST-DEVELOPMENT DRAINAGE The portions of runoff that contribute to off-site drainage along W. Ustick Rd. will continue to be conveyed via the existing stormwater facilities along W. Ustick Rd. The runoff from other on-site sources will be maintained on-site. The off-site runoff from other sources is anticipated to be negligible and are not anticipated to require additional measures beyond those already proposed. 4 CALCULATION ASSUMPTIONS 4.1 ACHD STORMWATER FACILITIES Calculations for stormwater basins are included in Appendix D Stormwater Calculations. These calculations use the Rational Method for peak discharge and expected volumes. The following assumptions have been made: Rational Method: • Q = Total Runoff Volume in cfs • C = Runoff Coefficient • 1 = Storm Intensity o For pipe sizing: Qpeak (100-year Tc=10 minutes) I = 2.18-2.58 in/hr o For Seepage bed sizing: Qstorage (100-year 60-minute storm) 1=0.96 in/hr. 25% has been added for ACHD facilities. CALCULATION ASSUMPTIONS 3 1 P a g e STORM DRAINAGE REPORT Appendix A Glossary of Terms Glossary of Terms A-1 I P a g e STORM DRAINAGE REPORT THIS PAGE LEFT INTENTIONALLY BLANK PAGE Glossary of Terms A-2 1 P a g e STORM DRAINAGE REPORT AASHTO: American Association of Hotspot: A land use that generates State Highway and Transportation highly contaminated runoff with Officials Aquifer: A porous water concentrations higher than those bearing geologic formation that typical to stormwater. yields water for consumption. Hydrological Soil Group: The soils ACHD: Ada County Highway classification system developed by District the U.S. Soil Conservation Service (now the Natural Resource ASTM: American Society for Conservation Service) that Testing and Materials Best categorizes soils into four groups, A Management Practice through D, based on runoff potential. A soils have high BMP: (Best Management Practice) permeability and low runoff whereas A practice, or combination of D soils have low permeability and practices, that is determined to be high runoff. an effective and practicable (including technological, economic, Impervious cover: Surfaces that and institutional considerations) do not allow rainfall to infiltrate into means of preventing or reducing the the soil. Examples include amount of pollution generated by pavements, roofs, sidewalks, nonpoint sources to a level driveways, etc. compatible with water quality goals. It can be a structural or non- Infiltration rate: The rate at which structural device designed to stormwater moves through soil infiltrate, temporarily store, or treat measured in inches per hour or stormwater runoff in order to reduce meters per second. pollution and flooding. ICPI: Interlocking Concrete Detention pond or structure: The Pavement Institute temporary storage of stormwater runoff in an area with the objective IDEA: Idaho Department of of decreasing peak discharge rates Environmental Quality and providing a settling basin for pollutants. Observation well: A perforated pipe inserted vertically into an Erosion: The process of wearing opengraded base used to monitor away of soil by water, wind, ice, and its infiltration rate. gravity. 2. Detachment and movement of soil particles by same. One year storm: A rainfall event that occurs once a year or has a Exfiltration\Exfiltrate: The 100% chance of occurring in a given downward movement of water year. through an open: graded, crushed stone base into the soil beneath. One hundred year storm: A very unusual rainfall event that occurs A-31 Page STORM DRAINAGE REPORT once every 100 years or has a 1% chance of occurring in a given year. Porous pavement: A surface full of pores capable of supporting Open-graded base: Generally a pedestrians and vehicles, e.g. crushed stone aggregate material porous asphalt, porous concrete used as a pavement base that has (cast: inplace or precast units). no fine particles in it. The void spaces between aggregate can Pretreatment: BMPs that provide store water and allow it to freely storage and filtering pollutants drain from the base. before they enter another BMP for additional filtering, settling, and/or Outlet: The point at which water is processing of stormwater pollutants. discharged from an open: graded base through pipes into a stream, Retention pond: A body of water lake, river, or storm sewer. that collects runoff and stays full permanently. Runoff flowing into the Peak discharge rate: The pond that exceeds its capacity is maximum instantaneous flow from a released into a storm sewer, detention or retention pond, open: stream, lake, or river. graded base, pavement surface, storm sewer, stream or river usually Sediment: Soils transported and related to a specific storm event. deposited by water, wind, ice, or gravity. Permeability: The rate of water movement through a soil column under saturated conditions, usually Time of concentration: The time expressed as k in calculations per required for water to flow from the specific ASTM or AASHTO tests, most remote point of a watershed or and typically expressed in inches catchment to an outlet. per hour or meters per second. Void Ratio: Volume of voids around Permeable pavement: A surface the aggregate divided by the volume with penetrations capable of of solids. passing and spreading water capable of supporting pedestrians and vehicles, e.g. permeable interlocking concrete pavement. Pervious or permeable surfaces/cover: Surfaces that allow the infiltration of rainfall such as vegetated areas. Porosity: Volume of voids in a base divided by the total volume of a base. A-4 Page �✓ STORM DRAINAGE REPORT Appendix B Predevelopment Catchment Area Map Predevelopment Catchment Area Map B-1 I P a g e STORM DRAINAGE REPORT THIS PAGE LEFT INTENTIONALLY BLANK PAGE Predevelopment Catchment Area Map B-2 1 P a g e I I I \ I I I I I � I I �I ON-SITE v� / AREA: 1.54 ACRES CW: 0.23 ` a x ' o W � / I I I I I III v\ I � I ININ W X • � I II�II� / � I � � �� I I I \ I I // I / W / LEGEND PRELIMINARY PLAT BOUNDARY PROPOSED LOT LINE A''� 15"SD O PROPOSED STORM DRAIN MAIN, SIZE, MANHOLE AND CATCH BASIN PRE DEVELOPMENT DRAINAGE AREA MAP 2780 PROPOSED 5' CONTOUR 0 15 30 60 90 DATE: 2779 PROPOSED 1' CONTOUR AUGUST 2023 JOB: 2447 S.Vista Ave. 2780 EXISTING 5' CONTOUR 22040 "45V Boise,Idaho 83705 2779 - EXISTING 1' CONTOUR SCALE: 1" - 30' E-FILE: 22040 DRAINAGE MAP RiveRidge (208)344-1180 DRAWN BY: www.rvrdg.com MJBJ ENGINEERING COMPANY �✓ STORM DRAINAGE REPORT Appendix C Post Development Catchment Area Map Post Development Catchment Area Map C-1 I P a g e STORM DRAINAGE REPORT THIS PAGE LEFT INTENTIONALLY BLANK PAGE Post Development Catchment Area Map C-2 1 P a g e I I I �6 A PROPOSED CATCH MANHOLE ACHD STORMWATER SEEPAGE BED 1 1I II (BASINS A, PROPOSED CATCH BASINS A R S CW: .69 8 ACRES II u7 o BLOCK 3 I R U) 12 BASIN A(INLET 1.2) — AREA:0.21 ACRES CW:0.68 S� — N.LAPIS AVE. o 8" — ' r 4,2 7s I / rr / r/ r // / r/ // rr r/ r ,� i r/ // / BASIN B(IN 1.3) / / LET / BASIN D BASIN C(INLET 1.4) AREA: 0.49 ACRES AREA: 0.20 ACRES AREA: 0.28 ACRES / / r / / r / / / CW:0.64 1 CW:0.64 CW:0.80 / / / // rr Y7s I / r /y /r r/ rr // r rr // rr / r r/ //r rr ai Z � 1 2 I W // I/ r 3 F 4, S AREA: 0.27 ACRES 5 CW: 0.53 � 7 \I \ Co I BASIN F / (0 AREA: 0.09 ACRES CW: 0.20 II , 01 \ / LEGEND PRELIMINARY PLAT BOUNDARY PROPOSED LOT LINE ' 15"SD PROPOSED STORM DRAIN MAIN, SIZE, MANHOLE AND CATCH BASIN PROPOSED 5' CONTOUR 0 15 30 60 90 DATE: PROPOSED 1' CONTOUR AUGUST 2023 2447 S.Vista Ave. 2780 EXISTING 5' CONTOUR SOB. Boise, daho 83705 SCALE: 1" = 30' 22040 � � 2779 EXISTING 1' CONTOUR E—FILE: 22040 DRAINAGE MAP RiveRidge (2WW),ry 4- c80 DRAWN BY: MJB ENGINEERING COMPANY -\✓ STORM DRAINAGE REPORT Appendix D Stormwater Calculations Stormwater Calculations D-1 I P a g e STORM DRAINAGE REPORT THIS PAGE LEFT INTENTIONALLY BLANK PAGE Stormwater Calculations D-2 I P a g e 22040- RINGNECK SUBDIVISION REVISIONS: REV: DATE DESCRIPTION PreConstruction Drainage Calculations August 2023 *Designed per ACHD Standards **Designed per City of Meridian Standards Average Rainfall Intensity/Peak Discharge TOTAL ASPHALT/ LAWN/ DRAINAGE AREA AREA CONCRETE ROOF GRAVEL LANDSCAPE Cw Tc 125* Q25* 1100 Q100 (C=0.95) (C=0.95) (C=0.5) (C=0.2) (AC) (AC) (AC) (AC) (AC) (Min.) (IN/Hr) (CFS) (IN/Hr) (CFS) Pre-Construction 1.54 0.02 0.03 0.02 1.49 0.23 10 1.85 0.65 3.11 1.10 PAGE 1 OF 1 22040-RINGNECK SUBDIVISION REVISIONS: REV: I DATE DESCRIPTION Post Construction Drainage Calculations October 2023 *Designed per ACHD Standards **Designed per City of Meridian Standards Average Rainfall Intensity/Peak Discharge TOTAL ASPHALT/ ROOF LAWN/ DRAINAGEAREA AREA CONCRETE **** LANDSCAPE Cw Tc 125* 0,25* 1100* Q100* (C=0.95) (C=0.95) (C=0.2) (AC) (AC) (AC) (AC) (Min.) (IN/Hr) (CFS) (IN/Hr) (CFS) Seepage Bed 1* 0.98 0.46 0.18 0.34 0.69 10 1.85 1.25 2.58 1.75 Basin A(On-Site)* 0.21 0.13 0.00 0.08 0.68 10 1.85 0.26 2.58 0.37 Basin B(On-Site)* 0.49 0.20 0.09 0.20 0.64 10 1.85 0.57 2.58 0.80 Basin C(On-Site)* 0.28 0.13 0.09 0.06 0.80 10 1.85 0.42 2.58 0.58 Basin D(On-Site)** 1 0.20 0.02 0.09 1 0.08 1 0.64 1 10 1 1.85 1 0.23 2.58 0.33 Basin E(On-Site)** 0.27 0.02 0.10 0.15 0.53 10 1.85 0.26 2.58 0.36 Basin F(Off-Site)** 0.09 1 0.00 0.00 0.09 0.20 10 1.85 0.03 2.58 0.05 2.52 1 Hour Runoff Volume 25 YR 100 YR DRAINAGEAREA Tc 125* Q25* VOLUME I100* Q100* VOLUME (Min.) (IN/Hr) (CFS) (CF) (IN/Hr) (CFS) (CF) Seepage Bed 1* 60 0.69 0.47 1685 0.96 0.65 2344 Basin A(On-Site)* 60 0.69 0.10 353 0.96 0.14 491 Basin B(On-Site)* 60 0.69 1 0.21 1769 0.96 1 0.30 1070 Basin C(On-Site)* 60 0.69 0.16 563 0.96 1 0.22 783 Basin D(On-Site)** 60 0.69 0.09 313 0.96 0.12 436 Basin E(On-Site)** 60 0.69 0.10 351 0.96 0.14 489 Basin F(Off-Site)** 60 0.69 0.01 46 0.96 0.02 64 Seepage Bed MINIMUM STORAGE PIPE CROSS INFILTRATION 100YR 25% VOLUME BED BED BED #OF PIPE SECTIONAL VOLUME PIPE ROCK VOLUME DESIGN DRAINAGEAREA VOLUME VOLUME REQUIRED VOID RATIO INFILTRATION RATE DEPTH WIDTH LENGTH PIPES PIPE SIZE LENGTH AREA PER HR VOLUME VOLUME PROVIDED CHECK (CF) (IN\HR) (LF) (LF) (LF) (FT) (LF) (SF) (CF) (CF) (CF) (CF) Seepage Bed 1* 2344 586 2930 0.40 8.00 6.0 12.0 80.0 1 1.50 80 1.77 640 141 2163 2944 OK TIME TO DRAIN INFILTRATION RATE= 8.00 (IN\HR) MAX **** Roof Areas based on surveyed values or proposed designs. VOLUME 90%OF DRAINAGE DRAINAGE DESIGN DRAINAGE AREA TO DRAIN VOL TIME TIME CHECK (CF) (CF) (HRS) (HRS) (HRS) Seepage Bed 1* 2930 2637 48.00 4.12 OK PAGE 1 OF 1 Njo(lt' 2447 S. Vista Ave. Boise, Idaho 83705 RiveRid a Phone: (208) 344-1180 g Fax: (208) 344-1182 ENGINEERING COMPANY