Loading...
HomeMy WebLinkAboutC1.0_COVER SHEET, LEGEND, & CONTACTS6213 N. Cloverdale Rd. Suite 125 Boise, Idaho 83704 t.208.846.8955f.208.846.8956c.208.867.3954ross@ericksoncivil.com erickson civil DATE NO. REVISION PREPARED BY:PROJECT MANAGER:JOB NUMBER:PH: (208) 846-8955 FAX:(208) 846-8956 DRAWN BY: ERICKSON CIVIL, INC.- RKESHEET NUMBER:SHEET TITLE: DATE: IDB2355OWNER:PROJECT TITLE:SAGARRA SUBDIVISION PHASE 1MERIDIAN, ID SAGARRA PHASE 1, LLC PROFESSIONALE OHADIFOETATS E R IC KSON KSSOR1 0 8 1 3 NGIN E ERREG I STERED 6-9-23Plans Are Accepted For PublicStreet Construction- -7-5-23 LD-RSUB-2023-0013 & FP-2023-0008 & A-2023-0102C1.0 FOUND BRASS/ALUMINUM CAP 5/8" IRON PIN WITH PLASTIC CAP CALCULATED POINT FOUND 5/8" IRON PIN WITH PLASTIC CAP FOUND 1/2" IRON PIN WITH PLASTIC CAP SET 1/2" IRON PIN WITH PLASTIC CAP EXISTING SEWER EXISTING WATER EXISTING CABLE EXISTING CENTERLINE EXISTING DITCH EXISTING EDGE OF GRAVEL EXISTING EDGE OF PAVEMENT EXISTING FENCE EXISTING FIBER OPTICS EXISTING GAS EXISTING GRAVITY IRRIGATION EXISTING JOINT TRENCH EXISTING OVERHEAD POWER EXISTING PRESSURE IRRIGATION EXISTING STORM EXISTING TELEPHONE EXISTING TELEPHONE & FIBER EXISTING TOE OF SLOPE EXISTING TOP OF BANK EXISTING UNDERGROUND POWER PROPOSED SEWER PROPOSED 8" SEWER PROPOSED 6" SEWER PROPOSED 4" SEWER PROPOSED WATER PROPOSED 1" WATER PROPOSED 1.5" WATER PROPOSED 2" WATER PROPOSED 6" WATER PROPOSED 8" WATER PROPOSED 10" WATER PROPOSED 12" WATER PROPOSED STORM DRAIN PROPOSED PRESSURE IRRIGATION PROPOSED GRAVITY IRRIGATION PROPOSED EDGE OF PAVEMENT PROPOSED EDGE OF GRAVEL PROPOSED SAWCUT PROPOSED DITCH CENTERLINE PROPOSED TOP OF BANK PROPOSED TOE OF SLOPE PUID EASEMENT PROPOSED GRADE BREAK PROPERTY LINE SIGNAL JUNCTION BOX SIGNAL BENCHMARK SLOPE TOP BACK OF CURB TOP BACK OF REVERSE CURB TOP BACK OF VERT. CURB W/O GUTTER TOP BACK OF ROLLED CURB TOP OF WALK CONCRETE SPOT ELEVATION LIP OF GUTTER FLOW LINE ASPHALT EDGE OF PAVEMENT EDGE OF GRAVEL CENTERLINE BACK OF WALK FINISHED GRADE GROUND CONCRETE PIPE CORRUGATED METAL PIPE PVC PIPE EXISTING TREE EXISTING LIGHT EXISTING MAILBOX EXISTING CONTOUR PROPOSED CONTOUR EXISTING SIGN EXISTING MANHOLE EXISTING INLET EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT PROPOSED VALVE PROPOSED METER PROPOSED BLOW-OFF WATER FITTINGS PROPOSED SAND AND GREASE TRAP CONCRETE CURB AND GUTTER CONCRETE IRRIGATION BOX DIRECTION OF DOWNWARD SLOPE DIRECTIONAL STRIPING CABLE RISER POWER/ELECTRICAL TELEPHONE RISER POWER/TELEPHONE POLE CLEANOUT KEYED NOTE TBC TBC-R TVC TRC WALK CONC LIP FL AC EP EG CL BOW FG GND CMP RCP PVC 1 XX ------DETAIL NUMBER SHEET NUMBER A GEOTECHNICAL INVESTIGATION WAS PERFORMED AS PART OF THE DESIGN OF THIS PROJECT BY JACOBS DATED 1/31/20. ALL CONDITIONS AND REQUIREMENTS CONTAINED THEREIN ARE HEREBY INCORPORATED IN TO THESE CONSTRUCTION PLANS AND CONTRACT FOR THE WORK BY REFERENCE. WHERE CONFLICTS EXIST BETWEEN THE GEOTECHNICAL INVESTIGATION AND THE PROJECT PLANS AND SPECIFICATIONS, THE MORE STRINGENT REQUIREMENTS SHALL APPLY. SAGARRA SUBDIVISION NO. 1 FINAL PLAT - SAGARRA SUBDIVISION NO. 1 C1.0 COVER SHEET, LEGEND, & CONTACTS C1.1 NOTES C1.2 TOPOGRAPHIC SURVEY GD.0 GRADING PLAN - OVERALL GD.1 GRADING PLAN - AREA A GD.2 GRADING PLAN - AREA B GD.3 GRADING PLAN - DETAILS RD.0 ROADWAY - TYPICAL SECTIONS RD.1 ROADWAY - N. ARLISS AVE & W. MALBAR ST. (STA 1+09 TO 6+40) RD.2 ROADWAY - W. MALBAR ST. (STA 6+40 TO 11+31.90) RD.3 ROADWAY - PEDESTRIAN RAMP GRADING RD.3.1 ROADWAY - PEDESTRIAN RAMPS W. ORCHARD PARK DR. RD.4 ROADWAY - DETAILS SD.1 STORM DRAIN (ACHD) - AREAS 1, 2 & 3 SD.2 STORM DRAIN (PRIVATE) - AREAS 4 & 5 SD.3 STORM DRAIN - DETAILS 1 SD.4 STORM DRAIN - DETAILS 2 SD.5 STORM DRAIN - DETAILS 3 SS.1 SEWER LINE A (STA 1+00 TO 6+00) SS.2 SEWER LINE A (STA 6+00 TO 10+84.68) SS.3 SEWER LINE B (STA 1+00 TO 4+45.83) SS.4 SEWER LINE C (STA 1+00 TO 4+54.11) W.1 WATER PLAN - WEST W.2 WATER PLAN - EAST SL.1 STREET LIGHT PLAN - CITY OF MERIDIAN SG.1 SIGNAGE & MAILBOX PLAN S0.00 GENERAL STRUCTURAL NOTES S1.00 FOUNDATION PLAN SEE LANDSCAPE PLANS FOR PRESSURE IRRIGATION SUPPLY AND DISTRIBUTION. MERIDIAN, IDAHO NORTHN. LINDER RD.W. CHINDEN BLVD.COVER SHEET, LEGEND, & CONTACTS DEVELOPER SAGARRA PHASE 1, LLC C/O MICHAEL SLAVIN, MANAGING PARTNER 404 S. 8TH ST. #300A1 BOISE, ID 83702 MICHAEL@ACCOMPLICE GROUP T.208.900.8028 CIVIL ENGINEER ERICKSON CIVIL, INC. PROJECT MANAGER - ROSS ERICKSON P.E. 6213 N. CLOVERDALE ROAD SUITE 125 BOISE, IDAHO 83712 T.208.846.8955 C.208.867.3954 ROSS@ERICKSONCIVIL.COM PROFESSIONAL JJ HOWARD ENGINEERING LAND SURVEYOR PROJECT MANAGER - ERIC HOWARD P.L.S. T.208.283.8522 ERICH@JJHOWARDENJ.COM IRRIGATION NORTH SLOUGH LATERAL USERS ASSOC. DISTRICT ROD WAGNER T.208.761.0041 PRESSURE PRIVATE HOA SYSTEM IRRIGATION WATER SUPPLIED BY THE NORTH SLOUGH LATERAL USERS ASSOC. CITY OF MERIDIAN BUILDING DEPARTMENT 33 E, BROADWAY AVE. MERIDIAN, ID 83642 T.208.887.2211 WATER SERVICE CITY OF MERIDIAN WATER DEPT. PROVIDER 2235 NW 8TH ST. MERIDIAN, ID 83646 T.208.888.5242 SEWER SERVICE CITY OF MERIDIAN PROVIDER 33 E, BROADWAY AVE. MERIDIAN, ID 83642 T.208.898.5500 POWER IDAHO POWER COMPANY SCOTT PINKSTON T.208.388-5446 GAS INTERMOUNTAIN GAS CO. BRYCE OSTLER T.208.377.6812 TELEPHONE CENTURY LINK LEO ARTEAGA T.208.385.2440 LEO.ARTEAGA@CENTURYLINK.COM PROJECT DATUM: NAVD 88. CONTRACTOR SHALL CONFIRM NAVD 88 ELEVATIONS AND LOCATIONS FOR ALL PROJECT CONTROL POINTS PRIOR TO START OF CONSTRUCTION. TO BE ESTABLISHED AND VERIFIED IN FIELD BY SURVEYORCP# X LD-RSUB-2023-0013 & FP-2023-0008 & A-2023-0102 08/04/23 FP-2023-0008