HomeMy WebLinkAboutACHD Comments Castlebrook
",,~""?""-
'- AC~
Ada County Highway District
David E. Wynkoop, President
Dave Bivens, 1 st Vice President
Judy Peavey-Derr, 2nd Vice President
Susan S. Eastlake, Commissioner
Sherry R. Huber, Commissioner
318 East 37th Street
Garden City JD 83714-6499
Phone (208) 387-6100
FAX (208) 387-6391
E-mail: tellus@ACHD.ada.id.us
September 30, 2002
To:
Crestline Development LLC
416 East 1 st Street
Meridian, Idaho 83642
RECEIVED
OCT - 2 2002
Subject:
Castlebrook Subdivision / MPP-02-016
120-lot residential subdivision
Black Cat Road
City of Meridi!lD.
City Clerk OffIce
On September 18, 2002, the Ada County Highway District acted on your application for the above
referenced project. The attached report lists site specific requirements, conditions of approval and
street improvements, which are required.
If you have any questions, please feel free to contact staff at 387-6177.
~"~
Andrea N. Tuning
Principal Developmen alyst
Right-of-way & Development Services
Planning Division
<...
CC: Planning & Development Chron/project file
City of Meridian
Construction Services
Drainage
Utilities
Land Consultants
.;;.;.. 7t',
- AC!!}2. Ada County Highway District
Right-of-Way & Development Department
Planning Review Division
This application requires Commission action because of the size of the development. This item is scheduled
to be on the consent agenda on September 25, 2002. Tech Review for this item was held with the applicant
on September 13, 2002. Please refer to the attachment for request for reconsideration guidelines. Staff
contact: Andrea N. Tuning, 208-387-6177, atuning@achd.ada.id.us
File Numbers: Castlebrook Subdivision / MPP02-016/ MAZ02-020
Site address: 950 North Black Cat Road
Owner/Applicant: Crestline Development, LLC
Kevin Amar
416 East 1't Street
Meridian, Idaho 83642
Representative: Land Consultants
Shawn Nickel
52 North 2nd Street
Eagle, Idaho 83686
Application Information
The applicant is seeking rezone and preliminary plat approval for a 120-lot residential subdivision on 39.96-
acres. The site is located on the east side of Black Cat Road at the half-mile between Cherry Lane and
Franklin Road.
Acreage:
Current Zoning:
Proposed Zoning:
Proposed buildable lots:
Proposed common lots:
39.96
RUT
R-4
120-single-faily residential lots
11-common lots
Vicinity Map
C.....I>:n".S"bdiYI.~"
121>lol..old"Ullloul><l"kb"
;> 1<;6~)(~~'~IJIF1E
I
I
I
I
1
Findings of Fact
1. Trip Generation: This development is estimated to generate 1,129 additional vehicle trips per day
(10 existing) based on the submitted traffic impact study. "'Note, the submitted traffic impact study
was based upon the assumption that Castle brook Subdivision would be a 118-lot residential
subdivision. The preliminary plat application that was submitted to the District is requesting approval
of 120-lots. It may be appropriate to assume that 1,149 vehicle trips per day will be generated by this
development.
2. Impact Fees:
The impact fee rate from the fee tables for this use is as follows:
The impact fee for a residence below 1 ,500-square feet is $1,055.00 per unit.
The impact fee for a residence above 1 ,500-square feet is $1,294.00 per unit.
These rates are based on the impact fee ordinance in effect at this time.
3. Traffic Impact Study: A traffic impact study was required with this application. The traffic impact
study was completed by Washington Group International for the applicant and the following is a
summary of the findings:
The following sections are taken from the Traffic Impact Studies:
Executive Summary:
The proposed development is projected to generate an average daily traffic (ADT) of 1 ,129 vehicles
per day (vpd), of which the peak hour traffic (PHT) is 119 vehicles per hour (vph).
Traffic generated by the site is expected to increase the road network volumes as follows: traffic on
Black Cat Road north and south of Franklin Road may increase by 600 and 294 vpd respectively;
traffic on Black Cat Road north and south of Cherry Lane may increase by 306 and 565 vpd
respectively; traffic on Franklin Road west and east of Black Cat Road may increase by 110 and 160
vpd respectively; traffic on Cherry Lane west and east of Black Cat Road may increase by 38 and
220 vpd respectively;
Black Cat Road has adequate existing capacity to handle the traffic in the forecast year with the
projected site traffic and operate at an acceptable LOS. Cherry Lane has adequate capacity on the
east and west sides of Black Cat Road to handle the traffic in the forecast year with the projected site
traffic and operate at an acceptable LOS. Franklin Road does not have adequate capacity on the
east and west sides on Black Cat to handle the background traffic projected for the year 2007.
Expansion of Franklin Road will be needed in the future by ACHD.
The intersection of Black Cat Road and Franklin Road is an all-way stop-controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 14 seconds. If the current control
is used in the forecast year 2007, the intersection will operate at LOS F with an average delay of 59
seconds based on the project background traffic volumes. Left-turn bays at all four corners of this
intersection are required to accommodate the projected background traffic demand.
The intersection of Black Cat Road and Cherry Lane is an all-way stop-controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 10 seconds. If the current control
is used in the forecast year 2007, the intersection will operate at LOS C with an average delay of 17
2
seconds without the traffic generated by Castiebrook. At build-out of the Castlebrook site, the
intersection is projected to operate at a LOS C with a delay of 18 seconds. No improvements are
necessary .
The north, south and EI Gato site access intersections on Black Cat Road will operate at acceptable
conditions at Castlebrook build-out. No improvements are necessary.
All of the internal streets have daily traffic projections lower than 1,000 vpd. The preliminary site
layout meets ACHD's access requirements. No improvements are necessary.
Proposed Development:
Castlebrook is a proposed 118-unit residential subdivision on an approximately 40-acre site located
on the east side of Black Cat Road between Franklin Road and Cherry Lane in Meridian, Idaho. At
build-out of the site, the project is projected to contain 118 single-family dwelling units. The study
assumes that the development will be completely built by the year 2007. As shown in the preliminary
site plan, the development proposes three full-accesses onto Black Cat Road. For the purpose of
this report these accesses are referred to as North Access, South Access, and EI Gato respectively.
The site plan stubs streets to the north and east properties. EI Gato Road exists west of Black Cat
Road. EI Gato will serve as a four-legged intersection with Black Cat Road. Heartland Homes has
proposed to extend EI Gato east from Black Cat Rd. to the southeastern corner of the Castlebrook
subdivision.
Study Period:
The build out year for this study was assumed as 2007. Only the weekday p.m. peak hour period
between 4-6 PM was analyzed for site impacts.
Trip Generation:
The proposed development is projected to generate an average daily traffic (ADT) of 1,129 vehicles
per day (vpd), of which the peak hour traffic (PHT) is 119 vehicles per hour (vph).
Traffic generated from the project site was distributed 50% north and 50% south along Black Cat
Road. This split is based on observation and the surrounding land uses. Turning movement
percentages at the intersections were assumed to remain constant and site traffic was distributed
based on these percentages.
Total Traffic:
Background (no-build) traffic for the year 2007 was obtained by factoring the existing traffic and
adding traffic from other vicinity developments. The existing traffic is projected at annual growth
factors unique to each roadway in the vicinity. These growth factors were determined from the
COMPASS Transportation Model. Traffic volumes projections for the year 2010 for the major streets
in the surrounding area were compared to traffic volumes from the 2000 Transportation model and
compounding rates were found to represent the annual growth of traffic in the area. The COMPASS
growth rates are as follows:
3
Black Cat Road
Cherry Lane West
Cherry Lane East
Franklin West
Franklin East
1700
3700
3000
6400
8100
3500
10100
9300
14500
15400
7.49 %
10.56 %
11.98 %
8.52 %
6.64 %
Roadway Capacity:
Capacity analysis was performed using the latest edition of the Highway Capacity Software (HCS
4.1b) based on 2000 edition of the Highway Capacity Manual.
Capacity analysis for the 2002 existing, 2007 no-build, and 2007 build-out scenarios was performed.
The existing intersection traffic control was retained for arterial intersections. All site accesses will be
controlled by stop signs. The results are as follows:
Black Cat Rd.l AWSC
Franklin Rd.
Black Cat Rd./ Cherry AWSC
Lane
Black Cat Rd.l North TWSC
Access
N. Access Left Turn
Black Cat Left Turn
Black Cat Rd.l South TWSC
Access
S. Access Left Turn
Black Cat Left Turn
Black Cat Rd.l EI Gato TWSC
S. Access Left Turn
Black Cat Left Turn
. - Add left-turn lanes on all approaches.
F
B
F
C'
B
C
c
N/A
N/A
N/A
N/A
A
B
N/A
N/A
N/A
N/A
A
B
N/A
N/A
N/A
N/A
A
B
The intersection of Black Cat Road and Franklin Road is an all-way stop controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 14 seconds. If the current control
is used in the forecast year 2007, the intersection will operate a LOS F with an average delay of 59
seconds without the traffic generated by Castlebrook. The background traffic volumes alone justify
intersection improvements by 207. At build-out of the Casllebrook site, the intersection is projected to
operate a LOS F with a delay of 76 seconds. At the forecast background traffic volumes, the Black
Cat Road /Franklin Road will operate at an unacceptable LOS. In order to improve Black Cat Road
and Franklin Road several different improvement options were considered. Of the improvement
options analyzed, the addition of left-turn lanes on all approaches with an all way stop control is
recommended. With the improvement the intersection will operate at LOS C at 2007 build-out, with
an average delay of 18 seconds per vehicle.
4
The Intersection of Black Cat Road and Cherry Lane is an all-way stop controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 10 seconds. If the current control
is used in the forecast year 2007, the intersection will operate a LOS C with an average delay of 17
seconds without the traffic generated by Castle brook. At build-out of the Castlebrook site, the
intersection is projected to operate at a LOS C with a delay of 18 seconds. The projected build-out
traffic volumes do not require any improvements.
The site north access intersection will be a 2-way stop-controlled intersection. The left-turn
movement from site access is projected to operate at a LOS A with a delay of 7 seconds at build-out
year. The left-turn movement from Black Cat Rd. into the development operates at LOS B with 12
seconds of delay. A left-turn bay is warranted on Black Cat Rd. due to high opposing volumes. A
right-turn bay is not warranted on Black Cat Rd. for entrance to the development.
The site south access intersection will be a 2-way stop-controlled intersection. Westbound ieft-turn
movement is projected to operate at a LOS A with a delay of 7 seconds at build-out year. The left-
turn movement from Black Cat Rd. into the development operates at LOS B with 11 seconds of delay.
A left-turn bay is warranted on Black Cat Rd. based on ACHD's left-turn deceleration-lane warrant
guidelines. A right-turn bay is not warranted on Black Cat Rd. for entrance to the development.
The EI Gato site access intersection will be a 2-way stop-controlled intersection. The left-turn
movement from EI Gato is projected to operate at an LOS of B with a delay of 11 seconds at build-out
year. A left-turn bay on Black Cat Rd. for entrance to the development may be warranted. However,
since the left-turning volumes into the subdivision are minor, a left-turn bay is not warranted into EI
Gato Road. A right-turn bay is not warranted on Black Cat Rd. for entrance to the development.
Existing and Future Traffic Projections on Vicinity Roadways:
Black Cat NI Cherry Lane 5,262 306 5,568 14,000 Minor Arterial
Black Cat NI Project 4,160 565 4,725 14,000 Minor Arterial
Black Cat S/ Project 4,160 565 4,725 14,000 Minor Arterial
Black Cat S/ Franklin 3,767 294 4,061 14,000 Minor Arterial
Cherry Lane W/ Black Cat 9,741 38 9,779 14,000 Minor Arterial
Cherry Lane EI Black Cat 13,080 220 13,300 37,000 Principal Arterial
Franklin W/ Black Cat 9,097 110 9,207 14,000 Minor Arterial
Franklin E/ Black Cat 9,569 160 9,729 14,000 Minor Arterial
, . Numbers adjusted to reflect appropriate thresholds
Site Access and Circulation:
Black Cat Road requires left-turn lanes for traffic tuming into the site at both the North and South
approaclhes. Right-turn Janes are not required for any of the approaches. A left-turn lane is not
recommended for traffic turning into the site at the EI Gato approach. All site access locations meet
ACHD's policy requirements. Traffic volumes on the North, South and EI Gato approaches do not
exceed 1000 vpd. All of the internal streets have daily traffic projections lower than 1000 vpd. The
preliminary site design on these streets meets ACHD's access policy.
5
The following are the principal recommendations of the study:
Based on the left turning movements and opposing traffic volumes, a left-turn bay is warranted on
Black Cat Road at the north site access. A right-turn bay is not warranted on Black Cat Road for
entrance to the development.
Based on the left turning movements and opposing traffic volumes, a left-turn bay is warranted on
Black Cat Road at the south site access. A right-turn bay is not warranted on Black Cat Road for
entrance to the development.
Franklin Road does not have the capacity to handle the background traffic in 2007. Widening
Franklin Road, by ACHD, will allow the collector to operate at an acceptable LOS. Any widening of
Franklin Rd. will be able to accommodate the projected build-out traffic, which is under 1 % of the total
projected 2007 traffic volumes.
The intersection of Black Cat/Franklin is over capacity under the background traffic conditions. The
construction by ACHD of left-turn bays at all approaches is necessary to improve the intersection
operation to an acceptable LOS. Improvements to the intersection to accommodate the projected
background traffic will also handle the additional site traffic. This intersection also meets the rural
peak hour signal warrant in the design year.
The intersection of Black Cat/Cherry Lane operates at an acceptable LOS in the design year. No
changes are required at the intersection if Black Cat Road and Cherry Lane Road.
The site EI Gato's access intersection will be a 2 way stop-controlled intersection. The left turn
movement from the site access is projected to operate at an LOS of B with a delay of 11 seconds at
the build out year. As per ACHD's left-turn deceleration-lane guidelines, a left-turn bay on Black Cat
Road for entrance to development falls into the "may be warranted" category. However, since the left
tuming volumes are so minor into EI Gato Lane, it is our recommendation to not construct a left-turn
bay. A right turn-bay is not warranted on Black Cat Road for entrance to the development.
4. Site Information: The site has one existing single-family dwelling.
5. Description of Adjacent Surrounding Area:
North: Coral Creek Subdivision
South: Large single-family residential lots (5-acres +)
East: Large 38.9-acre agricultural parcel
West: Large single-family residential lots (1-acre +)
6. Impacted Roadways
Black Cat Road
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
1,320-feet
Minor arterial
North of Franklin Road was 2,686 on 4-24-02.
Better than "C"
35 MPH
6
Cherry Lane
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
Franklin Road
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
None
Principal arterial
East of Black Cat Road was 6,634 on 7-31-01.
West of Black Cat Road was 4,823 on 7-6-00.
Better than "C"
35 MPH
None
Minor arterial
East of Black Cat Road was 7,097 on 4-24-02
West of Black Cat Road was 5,934 on 4-24-02.
Better than "C"
45 MPH
7. Roadway Improvements Adjacent To and Near the Site
Black Cat Road is improved with 24-feet of pavement (2-traffic lanes) with no curb, gutter or sidewalk.
Cherry Lane is improved with 5-traffic lanes with curb, gutter and sidewalk.
Franklin Road is improved with 24-feet of pavement (2-traffic lanes) with no curb, gutter or sidewalk.
8. Existing Right-of-Way
The Black Cat Road right-of-way varies in width. Abutting the northern portion of the site, there is 50-
feet of right-of-way (25-feet from centerline). Abutting the southern portion of the site, there is 55-feet
of right-of-way (25-feet from centerline).
Cherry Lane currently has 85-feet of right-of-way (40-feet from centerline).
Franklin Road currently has 55-feet of right-of-way (30-feet from centerline).
9. Site History
The District has not previously reviewed an application for this site.
10. Five Year Work Program
The District does not have any roadway improvements within this area that are scheduled within the
Five Year Work Program.
Findings for Consideration
1. Right-of-Way
District pOlicy requires 96-feet of right-oF-way on arterial roadways (Figure 72-F1 B). This right-of-way
allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks
and bike lanes.
2. Sidewalk
District policy requires 5-foot wide (minimum) concrete sidewalk on all arterial and collector streets
(7204.6.5).
7
The applicant should construct 5-foot concrete sidewalk on Black Cat Road abutting the parcel. The
sidewalk should be constructed 2-feet within the right-of-way. If the sidewalk meanders outside of the
right-of-way, the applicant should provide an easement.
3. Roadway Offsets
District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from
another local roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum of 150-feet from a
. residential collector roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum of 300-feet from an
arterial roadway (measured centerline to centerline).
The applicant is proposing three roadways that are proposed to intersect Black Cat Road.
. The first entrance, Gillette Street, is proposed to intersect Black Cat Road approximately
265-feet (measured center line to center line) south of West Big Creek Street. This
location does not meet District policy. The applicant should construct Gillette Street a
minimum of 300-feet (measured centerline to centerline) south of West Big Creek Street.
. The second entrance, Hearst Drive, is proposed to intersect Black Cat Road
approximately 530-feet north of the south property line. This location meets District policy
and should be approved with this application.
. The third entrance, West EI Gato Road is proposed to intersect Black Cat Road at the
half-mile. This roadway will also align with the roadway that exists on the west side of
Black Cat Road. This roadway location meets District policy and should be approved with
this application.
The internal roadways appear to meet District policy and should be approved with this application.
4. Roadway Street Sections
District policy 7204.4.2 states, "developments with any buildable lot that is less that 1.5-acres in size
will typically provide streets having a minimum pavement width of 32-feet with curb, gutter and
sidewalks. The total street width shall be 36-feet from back-of-curb to back-of-curb. Variations of this
width may be allowed, depending on traffic volumes forecast to be generated by the development.
Concrete sidewalks shall be a minimum of 5-feet in width unless they are separated from the curb 5-
feet or more in which case the sidewalk shall be a minimum of 4-feet in width.
District policy 7204.4.1 requires right-of-way widths for all streets and highways shall not be less than
fifty feet wide except in unusual circumstances. A right-of-way less than 40-feet will not be permitted.
District policy 7203.4.1 states that if a proposed development abuts an unpaved street or streets, the
developer shall construct improvements, including curb, gutter and concrete sidewalk, plus an
additional 12-feet of paved surface beyond the centerline established for the street. The developer
shall dedicate additional right-of-way, if required. Concrete sidewalks shall be a minimum of 5-feet in
width unless they are separated from the curb by 5-feet or more in which case the sidewalk shall be a
minimum of 4-feet in width.
8
According to MSHTO guidelines and District policy 7203.3, if the proposed development is not
served by a paved public street, the developer shall provide a 24-foot wide (minimum) paved street
from the proposed development to the public street specified by the District. Wider street widths may
be required depending on the magnitude of the development and other factors, including the potential
for bicycle, bus and pedestrian traffic.
The applicant is proposing to construct EI Gato Street to intersect Black Cat Road at the half-mile.
This roadway is not identified as a collector roadway on the 2020 Functional Street Classification
System Map but is identified as a mid-mile collector within the JUB Collector Study. The JUB
collector study has not yet been finalized or adopted
Due to the fact that the EI Gato Street is not identified as a future collector on the 2020 Functional
Street Classification System Map, the Commission has not adopted the findings of the JUB Collector
study, and the conclusions from the submitted traffic impact study state that the traffic volumes on EI
Gato Street are consistent with a residential collector staff is not recommending that EI Gato Street be
constructed as a collector roadway. Staff recommends that EI Gato Street be constructed as a
residential collector with a 36-foot street section with vertical curb, gutter and 5-foot sidewalk within
50-feet of right-of-way. Due to the fact that this roadway will be classified as a residential collector,
front on housing should be restricted on this roadway. ACHD is not requiring the construction of this
roadway. If the applicant chooses to construct the roadway or is required to construct this roadway
under another agency's jurisdiction, the roadway should be constructed to ACHD standards.
The applicant is proposing to construct EI Gato Street at the south property line (at the mid mile).
Due to the fact that the applicant is proposing to construct EI Gato Street on the south property line,
the applicant should construct EI Gato Street as one half of a 36-foot street section with vertical curb,
gutter and 5-foot concrete sidewalk, plus 12-feet of additional pavement. The applicant should also
restrict direct access to EI Gato Street. This restriction should be noted on the final plat.
5. Stub Streets
District policy 7203.5.1 and 7205.5 requires stub streets to provide intra-neighborhood circulation and
to provide access to adjoining parcels. District policy also requires temporary turnarounds with a
temporary easement provided to the District at the end of stub streets that serve more than one lot, or
are greater than 150-feet in length with a sign at the terminus of the roadway stating that, "THIS
ROAD WILL BE EXTENDED IN THE FUTURE".
The applicant is proposing to extend Goltview Way at the north property line. Golfview Way was
approved with the Coral Creek Subdivision. Staff is supportive of the extension of this stub street.
The applicant is proposing to construct a stub street, Bolt Street, to the east property line
approximately 560-feet north of the south property line. Staff is supportive of this stub street location.
Due to the fact that Bolt Street is one lot in depth, the applicant is not required to provide a temporary
turnaround at the terminus of the roadway. The applicant should install a sign at the terminus of the
roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
West EI Gato Road is proposed to extend from Black Cat Road to the east property line as a stub
street. Biltmore Avenue intersects West EI Gato Road approximately 1 OO-feet west of the east
property line. Due to the fact that Biltmore Avenue functions asa temporary turn around, the
applicant will not be required to construct a temporary turnaround at the terminus of the roadway.
9
6. Turnarounds
District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius of
45-feet. The applicant should also be required to provide a minimum of a 29-foot street section on
either side of any proposed center islands within the turnarounds. The medians should be
constructed a minimum of 4-feet wide to total a minimum of a 1 OO-square foot area. Dedicate 54-feet
of right-of-way plus the additional width of the median.
T-type turnarounds will be allowed at the ends of local streets where the site configuration or other
demonstrated constraints exist to prevent the use of a typical circular turnaround. The minimum
measurements of the T-type turnaround shall be sufficient to provide a minimum curb radius of 18-
feet at any change of direction of the curb line.
The applicant is proposing to construct a T-type turnaround (a hammerhead turnaround) at the
terminus of Glamorgan Place. Staff has determined that there is a site configuration or other
demonstrated constraint (the Kennedy Lateral) that prevent the use of a standard cul-de-sac
tumaround. The applicant should construct an acceptable turnaround at the terminus of Glamorgan
Place. The turnaround should meet the approval of the Districts Plan Review staff and the
jurisdictional Fire District.
7. Turn Lanes
According to the submilled traffic impact study the left turn bay warrants are met at the Black Cat
Road and Gillette Street intersection as well as the Black Cat Road and Hearst Drive intersection.
The applicant should construct a left turn bay on Black Cat Road at the Gillette Street intersection.
The applicant should coordinate the design of the left turn bay with the District's Traffic Services Staff.
The Traffic Services Department can be reached at 387-6140.
The applicant should construct a left turn bay on Black Cat Road at the Hearst Drive intersection.
The applicant should coordinate the design of the left turn bay with the District's Traffic Services Staff.
The Traffic Services Department can be reached at 387-6140.
Site Specific Conditions of Approval
1. Dedicate 48-feet of right-of-way from the centerline of Black Cat Road abutting the parcel by means of a
warranty deed. The right-of-way purchase and sale agreement and deed must be completed and signed
by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to
issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business
days to process the right-of-way dedication after receipt of all requested material. The owner will be paid
the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if
the owner submits a letter of application to the impact fee administrator prior to breaking ground, in
accordance with the ACHD Ordinance in effect at that time (currently Ordinance #195).
2. Construct 5-foot (minimum) concrete sidewalk on Black Cat Road abutting the site. Locate the sidewalk
2-feet within the new right-of-way. If the sidewalk meanders outside of the right-of-way, provide an
easement for the sidewalk.
3. Construct Gillette Street a minimum of 300-feet (measured centerline to centerline) south of West Big
Creek Street.
4. Construct Hearst Drive to intersect Black Cat Road approximately 530-feet north of the south property
line, as proposed.
10
5. Construct West EI Gato Road to intersect Black Cat Road at the half-mile, as proposed.
6. Construct all local roadways to align or offset a minimum of 125-feet from another local roadway
(measured centerline to centerline).
7. Construct all of the internal roadways as 36-foot street sections with curb, gutter and 5-foot concrete
sidewalk within 50-feet of right-of-way, as proposed.
8. Construct EI Gato Street as one half of a 36-foot street section with vertical curb, gutter and 5-foot
concrete sidewalk, plus 12-feet of additional pavement within 42-feet of right-of-way. The applicant
should also restrict direct access to EI Gato Street. This restriction should be noted on the final plat.
9. Extend Golfview Way at the north property line, as proposed.
10. Construct a stub street, Bolt Street, to the east property line approximately 560-feet north of the south
property line and install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE
EXTENDED IN THE FUTURE".
11. Construct an acceptable turnaround at the terminus of Glamorgan Place. Coordinate the design of the
turnaround with District staff and submit a letter showing that the jurisdictional Fire District has reviewed
and approved the alternative tumaround.
12. Comply with all Standard Conditions of Approval.
D. Standard Conditions of Approval
1. Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by
the developer.
3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file number)
for details.
4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the
District. Contact Construction Services at 387-6280 (with file numbers) for details.
5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual,
ISPWC Standards and approved supplements, Construction Services procedures and all applicable
ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall
prepare and certify all improvement plans.
6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other
required permits), which incorporates any required design changes.
7. Construction, use and property development shall be in conformance with all applicable requirements of
the Ada County Highway District prior to District approval for occupancy.
8. Payment of applicable road impact fees are required prior to building construction in accordance with
Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance.
11
9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities
damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be
required to call DIGLlNE (1-800-342-1585) at least two full business days prior to breaking ground within
ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any
ACHD conduits (spare or filled) are compromised during any phase of construction.
10. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized representative of
the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation
of any change from the Ada County Highway District.
11. Any change by the applicant in the planned use of the property which is the sUbject of this application,
shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and
legal restrictions in force at the time the applicant or its successors in interest advises the Highway
District of its intent to change the planned use of the subject property unless a waiver/variance of said
requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is
sought.
E. Conclusions of Law
The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are
satisfied.
ACHD requirements are intended to assure that the proposed use/development will not place an undue
burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the
proposed development.
Attachments
Vicinity Map
Site Plan
Appeal Guidelines
12
Request for Reconsideration of Commission Action:
A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the
Commission may request reconsideration of that action, provided the request is not for a reconsideration of
an action previously requested to be reconsidered, an action whose provisions have been partly and
materially carried out, or an action that has created a contractual relationship with third parties.
Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion
may be seconded by any Commissioner and is voted on by all Commissioners present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time.
The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m.
on the day prior to the Commission's next scheduled regular meeting following the meeting at which the
action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be
placed on the agenda for that next scheduled regular Commission meeting.
The request for reconsideration must be supported by written documentation setting forth new facts and
information not presented at the earlier meeting, or a changed situation that has developed since the taking
of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may
also be supported by oral testimony at the meeting.
If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the
moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The
Commission may set the date of the meeting at which the matter is to be returned. The Commission shall
only take action on the original matter at a meeting where the agenda notice so provides.
At the meeting where the original matter is again on the agenda for Commission action, interested persons
and ACHD staff may present such written and oral testimony as the President of the Commission determines
to be appropriate, and the Commission may take any action the majority of the Commission deems
advisable.
If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative
costs, as established by the Commission.
13
.
.
!::--
......~ .......
.~.; '~',
A~ljR. Ada County Highway District
Right-of Way & Development Department
Planning Review Division
This application requires Commission action because of the size of the development. This item is scheduled
to be on the consent agenda on September 25, 2002. Tech Review for this item was held with the applicant
on September 13, 2002. Please refer to the attachment for request for reconsideration guidelines. Staff
contact: Andrea N. Tuning, 208-387-6177, atuning@achd.ada.id.us
File Numbers:
Castlebrook Subdivision / MPP02-016/ MAZ02-020
RECEIVED
OCT - 4 2002
Site address: 950 North Black Cat Road
. City of Meridian
City Clerk Office
m:
w
5:::.
[?
lS
Owner/Applicant: Crestline Development, LLC
Kevin Amar
416 East 1" Street
Meridian, Idaho 83642
Representative: Land Consultants
Shawn Nickel
52 North 2nd Street
Eagle, Idaho 83686
Application Information
The applicant is seeking rezone and preliminary plat approval for a 120-lot residential subdivision on 39.96-
acres. The site is located on the east side of Black Cat Road at the half-mile between Cherry Lane and
Franklin Road.
Acreage:
Current Zoning:
Proposed Zoning:
Proposed buildable lots:
Proposed common lots:
39.96
RUT
R-4
120-single-faily residential lots
11-common lots
Vicinity Map
,.,....;':"~,;:;), t>
"'..........Su"'..;...n
llo-.....b."IoI....."'lIion
"_"..... ~..'~~~_R.~~<:_\._=?
1
Findings of Fact
1. Trip Generation: This development is estimated to generate 1,129 additional vehicle trips per day
(10 existing) based on the submitted traffic impact study. "'Note, the submitted traffic impact study
was based upon the assumption that Castle brook Subdivision would be a 118-iot residential
subdivision. The preliminary plat application that was submitted to the District is requesting approval
of 120-lots. It may be appropriate to assume that 1,149 vehicle trips per day will be generated by this
development.
2. Impact Fees:
The impact fee rate from the fee tables for this use is as follows:
The impact fee for a residence below 1 ,500-square feet is $1,055.00 per unit.
The impact fee for a residence above 1 ,500-square feet is $1,294.00 per unit.
These rates are based on the impact fee ordinance in effect at this time.
3. Traffic Impact Study: A traffic impact study was required with this application. The traffic impact
study was completed by Washington Group International for the applicant and the following is a
summary of the findings:
The following sections are taken from the Traffic Impact Studies:
Executive Summary:
The proposed development is projected to generate an average daily traffic (ADT) of 1,129 vehicles
per day (vpd), of which the peak hour traffic (PHT) is 119 vehicles per hour (vph).
Traffic generated by the site is expected to increase the road network volumes as follows: traffic on
Black Cat Road north and south of Franklin Road may increase by 600 and 294 vpd respectively;
traffic on Black Cat Road north and south of Cherry Lane may increase by 306 and 565 vpd
respectively; traffic on Franklin Road west and east of Black Cat Road may increase by 110 and 160
vpd respectively; traffic on Cherry Lane west and east of Black Cat Road may increase by 38 and
220 vpd respectively;
Black Cat Road has adequate existing capacity to handle the traffic in the forecast year with the
projected site traffic and operate at an acceptable LOS. Cherry Lane has adequate capacity on the
east and west sides of Black Cat Road to handle the traffic in the forecast year with the projected site
traffic and operate at an acceptable LOS. Franklin Road does not have adequate capacity on the
east and west sides on Black Cat to handle the background traffic projected for the year 2007.
Expansion of Franklin Road will be needed in the future by ACHD.
The intersection of Black Cat Road and Franklin Road is an all-way stop-controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 14 seconds. If the current control
is used in the forecast year 2007, the intersection will operate at LOS F with an average delay of 59
seconds based on the project background traffic volumes. Left-turn bays at all four corners of this
intersection are required to accommodate the projected background traffic demand.
The intersection of Black Cat Road and Cherry Lane is an all-way stop-controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 10 seconds. If the current control
is used in the forecast year 2007, the intersection will operate at LOS C with an average delay of 17
2
seconds without the traffic generated by Castiebrook. At build-out of the Castle brook site, the
intersection is projected to operate at a LOS C with a delay of 18 seconds. No improvements are
necessary.
The north, south and EI Gato site access intersections on Black Cat Road will operate at acceptable
conditions at Castiebrook build-out. No improvements are necessary.
All of the internal streets have daily traffic projections lower than 1,000 vpd. The preliminary site
layout meets ACHD's access requirements. No improvements are necessary.
Proposed Development:
Castiebrook is a proposed 118-unit residential subdivision on an approximately 40-acre site located
on the east side of Black Cat Road between Franklin Road and Cherry Lane in Meridian, Idaho. At
build-out of the site, the project is projected to contain 118 single-family dwelling units. The study
assumes that the development will be completely built by the year 2007. As shown in the preliminary
site plan, the development proposes three full-accesses onto Black Cat Road. For the purpose of
this report these accesses are referred to as North Access, South Access, and EI Gato respectively.
The site plan stubs streets to the north and east properties. EI Gato Road exists west of Black Cat
Road. EI Gato will serve as a four-legged intersection with Black Cat Road. Heartland Homes has
proposed to extend EI Gato east from Black Cat Rd. to the southeastern corner of the Castle brook
subdivision.
Study Period:
The build out year for this study was assumed as 2007. Only the weekday p.m. peak hour period
between 4-6 PM was analyzed for site impacts.
Trip Generation:
The proposed development is projected to generate an average daily traffic (ADT) of 1,129 vehicles
per day (vpd), of which the peak hour traffic (PHT) is 119 vehicles per hour (vph).
Traffic generated from the project site was distributed 50% north and 50% south along Black Cat
Road. This split is based on observation and the surrounding land uses. Turning movement
percentages at the intersections were assumed to remain constant and site traffic was distributed
based on these percentages.
Total Traffic:
Background (no-build) traffic for the year 2007 was obtained by factoring the existing traffic and
adding traffic from other vicinity developments. The existing traffic is projected at annual growth
factors unique to each roadway in the vicinity. These growth factors were determined from the
COMPASS Transportation Model. Traffic volumes projections for the year 2010 for the major streets
in the surrounding area were compared to traffic volumes from the 2000 Transportation model and
compounding rates were found to represent the annual growth of traffic in the area. The COMPASS
growth rates are as follows:
3
Black Cat Road
Cherry Lane West
Cherry Lane East
Franklin West
Franklin East
1700
3700
3000
6400
8100
3500
10100
9300
14500
15400
7.49 %
10.56 %
11.98 %
8.52%
6.64%
Roadway Capacity:
Capacity analysis was performed using the latest edition of the Highway Capacity Software (HCS
4.1 b) based on 2000 edition of the Highway Capacity Manual.
Capacity analysis for the 2002 existing, 2007 no-build, and 2007 build-out scenarios was performed.
The existing intersection traffic control was retained for arterial intersections. All site accesses will be
controlled by stop signs. The results are as follows:
Black Cat Rd./ AWSC B
Franklin Rd.
Black Cat Rd./ Cherry AWSC B
Lane
Black Cat Rd./ North TWSC
Access
N. Access Left Turn N/A
Black Cat Left Turn N/A
Black Cat Rd./ South TWSC
Access
S. Access Left Turn N/A
Black Cat Left Turn N/A
Black Cat Rd./ EI Gato TWSC
S. Access Left Turn N/A
Black Cat Left Turn N/A
, - Add left-turn lanes on all approaches.
F
F
C.
C
C
N/A
N/A
A
B
N/A
N/A
A
B
N/A
N/A
A
B
The intersection of Black Cat Road and Franklin Road is an all-way stop controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 14 seconds. If the current control
is used in the forecast year 2007, the intersection will operate a LOS F with an average delay of 59
seconds without the traffic generated by Castle brook. The background traffic volumes alone justify
intersection improvements by 207. At build-out of the Castlebrook site, the intersection is projected to
operate a LOS F with a delay of 76 seconds. At the forecast background traffic volumes, the Black
Cat Road /Franklin Road will operate at an unacceptable LOS. In order to improve Black Cat Road
and Franklin Road several different improvement options were considered. Of the improvement
options analyzed, the addition of left-turn lanes on all approaches with an all way stop control is
recommended. With the improvement the intersection will operate at LOS C at 2007 build-out, with
an average delay of 18 seconds per vehicle.
4
The intersection of Black Cat Road and Cherry Lane is an all-way stop controlled intersection. The
overall intersection is currently operating at a LOS B with a delay of 10 seconds. If the current control
is used in the forecast year 2007, the intersection will operate a LOS C with an average delay of 17
seconds without the traffic generated by Castle brook. At build-out of the Castle brook site, the
intersection is projected to operate at a LOS C with a delay of 18 seconds. The projected build-out
traffic volumes do not require any improvements.
The site north access intersection will be a 2-way stop-controlled intersection. The left-turn
movement from site access is projected to operate at a LOS A with a delay of 7 seconds at build-out
year. The left-turn movement from Black Cat Rd. into the development operates at LOS B with 12
seconds of delay. A left-turn bay is warranted on Black Cat Rd. due to high opposing volumes. A
right-turn bay is not warranted on Black Cat Rd. for entrance to the development.
The site south access intersection will be a 2-way stop-controlled intersection. Westbound left-turn
movement is projected to operate at a LOS A with a delay of 7 seconds at build-out year. The left-
turn movement from Black Cat Rd. into the development operates at LOS B with 11 seconds of delay.
A left-turn bay is warranted on Black Cat Rd. based on ACHD's left-turn deceleration-lane warrant
guidelines. A right-turn bay is not warranted on Black Cat Rd. for entrance to the development.
The EI Gato site access intersection will be a 2-way stop-controlled intersection. The left-turn
movement from EI Gato is projected to operate at an LOS of B with a delay of 11 seconds at build-out
year. A left-turn bay on Black Cat Rd. for entrance to the development may be warranted. However,
since the left-turning volumes into the subdivision are minor, a left-turn bay is not warranted into EI
Gato Road. A right-turn bay is not warranted on Black Cat Rd. for entrance to the development.
Existing and Future Traffic Projections on Vicinity Roadways:
Black Cat N/ Cherry Lane 5,262 306 5,568 14,000 Minor Arterial
Black Cat N/ Project 4,160 565 4,725 14,000 Minor Arterial
Black Cat S/ Project 4,160 565 4,725 14,000 Minor Arterial
Black Cat S/ Franklin 3,767 294 4,061 14,000 Minor Arterial
Cherry Lane W/ Black Cat 9,741 38 9,779 14, 000 Minor Arterial
Cherry Lane E/ Black Cat 13,080 220 13,300 37,000 Principal Arterial
Franklin W/ Black Cat 9,097 110 9,207 14,000 Minor Arterial
Franklin E/ Black Cat 9,569 160 9,729 14,000 Minor Arterial
, - Numbers adjusted to reflect appropriate thresholds
Site Access and Circulation:
Black Cat Road requires left-turn lanes for traffic turning into the site at both the North and South
approaches. Right-turn lanes are not required for any of the approaches. A left-turn lane is not
recommended for traffic turning into the site at the EI Gato approach. All site access locations meet
ACHD's policy requirements. Traffic volumes on the North, South and EI Gato approaches do not
exceed 1000 vpd. All of the internal streets have daily traffic projections lower than 1000 vpd. The
preliminary site design on these streets meets ACHD's access policy.
5
The following are the principal recommendations of the study:
Based on the left turning movements and opposing traffic volumes, a left-turn bay is warranted on
Black Cat Road at the north site access. A right-turn bay is not warranted on Black Cat Road for
entrance to the development.
Based on the left turning movements and opposing traffic volumes, a left-turn bay is warranted on
Black Cat Road at the south site access. A right-turn bay is not warranted on Black Cat Road for
entrance to the development.
Franklin Road does not have the capacity to handle the background traffic in 2007. Widening
Franklin Road, by ACHD, will allow the collector to operate at an acceptable LOS. Any widening of
Franklin Rd. will be able to accommodate the projected build-out traffic, which is under 1 % of the total
projected 2007 traffic volumes.
The intersection of Black Cat/Franklin is over capacity under the background traffic conditions. The
construction by ACHD of left-turn bays at all approaches is necessary to improve the intersection
operation to an acceptable LOS. Improvements to the intersection to accommodate the projected
background traffic will also handle the additional site traffic. This intersection also meets the rural
peak hour signal warrant in the design year.
The intersection of Black Cat/Cherry Lane operates at an acceptable LOS in the design year. No
changes are required at the intersection if Black Cat Road and Cherry Lane Road.
The site EI Gato's access intersection will be a 2 way stop-controlled intersection. The left turn
movement from the site access is projected to operate at an LOS of B with a delay of 11 seconds at
the build out year. As per ACHD's left-turn deceleration-lane guidelines, a left-turn bay on Black Cat
Road for entrance to development falls into the "may be warranted" category. However, since the left
turning volumes are so minor into EI Gato Lane, it is our recommendation to not construct a left-turn
bay. A right turn-bay is not warranted on Black Cat Road for entrance to the development.
4. Site Information: The site has one existing single-family dwelling.
5. Description of Adjacent Surrounding Area:
North: Coral Creek Subdivision
South: Large single-family residential lots (5-acres +)
East: Large 38.9-acre agricultural parcel
West: Large single-family residential lots (1-acre +)
6. Impacted Roadways
Black Cat Road
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
1 ,320-feet
Minor arterial
North of Franklin Road was 2,686 on 4-24-02.
Better than "C.
35 MPH
6
Cherry Lane
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
Franklin Road
Frontage:
Functional Street Classification:
Traffic count:
Level of Service:
Speed limit:
None
Principal arterial
East of Black Cat Road was 6,634 on 7-31-01.
West of Black Cat Road was 4,823 on 7-6-00.
Better than "C"
35 MPH
None
Minor arterial
East of Black Cat Road was 7,097 on 4-24-02
West of Black Cat Road was 5,934 on 4-24-02.
Better than "C"
45 MPH
7. Roadway Improvements Adjacent To and Near the Site
Black Cat Road is improved with 24-feet of pavement (2-traffic lanes) with no curb, gutter or sidewalk.
Cherry Lane is improved with 5-traffic lanes with curb, gutter and sidewalk.
Franklin Road is improved with 24-feet of pavement (2-traffic lanes) with no curb, gutter or sidewalk.
8. Existing Right-of-Way
The Black Cat Road right-of-way varies in width. Abutting the northern portion of the site, there is 50-
feet of right-of-way (25-feet from centerline). Abutting the southern portion of the site, there is 55-feet
of right-of-way (25-feet from centerline).
Cherry Lane currently has 85-feet of right-of-way (40-feet from centerline).
Franklin Road currently has 55-feet of right-of-way (30-feet from centerline).
9. Site History
The District has not previously reviewed an application for this site.
10. Five Year Work Program
The District does not have any roadway improvements within this area that are scheduled within the
Five Year Work Program.
Findings for Consideration
1. Right-of-Way
District policy requires 96-feet of right-of-way on arterial roadways (Figure 72-F1 B). This right-of-way
allows for the construction of a 5-lane roadway with curb, gutter, 5-foot concrete detached sidewalks
and bike lanes.
2. Sidewalk
District policy requires 5-foot wide (minimum) concrete sidewalk on all arterial and collector streets
(7204.6.5).
7
The applicant should construct 5-foot concrete sidewalk on Black Cat Road abutting the parcel. The
sidewalk should be constructed 2-feet within the right-of-way. If the sidewalk meanders outside of the
right-of-way, the applicant should provide an easement.
3. Roadway Offsets
District policy 7204.11.6, requires local roadways to align or offset a minimum of 125-feet from
another local roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum of 150-feet from a
residential collector roadway (measured centerline to centerline).
District policy 7204.11.6, requires local roadways to align or offset a minimum of 300cfeet from an
arterial roadway (measured centerline to centerline).
The applicant is proposing three roadways that are proposed to intersect Black Cat Road.
. The first entrance, Gillette Street, is proposed to intersect Black Cat Road approximately
265-feet (measured center line to center line) south of West Big Creek Street. This
location does not meet District policy. The applicant should construct Gillette Street a
minimum of 300-feet (measured centerline to centerline) south of West Big Creek Street.
. The second entrance, Hearst Drive, is proposed to intersect Black Cat Road
approximately 530-feet north of the south property line. This location meets District policy
and should be approved with this application.
. The third entrance, West EI Gato Road is proposed to intersect Black Cat Road at the
half-mile. This roadway will also align with the roadway that exists on the west side of
Black Cat Road. This roadway location meets District policy and should be approved with
this application.
The internal roadways appear to meet District policy and should be approved with this application.
4. Roadway Street Sections
District policy 7204.4.2 states, "developments with any buildable lot that is less that 1.5-acres in size
will typically provide streets having a minimum pavement width of 32-feet with curb, gutter and
sidewalks. The total street width shall be 36-feet from back-of-curb to back-of-curb. Variations of this
width may be allowed, depending on traffic volumes forecast to be generated by the development.
Concrete sidewalks shall be a minimum of 5-feet in width unless they are separated from the curb 5-
feet or more in which case the sidewalk shall be a minimum of 4-feet in width.
District policy 7204.4.1 requires right-of-way widths for all streets and highways shall not be less than
fifty feet wide except in unusual circumstances. A right-of-way less than 40-feet will not be permitted.
District policy 7203.4.1 states that if a proposed development abuts an unpaved street or streets, the
developer shall construct improvements, including curb, gutter and concrete sidewalk, plus an
additional 12-feet of paved surface beyond the centerline established for the street. The developer
shall dedicate additional right-of-way, if required. Concrete sidewalks shall be a minimum of 5-feet in
width unless they are separated from the curb by 5-feet or more in which case the sidewalk shall be a
minimum of 4-feet in width.
8
According to AASHTO guidelines and District policy 7203.3, if the proposed development is not
served by a paved public street, the developer shall provide a 24-foot wide (minimum) paved street
from the proposed development to the public street specified by the District. Wider street widths may
be required depending on the magnitude of the development and other factors, including the potential
for bicycle, bus and pedestrian traffic.
The applicant is proposing to construct EI Gato Street to intersect Black Cat Road at the half-mile.
This roadway is not identified as a collector roadway on the 2020 Functional Street Classification
System Map but is identified as a mid-mile collector within the JUB Collector Study. The JUB
collector study has not yet been finalized or adopted
Due to the fact that the EI Gato Street is not identified as a future collector on the 2020 Functional
Street Classification System Map, the Commission has not adopted the findings of the JUB Collector
study, and the conclusions from the submitted traffic impact study state that the traffic volumes on EI
Gato Street are consistent with a residential collector staff is not recommending that EI Gato Street be
constructed as a collector roadway. Staff recommends that EI Gato Street be constructed as a
residential collector with a 36-foot street section with vertical curb, gutter and 5-foot sidewalk within
50-feet of right-of-way. Due to the fact that this roadway will be classified as a residential collector,
front on housing should be restricted on this roadway. ACHD is not requiring the construction of this
roadway. If the applicant chooses to construct the roadway or is required to construct this roadway
under another agency's jurisdiction, the roadway should be constructed to ACHD standards.
The applicant is proposing to construct EI Gato Street at the south property line (at the mid mile).
Due to the fact that the applicant is proposing to construct EI Gato Street on the south property line,
the applicant should construct EI Gato Street as one half of a 36-foot street section with vertical curb,
gutter and 5-foot concrete sidewalk, plus 12-feet of additional pavement. The applicant should also
restrict direct access to EI Gato Street. This restriction should be noted on the final plat.
5. Stub Streets
District policy 7203.5.1 and 7205.5 requires stub streets to provide intra-neighborhood circulation and
to provide access to adjoining parcels. District policy also requires temporary turnarounds with a
temporary easement provided to the District at the end of stub streets that serve more than one lot, or
are greater than 150-feet in length with a sign at the terminus of the roadway stating that, "THIS
ROAD WILL BE EXTENDED IN THE FUTURE".
The applicant is proposing to extend Golfview Way at the north property line. Golfview Way was
approved with the Coral Creek Subdivision. Staff is supportive of the extension of this stub street.
The applicant is proposing to construct a stub street, Bolt Street, to the east property line
approximately 560-feet north of the south property line. Staff is supportive of this stub street location.
Due to the fact that Bolt Street is one lot in depth, the applicant is not required to provide a temporary
turnaround at the terminus of the roadway. The applicant should install a sign at the terminus of the
roadway stating that, "THIS ROAD WILL BE EXTENDED IN THE FUTURE".
West EI Gato Road is proposed to extend from Black Cat Road to the east property line as a stub
street. Biltmore Avenue intersects West EI Gato Road approximately 1 OO-feet west of the east
property line. Due to the fact that Biltmore Avenue functions as a temporary turn around, the
applicant will not be required to construct a temporary turnaround at the terminus of the roadway.
9
6. Turnarounds
District policy 7205.2.1 requires turnarounds to be constructed to provide a minimum turning radius of
45-feet. The applicant should also be required to provide a minimum of a 29-foot street section on
either side of any proposed center islands within the turnarounds. The medians should be
constructed a minimum of 4-feet wide to total a minimum of a 100-square foot area. Dedicate 54-feet
of right-of-way plus the additional width of the median.
T-type turnarounds will be allowed at the ends of local streets where the site configuration or other
demonstrated constraints exist to prevent the use of a typical circular turnaround. The minimum
measurements of the T -type turnaround shall be sufficient to provide a minimum curb radius of 18-
feet at any change of direction of the curb line.
The applicant is proposing to construct a T-type turnaround (a hammerhead turnaround) at the
terminus of Glamorgan Place. Staff has determined that there is a site configuration or other
demonstrated constraint (the Kennedy Lateral) that prevent the use of a standard cul-de-sac
turnaround. The applicant should construct an acceptable turnaround at the terminus of Glamorgan
Place. The turnaround should meet the approval of the Districts Plan Review staff and the
jurisdictional Fire District.
7. Turn Lanes
According to the submitted traffic impact study the left turn bay warrants are met at the Black Cat
Road and Gillette Street intersection as well as the Black Cat Road and Hearst Drive intersection.
The applicant should construct a left turn bay on Black Cat Road at the Gillette Street intersection.
The applicant should coordinate the design of the left turn bay with the District's Traffic Services Staff.
The Traffic Services Department can be reached at 387-6140.
The applicant should construct a left turn bay on Black Cat Road at the Hearst Drive intersection.
The applicant should coordinate the design of the left turn bay with the District's Traffic Services Staff.
The Traffic Services Department can be reached at 387-6140.
Site Specific Conditions of Approval
1. Dedicate 48-feet of right-of-way from the centerline of Black Cat Road abutting the parcel by means of a
warranty deed. The right-of-way purchase and sale agreement and deed must be completed and signed
by the applicant prior to scheduling the final plat for signature by the ACHD Commission or prior to
issuance of a building permit (or other required permits), whichever occurs first. Allow up to 30 business
days to process the right-of-way dedication after receipt of all requested material. The owner will be paid
the fair market value of the right-of-way dedicated which is an addition to existing ACHD right-of-way if
the owner submits a letter of application to the impact fee administrator prior to breaking ground, in
accordance with the ACHD Ordinance in effect at that time (currently Ordinance #195).
2. Construct 5-foot (minimum) concrete sidewalk on Black Cat Road abutting the site. Locate the sidewalk
2-feet within the new right-of-way. If the sidewalk meanders outside of the right-of-way, provide an
easement for the sidewalk.
3. Construct Gillette Street a minimum of 300-feet (measured centerline to centerline) south of West Big
Creek Street.
4. Construct Hearst Drive to intersect Black Cat Road approximately 530-feet north of the south property
line, as proposed.
10
5. Construct West EI Gato Road to intersect Black Cat Road at the half-mile, as proposed.
6. Construct all local roadways to align or offset a minimum of 125-feet from another local roadway
(measured centerline to centerline).
7. Construct all of the internal roadways as 36-foot street sections with curb, gutter and 5-foot concrete
sidewalk within 50-feet of right-of-way, as proposed.
8. Construct EI Gato Street as one half of a 36-foot street section with vertical curb, gutter and 5-foot
concrete sidewalk, plus 12-feet of additional pavement within 42-feet of right-of-way. The applicant
should also restrict direct access to EI Gato Street. This restriction should be noted on the final plat.
9. Extend Golfview Way at the north property line, as proposed.
10. Construct a stub street, Bolt Street, to the east property line approximately 560-feet north of the south
property line and install a sign at the terminus of the roadway stating that, "THIS ROAD WILL BE
EXTENDED IN THE FUTURE".
11. Construct an acceptable turnaround at the terminus of Glamorgan Place. Coordinate the design of the
turnaround with District staff and submit a letter showing that the jurisdictional Fire District has reviewed
and approved the alternative turnaround.
12. Comply with all Standard Conditions of Approval.
D. Standard Conditions of Approval
1. Any existing irrigation facilities shall be relocated outside of the right-of-way.
2. All utility relocation costs associated with improving street frontages abutting the site shall be borne by
the developer.
3. Replace any existing damaged curb, gutter and sidewalk and any that may be damaged during the
construction of the proposed development. Contact Construction Services at 387-6280 (with file number)
for details.
4. Utility street cuts in pavement less than five years old are not allowed unless approved in writing by the
District. Contact Construction Services at 387-6280 (with file numbers) for details.
5. All design and construction shall be in accordance with the Ada County Highway District Policy Manual,
ISPWC Standards and approved supplements, Construction Services procedures and all applicable
ACHD Ordinances unless specifically waived herein. An engineer registered in the State of Idaho shall
prepare and certify all improvement plans.
6. The applicant shall submit revised plans for staff approval, prior to issuance of building permit (or other
required permits), which incorporates any required design changes.
7. Construction, use and property development shall be in conformance with all applicable requirements of
the Ada County Highway District prior to District approval for occupancy.
8. Payment of applicable road impact fees are required prior to building construction in accordance with
Ordinance #195, also known as Ada County Highway District Road Impact Fee Ordinance.
11
9. It is the responsibility of the applicant to verify all existing utilities within the right-of-way. Existing utilities
damaged by the applicant shall be repaired by the applicant at no cost to ACHD. The applicant shall be
required to call DIGLlNE (1-800-342-1585) at least two full business days prior to breaking ground within
ACHD right-of-way. The applicant shall contact ACHD Traffic Operations 387-6190 in the event any
ACHD conduits (spare or filled) are compromised during any phase of construction.
10. No change in the terms and conditions of this approval shall be valid unless they are in writing and
signed by the applicant or the applicant's authorized representative and an authorized representative of
the Ada County Highway District. The burden shall be upon the applicant to obtain written confirmation
of any change from the Ada County Highway District.
11. Any change by the applicant in the planned use of the property which is the subject of this application,
shall require the applicant to comply with all rules, regulations, ordinances, pians, or other regulatory and
legal restrictions in force at the time the applicant or its successors in interest advises the Highway
District of its intent to change the planned use of the subject property unless a waiver/variance of said
requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is
sought.
E. Conclusions of Law
The proposed site plan is approved, if all of the Site Specific and Standard Conditions of Approval are
satisfied.
ACHD requirements are intended to assure that the proposed use/development will not place an undue
burden on the existing vehicular and pedestrian transportation system within the vicinity impacted by the
proposed development.
Attachments
Vicinity Map
Site Plan
Appeal Guidelines
12
Request for Reconsideration of Commission Action:
A Commissioner, a member of ACHD staff or any other person objecting to any final action taken by the
Commission may request reconsideration of that action, provided the request is not for a reconsideration of
an action previously requested to be reconsidered, an action whose provisions have been partly and
materially carried out, or an action that has created a contractual relationship with third parties.
Only a Commission member who voted with the prevailing side can move for reconsideration, but the motion
may be.seconded by any Commissioner and is voted on by all Commissioners present.
If a motion to reconsider is made and seconded it is subject to a motion to postpone to a certain time.
The request must be in writing and delivered to the Secretary of the Highway District no later than 3:00 p.m.
on the day prior to the Commission's next scheduled regular meeting following the meeting at which the
action to be reconsidered was taken. Upon receipt of the request, the Secretary shall cause the same to be
placed on the agenda for that next scheduled regular Commission meeting.
The request for reconsideration must be supported by written documentation setting forth new facts and
information not presented at the earlier meeting, or a changed situation that has developed since the taking
of the earlier vote, or information establishing an error of fact or law in the earlier action. The request may
also be supported by oral testimony at the meeting.
If a motion to reconsider passes, the effect is the original matter is in the exact position it occupied the
moment before it was voted on originally. It will normally be returned to ACHD staff for further review. The
Commission may set the date of the meeting at which the matter is to be returned. The Commission shall
only take action on the original matter at a meeting where the agenda notice so provides.
At the meeting where the original matter is again on the agenda for Commission action, interested persons
and ACHD staff may present such written and oral testimony as the President of the Commission determines
to be appropriate, and the Commission may take any action the majority of the Commission deems
advisable.
If a motion to reconsider passes, the applicant may be charged a reasonable fee, to cover administrative
costs, as established by the Commission.
13
SEP-15-2002 23:32
,-.""..--. .
LAND CONSULTANTS INC
208 938 5873 P.02/02
~;;-_?~,
'~A~'
Ada County Highway District
REQUEST FOR MODIFICATION OF POLICY
(To be submitted prior to Commission action or staff approval.)
i-'N ~;';~'SX~'=:i'-Z.-;ij:";J'~-2~Z~':7'r~:;:'7j."~-rs-J.-;~"~'_._._--_....,........_--_...."...._'_.. -.............., -..-.--.."]
!Address:)). ;J. J-r-JJ... 5.f. EA"J)e f13'16 '
i Phone Number: 738-]8/d-. ;;, i
! Project File Number, Description & Location: ClJs-lle6,oojt.. Svb \.!i'P 02-0{6 //'Il1i7_0~ -F2
~---.,~___"__........~~_........-.........._......__....~..._,.___...____...,_._~~,,,.....'................._.._.............~~_~_,.....__w_ ..1""".-*.'--"---."--;
i List the Site Spec.ific Requirement(s) For Which You Are Requesting a Modification!
I of Policy: Dldf,d fo/'eJ 7) OS"', 2. I (((OV,,.,;.Ij fUlrJ,,!/O'hJpZS -Ie;> 6e I
! (o,vsl'vr-ftJ.. TO flov,;Je ,.-I;..J;"'""" -11.11""',.1) (fj,)'vs of 'fr- .('..~f. I
! ..
t !
I i
j i
- - ~-~----_.__. ' , 1
What are the grounds for the modification? Include an explanation of how the intent I
of the development policy will still be met if the request is granted, and contain an !
I accurate description of the physical conditions that preclude compliance with the i
I policy. j"/t I";.ft,,,-J r,..;:/I Ie. troe I- 6~ fto\.IiJ,;J, c.... FIfE._ Oefll,fyr,p,.J ,.,ojl,.,f )
! f(AI,~ 1U(t,J-MOv,J1.. b:J ""'~^r'S of "'- ;")l}mfYI'/;"('~/ "/,S';,J. We. AIl"1L C{PI'~J~~
l.frotl' Jo e S;/"Il ..,c fY)/"I' Z"'/-o F,;of. OeIJ'Jrl,..,p,.;f, 0 ViL lu fAt.. co,..; {: j" I....J'~... I
; oP .JAI! fl'{HI";., c...,;J. /6C"~'''''' 01 .fA~ J:,.",N.1 / -/ I (' fl /,( I
i / C <'f) t.-~ O/'ll ,^;-o./ cv - ',S.,. ~
l-fu/,.) - Alo""'.A. cMpol i-),'IS'~"I/'J {';-/ w:Jh,~ 1-1,1- t<u.... J I i
, .
I
i
!
t
I ____..._ I
! AP~~r~.__..._....__...__....._."._~.!.~.~~tl_..~Lt__.",_~.,...._.".____...___..~....._.__....__~.....J
--NOTE~P]~;se att~ch all statements, letters, maps, etc. that will support the request for modification.
Right-of-Way and Developmem Services" 318 EaSl37'h SIreet" Garden City, Idaho 83714
208-387-6170 phone 208-387-6393 fax
TDTAL P.02
Castlebrook Subdivision
z,....-. ~".' ".
. . .."
N
W+E
S
.
,
I
'~
I
'I
.........................................
------------
\
I
r
~
\~~
i'"
i ,
,
.
1\
\,
\'
\ .
1'\
\:
---~'\
,--
,
"t
\\ '
,I
I,
. )\
_ /~ I
\
-- 4. I
...._.6iT '
{
I
,
,
I J,1i
,,~..
.
t
(')
>
~
III
::0
~
~~~\
\1'\'
\1 I;~ \1\\\\1
@r\,\\\tl \ \\'1""
UHH l\" W\,\\nH'
II, .. 'I II, III i \\'1,' p
I "I ,..,
, \ U\,
\
,
~
III
9
s;
III
~
~\f\h,\W'r~t~\\\~
\ill U\ ,m', \~~ ~\\ ,
~"fi \"1 I\~ I
~ hi \\\Wl~ ~\ \
m 'l 1,1,: i~t '1 \
l;~~\ i\ \ \\ .\ ,\ fJ. \h
, \\j\'\\ ,~,~~H
-;;ill.
lIt" \ l 1
i'f' 'I .I
. \ I.~\ll
, \~~\.
, I
III Ilj.
ilUI,
~\ )
(I
,
,
..
J
] LEGEND 0
335 PEAK HOUR 0::
=
f- ~
13,5041 = ADT <(
] u
::<:
u
<(
....J
1 co
~ ~ ~ 't:.13Ei
fJ ~ '+ _537
1 CHERRY LN .129
19,7791 31 j' ~tt+ ~
J 345 __
15 .. OJr--",
.....<9<.0
.....
<Xl
1 .....01
N..... 1::..11
~'+
.11
J ,. NORTH APPROACH
01
......
] "'<.0
1~ 1::..9
.9
J ~ t,. soutH APPROACH
J
'"
J
EL GATO
J
J Nr--<.O 1::.. 79
Ul"'..-
...... _445
FRANKLIN RD ~52
J .. >'~.. .. ". ~ '""",".6OlIl.I
19.211l71 ~tt+ 19.7291
..-en..-
J N:::N
~
J
~,.... BY, P , sc.....uN. Figure 6
SIGH BY,P.D{lflT D.[, ..UC;Sl
J .., ~ H..IAR 'C , , Build Out Peak Hour Traffic
" Washingto~
Heartland Homes: Castlebrook Subdivision
J