Loading...
HomeMy WebLinkAboutPrivate Street Cross Section Revised 2.5"THICKNESS OF ASPHALT PLANT MIX PAVEMENT Z"SUPERPAVE SP-3 MIX DESIGN WIPG-58.28 O O O O 4"THICKNESS OF%"MINUS CRUSHED AGGREGATE BASE COMPACTED TO95%MAX DRY DENSITY PER ASTM D1557 O O OHO �O O OHO <�14"THICKNESS OF 6"MINUS UNCRUSHED AGGREGATE BASE COMPACTED TO 95%MAX DRY DENSITY PER ASTM D1557 GRANULAR STRUCTURAL FILL AS REQUIRED BY SITE CONDITIONS 6"MINUS UNCRUSHED AGGREGATE BASE \ \\\ COMPACTED TO 95%MAX DRY DENSITY PER ASTM D1557 SUBGRADE SHALL BE PREPARED AND PROOF COMPACTED PER THE SITE PREPARATION SECTION OF THE GEOTECHNICAL REPORT AND BE APPROVED BY OWNER'S GEOTECHNICAL REPRESENTATIVE PRIOR TO PLACEMENT OF OF ANY SUBBASE AGGREGATE OR GRANULAR STRUCTURAL FILL ASPHALT PAVEMENT SECTION 26.00'MIN.-(VARIES SEE PLAN) 13.00'MIN.-(VARIES SEE PLAN) 13.00'MIN.-(VARIES SEE PLAN) TOP OF CURB SLOPES 1.00' 10.00, 4.00' 6.00' 5.00' DOWNWARD AT 1.5% VARIES VARIES TOWARDS STREET 1.0%MIN 1.0%MIN. 1.5% 6"THICK CONCRETE ~- PAVEMENT PER ACHD 12"WIDE CONCRETE RIBBON 7. CONCRETE SUPPLEMENTAL CURB-(SEE 41GD.4) > �. r �ti '% ' 'P� r. - DRAWING SD-709 � ASPHALT PAVEMENT PER 31GDA ASPHALT PAVEMENT PER 31G . VALLEY GUTTER PER ACHD SUPPLEMENTAL DRAWING SD-708 (SEE 31RD.6) 26.00'MIN.•(VARIES SEE PLAN) 13.00'MIN.-(VARIES SEE PLAN) 13.00'MIN.-(VARIES SEE PLAN) 5.00' 6.00' 4.00' 6.00' 5.00' VARIES VARIES 6"THICK CONCRETE 1.5% 1.0%MIN 1.0%MIN. 1.5% 6"THICK CONCRETE PAVEMENT PER ACHD PAVEMENT PER ACHD SUPPLEMENTAL SUPPLEMENTAL DRAWING SD-709 '�r DRAWING SD-709 ASPHALT PAVEMENT PER 31GDA ASPHALT PAVEMENT PER 31GD.4 CONCRETE VALLEY GUTTER PER ACHD SUPPLEMENTAL DRAWING SD-708 (SEE 31RD.6) PRIVATE STREET TYPICAL SECTIONS NOTES 1. ALL ASPHALT PAVEMENTS AND BASE MATERIALS,AND SUB-GRADE PREPARATIONS SHALL BE PROVIDED IN ACCORDANCE WITH THE ISPWC AND THE PROJECT GEOTECHNICAL REPORT. 2. AGGREGATE BASE MATERIALS(314"MINUS CRUSHED AGGREGATE&6"MINUS UNCRUSHED AGGREGATE)MATERIALS SHALL COMPLY WITH DIVISION 800 OF THE ISPWC. 3. ALL SUBGRADES,STRUCTURAL FILL,AND BASE MATERIAL PREPARATIONS SHALL BE APPROVED BY OWNER'S GEOTECHNICAL REPRESENTATIVE PRIOR TO COVERING UP THE WORK OR PLACING SUBSEQUENT LIFTS. 4. ASPHALT PAVEMENT SHALL BE COMPACTED IN ACCORDANCE WITH THE ISPWC AND THE PROJECT GEOTECHNICAL REPORT. DENSITY TESTING SHALL BE PERFORMED RANDOMLY ACROSS THE SITE AT A FREQUENCY TO BE DETERMINED BY THE OWNER'S GEOTECHNICAL REPRESENTATIVE. PRIVATE STREET SECTIONS 3 GD.4