HomeMy WebLinkAbout11-PRIVATE STREET SECTIONNOTES 1. ALL ASPHALT PAVEMENTS AND BASE MATERIALS, AND SUB-GRADE PREPARATIONS SHALL BE PROVIDED IN ACCORDANCE WITH THE ISPWC AND THE PROJECT GEOTECHNICAL REPORT. 2. AGGREGATE BASE MATERIALS (3/4" MINUS CRUSHED AGGREGATE & 6" MINUS UNCRUSHED AGGREGATE) MATERIALS SHALL COMPLY WITH DIVISION 800 OF THE ISPWC. 3. ALL SUBGRADES, STRUCTURAL FILL, AND BASE MATERIAL PREPARATIONS SHALL BE APPROVED BY OWNER'S GEOTECHNICAL REPRESENTATIVE PRIOR TO COVERING UP THE WORK OR PLACING SUBSEQUENT LIFTS. 4. ASPHALT PAVEMENT SHALL BE COMPACTED IN ACCORDANCE WITH THE ISPWC AND THE PROJECT GEOTECHNICAL REPORT. DENSITY TESTING SHALL BE PERFORMED RANDOMLY ACROSS THE SITE AT A FREQUENCY TO BE DETERMINED BY THE OWNER'S GEOTECHNICAL REPRESENTATIVE. PRIVATE STREET SECTION 4" THICKNESS OF 3 4" MINUS CRUSHED AGGREGATE BASE COMPACTED TO 95% MAX DRY DENSITY PER ASTM D1557 14" THICKNESS OF 6" MINUS UNCRUSHED AGGREGATE BASE COMPACTED TO 95% MAX DRY DENSITY PER ASTM D1557 GRANULAR STRUCTURAL FILL AS REQUIRED BY SITE CONDITIONS 6" MINUS UNCRUSHED AGGREGATE BASE COMPACTED TO 95% MAX DRY DENSITY PER ASTM D1557 2.5" THICKNESS OF ASPHALT PLANT MIX PAVEMENT 1 2" SUPERPAVE SP-3 MIX DESIGN W/PG-58-28 1.0% MIN.1.0% MIN 25.00' MIN. - (VARIES SEE PLAN) 12.50' MIN. - (VARIES SEE PLAN)12.50' MIN. - (VARIES SEE PLAN) VARIESVARIES 1.5% 5.00'5.50'4.00' 9.50' 6" THICK CONCRETE SIDEWALK PER ACHD SUPPLEMENTAL DRAWING SD-709 ASPHALT PAVEMENT PER 3/GD.3 GD.3 3 ASPHALT PAVEMENT PER 3/GD.3CONCRETE VALLEY GUTTER PER ACHD SUPPLEMENTAL DRAWING SD-708 (SEE 3/RD.4) 12" WIDE CONCRETE RIBBON CURB - (SEE 4/GD.3) ASPHALT PAVEMENT SECTION PRIVATE STREET TYPICAL SECTION 1.00'TOP OF CURB SLOPES DOWNWARD AT 1.5% TOWARDS STREET SUBGRADE SHALL BE PREPARED AND PROOF COMPACTED PER THE SITE PREPARATION SECTION OF THE GEOTECHNICAL REPORT AND BE APPROVED BY OWNER'S GEOTECHNICAL REPRESENTATIVE PRIOR TO PLACEMENT OF OF ANY SUBBASE AGGREGATE OR GRANULAR STRUCTURAL FILL 08/04/23 FP-2023-0008