Loading...
HomeMy WebLinkAboutCC - Narrative km E N G I N E E R I N G July 6,2023 Project No.: 20-023 Mr. Bill Parsons, Planning Supervisor City of Meridian Community Development Department 33 E. Broadway Ave.,Ste. 102 Meridian, ID 83642 RE: Sessions Parkway—Meridian, ID Development Agreement Modification Application Dear Mr. Parsons: On behalf of GFI—Meridian Investments, LLC.,we are pleased to submit the attached applications and required supplements for a development agreement modification for the approved Sessions Parkway Subdivision. Site and Background Information The subject property is approximately 5.32 acres and is comprised of one parcel, identified as parcel number S1104233650 and address 2700 N Eagle Road in Meridian. The site is located north of East River Valley Street, south of Ustick Road,east of Eagle Road,and west of Records Avenue. Currently the Property is subject to a •s,f mr P Development Agreement, which is Instrument No. 2017-121321. In January 2023, a development agreement modification and preliminary plat was approved for thej site (file no. H-2022-0046). The associated Development Agreement was recorded as Inst. No. 2023- 033831. This application proposes to modify a condition included with the most - recent approval to allow the applicant the opportunity to obtain a building .� '. . 3 permit and for all future users to obtain certificate of zoning compliance and design review approval prior to plat �.�"1� .". 1.77 recordation. A request to modify the - -' -- - Q 25-foot landscape buffer required ry 1 abutting the multi-family use to the east is also included. 5725 North Discovery Way • Boise, Idaho 83713 • 208.639.6939• kmengllp.com Development Agreement Modification The DA and findings associated with file no. H-2022-0046 include a provision governing the development of the Property,which we are requesting to revise in the revised development agreement,specifically: VIII.A.1b. The subject property shall be subdivided prior to submittal of the first Certificate of Zoning Compliance application for the site. The applicant requests that this condition be modified to allow a building permit for one of the proposed lots prior to plat recordation. In addition,the applicant requests to allow all future users the opportunity to obtain certificate of zoning compliance and design review prior to plat recordation.There are several details related to improvements required along SH-55 that could extend typical reviews and timeframes expected with recording a final plat. Since coordination of improvements required to SH-55 and the approval of related construction plans are contingent upon approval from outside agencies, the applicant requests the flexibility to work with potential tenants before recordation. Proposed Revised Condition VIII.A.1b. The subject property a I I he s14bdi.,:, edpr e.p t oe,;uA,.itkai 4 th e{:-st Ger-&f4 at c ZePH'49 Gengp ^^Le^Gpp4eetien f^r the site may obtain one building permit prior to plat recordation.Subsequent proposed uses within the subdivision may submit certificate of zoning compliance and design review application prior to plat recordation. Through site plan development for an extended stay hotel concept(as contemplated with Option#2 in the DA),it has been determined that the 25-foot landscape buffer required as part of the existing DA is not feasible.The extended stay hotel will be processing a Conditional Use Permit application to permit the hotel use and associated site plan.The CUP will be submitted under the same owner but with a different developer that is working with Wyndham on the hotel concept. The applicable DA condition is noted below: VIII.A.1c. A 25 foot wide buffer shall be installed along the eastern boundary of the site adjacent to the future residential uses,landscaped per the standards listed in UDC 11-38-9C, unless otherwise modified by City Council. Construction of the buffer may take place with lot development. As part of the present MDA application,the owner requests to modify the landscape buffer requirement to the adjacent residential use to reflect the current site plan.The hotel site plan has been revised to optimize open space and pedestrian connections throughout the western part of the site and adjacent to the building to benefit future hotel guests and employees.The space available to accommodate a buffer to the east has been decreased slightly,with approximately 8'—12'available along the eastern boundary. A site plan depicting the proposed buffer width has been included herein for review. PAG E 2 Conclusion The Sessions Parkway project will complement surrounding residential and commercial uses and is consistent with the City's goals for this area. Improvements planned along SH-55, consolidation of access points and potential users will benefit the area and complete an undeveloped section of commercial property.Allowing the applicant the opportunity to work with tenants prior to plat recordation will enable them the flexibility needed with tenants and potential users in today's market. Should you have questions or require further information in order to process these applications, please feel free to contact me. Sincerely, KM Engineering,LLP Stephanie Hopkins Land Planning Manager cc: GFI—Meridian Investments, LLC. PAGE13