Loading...
HomeMy WebLinkAboutSD.3_STORM DRAIN - DETAILS 16213 N. Cloverdale Rd. Suite 125 Boise, Idaho 83704 t.208.846.8955f.208.846.8956c.208.867.3954ross@ericksoncivil.com erickson civil DATE NO. REVISION PREPARED BY:PROJECT MANAGER:JOB NUMBER:PH: (208) 846-8955 FAX:(208) 846-8956 DRAWN BY: ERICKSON CIVIL, INC.- RKESHEET NUMBER:SHEET TITLE: DATE: IDB2355OWNER:PROJECT TITLE:SAGARRA SUBDIVISION PHASE 1MERIDIAN, ID SAGARRA PHASE 1, LLC PROFESSIONALE OHADIFOETATS E R IC KSON KSSOR1 0 8 1 3 NGIN E ERREG I STERED 6-9-23Plans Are Accepted For PublicStreet Construction- -7-5-23 LD-RSUB-2023-0013 & FP-2023-0008 & A-2023-0102SEEPAGE BED CROSS SECTION 1 SD.3 1,000 GALLON SAND AND GREASE (S & G) TRAP 2 SD.3 DRAIN ROCK SPECIFICATION GEOTEXTILE SPECIFICATION SD.3 1 1. NON WOVEN FILTER FABRIC ON TOP, ENDS, AND ALL SIDES OF SEEPAGE BED. CONCRETE COLLAR PER ISPWC SD-616 (REQ. IN ALL PAVED AREAS. NOT REQUIRED WHERE SAND AND GREASE TRAP LIDS ARE LOCATED COMPLETELY WITHIN A PLANTER GROUT (TYP.) 24" DIA. CAST IRON RING AND COVER PIPE INVERT (GROUT)20" 8'8"12" SEE NOTE 4 TOP OF LOWER BAFFLE EL. PLACE TRAPS ON 8" THICKNESS OF CHIPS OVER NATIVE UNDISTURBED EARTHAS REQ.1,000 GALLON SAND AND GREASE TRAP 5'-2"6" MINGROUT GROUT GROUT GROUT GROUT GROUT GROUT BACKFILL SAND AND GREASE TRAP WITH CHIPS ROADWAY SECTION OR LANDSCAPE PLANTER (SEE PLANS) PLACE WOVEN GEOTEXTILE FABRIC ON PAVEMENT SECTION SUBGRADE OVER SAND AND GREASE TRAP. FABRIC SHALL EXTEND A MINIMUM OF 6-FEET BEYOND THE SAND AND GREASE TRAP ON ALL SIDES. (SKAPS GEONET TN220 OR APPROVED EQUAL) - GEOTEXTILE FABRIC IS NOT REQUIRED UNDER LANDSCAPE AREAS. SEEPAGE BED PIPE IN INLET SIDE OUTLET SIDE35"24" DIA. CAST IRON RING AND COVER OF TANKACHD RIGHT-OF-WAY MONOLITHIC CONCRETE COLLARS MONOLITHIC CONCRETE COLLAR PER ISPWC SD-616 JOINT 24" DIA. CAST IRON RING AND COVER"H"SEE NOTESBELOWEL A EL C EL B EL D WATER TIGHT SEAL CONCRETE GRADE RINGS AND/OR RISER SECTION AS REQUIRED (12" MAX GRADE RING HEIGHT) FLOW OUT NOTES 1. MUST BE RATED FOR HS-25 TRAFFIC LOADS 2. INTERIOR DIMENSIONS OF TRAP MUST BE A MINIMUM OF 48" X 24" AT THE THROAT LOCATION. 3. THE DETAIL ABOVE SHOWS AN VALLEY PRECAST 1,000 GALLON SAND & GREASE TRAP. 4. THE SAND AND GREASE TRAPS SHALL BE SET SO THAT THE TOP OF LOWER BAFFLE ELEVATION, THE IE'S PIPES ENTERING, AND THE PIPES EXITING ARE IN ACCORDANCE WITH THE PROJECT PLANS AND NOTE 9 BELOW. 5. SAND AND GREASE TRAP COVERS SHALL MATCH THE FINISHED GRADE ELEVATION AND SLOPE. 6. SOLID COVERS SHALL HAVE THE WORDS "STORM DRAIN" CAST INTO THE LID. 7. DO NOT CONSTRUCT CONCRETE COLLARS FOR SAND AND GREASE TRAP COVERS LOCATED COMPLETELY WITHIN LANDSCAPE AREAS. 8. H<1FT USE GRADE RINGS (TYP.) 1-FT < H <= 2-FT USE 24" DIA. RCP RISER; 2-FT < H <= 10-FT USE 48" MANHOLE CONE AND 48" RISERS. 9. EL. A > EL. B BY 0.10 MIN; EL. D < EL. B BY 0.85 MIN.; EL. C < EL. B BY 0.50 MIN. 10. MANHOLE FRAME AND COVER PER ISPWC SD-617. 11. BOX MANUFACTURER SHALL MARK FLOW DIRECTION AND LABEL INLET AND OUTLET ON SIDE OF BOX. 12. SEE ACHD STORMWATER DESIGN GUIDELINES BMP #1 "SAND AND GREASE TRAP" FOR ADDITIONAL REQUIREMENTS. 1 2 PERFORATED 18" HDPE PIPE @ 0.0% (SEE INFILTRATION GALLERY SECTION DETAIL 5.00' NON. PERF. PIPE (TYP.) 24" DIA. CAST IRON RING AND COVER CONCRETE COLLARS ARE NOT REQUIRED WHEN LID IS LOCATED COMPLETELY WITHIN A PLANTER AREA SOLID WALL ADS HDPE PIPE @ 0.0% NON. PERF. PIPE 5.0' INTO SEEPAGE BEDINLET SIDE18" 1 2 PERF. PIPE PERFORATION SCHEDULE 38" DIA PERFORATION IN VALLEYS OF CORRUGATED PIPE. 5 EA. 18" DIA. DUAL WALL ADS PIPE (SEE PLAN FOR PIPE SIZE)45°45°45°45°3/8" DIA. PERFORATION 18" PIPE PERF. EL SEE PLAN FOR PIPE SIZE INSTALL 6 OZ/SY NON-WOVEN GEOTEXTILE FABRIC AASHTO M288 CLASS 2 ON TOP & SIDES IMPERMEABLE SILTS AND CLAY EXISTING POORLY GRADED GRAVEL FINISHED GRADE SEEPAGE BED WIDTH = SEE PLANS VARIESTOP OF DRAIN ROCK BOTTOM OF DRAIN ROCK/ TOP OF ASTM C33 SAND BOTTOM OF ASTM C33 SAND BOTTOM OF DRAIN ROCK STRUCTURAL FILL BETWEEN BOTTOM OF ROAD SECTION AND TOP OF DRAIN ROCK FOR BEDS WITHIN PAVED AREAS COMPACTED TO 95% MAX DRY DENSITY PER ASTM D1557 2" CLEAN ANGULAR DRAIN ROCK ASTM C33 FILTER SANDDRAIN ROCKTHICKNESSGROUND WATER EL = GREATER THAN 20.00 FEET BGS VARIES18" DIAMETER DUAL WALL ADS 1 2 PERFORATED PIPE @ 0.0% (SEE PLAN FOR PIPE SIZE ). PIPE SHALL BE PERFORATED AS SHOWN ON THE PIPE PERFORATION SCHEDULE INCLUDED ON THIS DETAIL SHEET - CAP END. PERFORATED PIPE IE TO TOP OF DRAIN ROCK 18" 1 2 PERFORATED PIPE IE. - SEE PLAN FOR PIPE SIZE AND PLACEMENT IN BED 3.00'MIN.1.50'DESIGN INFILTRATION RATE = 8.0" PER HOUR (ALL SEEPAGE BEDS) 1 1 11.50' MN. COVERSTORM DRAIN - DETAILS 1 SEEPAGE BED NOTES: 1. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF GROUNDWATER IS ENCOUNTERED AT AN ELEVATION HIGHER THAN THE BOTTOM ELEVATION OF THE LINED SEEPAGE BED; OR, WITHIN 3-FEET OF THE BOTTOM ELEVATION OF AN UNLINED SEEPAGE BED. 2. ALL GEOTEXTILE FABRIC SEAMS SHALL OVERLAP 1-FOOT MINIMUM, UNLESS OTHERWISE DIRECTED BY THE MANUFACTURER. 3. THE FULL ROADWAY SECTION IS REQUIRED OVER THE SEEPAGE BED IN PAVED AREAS. 4. SEE STORM DRAIN PLANS FOR ADDITIONAL INFORMATION. 5. THE BOTTOM ASTM C33 SAND ELEVATION IS THE MINIMUM EXCAVATION DEPTH. 6. SEE ACHD STORMWATER DESIGN GUIDELINES BMP #20 "SEEPAGE BED" FOR ADDITIONAL REQUIREMENTS - "OPTIONAL CHAMBERS ARE NOT REQUIRED. 7. GROUNDWATER WAS DETERMINED WITHIN THE PROJECT GEOTECHNICAL REPORT TO BE DEEPER THAN 2558, WHICH IS DEEPER THAN 20-FEET BELOW THE GROUND SURFACE AS DETERMINED WITHIN THE GOETECHNICAL REPORT PREPARED BY JACOBS DATED 1/31/20. 8. THE DESIGN VOLUME OF THE FACILITY DOES NOT INCLUDE VOIDS WITHIN THE ASTM C33 FILTER SAND LOCATED AT THE BOTTOM OF THE FACILITY. 9. THE SEEPAGE BED WIDTH SHALL REMAIN CONSTANT ALONG THE LONGITUDINAL LENGTH OF THE SEEPAGE BED. 10. IF ROCK IS ENCOUNTERED, CONTRACTOR MUST HAVE A PERCOLATION TEST PERFORMED BY A SOILS ENGINEER AFTER SEEPAGE BED IS FULLY EXCAVATED (NOTE: AN ACHD INSPECTOR MUST BE PRESENT TO WITNESS THE TEST FOR IT TO BE CONSIDERED VALID). IF THE PERCOLATION IS LESS THAN THAT SPECIFIED BY THE SOILS REPORT AND ENGINEER, CONTRACTOR MAY NEED TO BLAST OR BORE TO CREATE CONDUIT FOR DRAINAGE TO OCCUR, OR RE-DESIGN THE SYSTEM TO ACHIEVE THE REQUIRED INFILTRATION. ACHD APPROVAL IS REQUIRED FOR ANY MODIFICATIONS TO THE STAMPED, APPROVED DESIGN PLANS. 11. FOR UNDERGROUND INFILTRATION SYSTEMS, INSTALL ELECTRONIC MARKERS ON EACH CORNER OF THE FACILITY. THE CONTRACTOR SHALL COORDINATE WITH THE ACHD INSPECTION DEPARTMENT FOR PLACEMENT OF THE MARKERS DURING CONSTRUCTION, AND PRIOR TO BACKFILLING. PRIVATE SEEPAGE BEDS DO NOT REQUIRE ELECTRONIC MARKERS. PERCOLATION TEST REQUIRED AT EACH SEEPAGE BED LOCATION: 1. THE DESIGN PERCOLATION RATE FOR THE SEEPAGE BED INFILTRATION FACILITIES IS 8 INCHES/HR. UNDER DIRECTION OF THE OWNER'S GEOTECHNICAL REPRESENTATIVE, CONTRACTOR SHALL CONDUCT A PERCOLATION TEST TO BE WITNESSED BY THE OWNER'S GEOTECHNICAL REPRESENTATIVE & ACHD. ACHD IS NOT REQUIRED TO WITNESS PERCOLATION TESTS FOR PRIVATE INFILTRATION FACILITIES. CONTRACTOR SHALL PROVIDE ALL WATER, AND OTHER MATERIALS REQUIRED TO PERFORM THE TEST. THE PERCOLATION TEST SHALL BE PERFORMED BY THE SOILS ENGINEER AFTER THE SEEPAGE BED IS EXCAVATED TO VERIFY THE DESIGN INFILTRATION RATE. (NOTE: AN ACHD INSPECTOR MUST BE PRESENT TO WITNESS THE TEST FOR IT TO BE CONSIDERED VALID). IF THE PERCOLATION IS LESS THAN THAT SPECIFIED BY THE SOILS REPORT AND ENGINEER, CONTRACTOR SHALL CONTACT ENGINEER TO RE-DESIGN THE SYSTEM TO ACHIEVE THE REQUIRED INFILTRATION. ACHD APPROVAL IS REQUIRED FOR ANY MODIFICATIONS TO THE STAMPED, APPROVED DESIGN PLANS. STORM DRAIN SERVICE 3 SD.3 FLOWFLOW FLOW 6" SDR 35 PVC6" X 4" WYE 4" SDR 35 PVC @ 2.0%3.00'FLOWPROPERTY LINE2.00'SIDE LOT LINE 5.00' C/L 1.00'2.00' FINISHED GRADE P/LC/LSERVICERISERC/L 6"STORMCOMMON LOT BUILDING LOT PVC THREADED CAP PVC THREADED CAP 4" SDR 35 PVC WYE 4" SDR 35 PVC RISER 4" SDR 35 PVC @ 2.0% 6" X 4" SDR 35 PVC WYE FLOW 2.00'PLAN VIEW SECTION VIEW A-A A A COMMON LOT BUILDING LOT STORM DRAIN SERVICE STORM DRAIN SERVICE 08/04/23 FP-2023-0008